HomeMy WebLinkAboutELIZABETH & CITY PARK CORNER REDEVELOPMENT - FDP - FDP120003 - CORRESPONDENCE - (3)City of
F6rt Collins
Project: Elizabeth & City Park Corner Redevelopment
Date: July 20, 2012
Stormwater Engineering's Unresolved Issues:
Made By: Wes Lamarque
Initial Date: 07/17/2012 Issue ID: 1 Topic: General Round: 1 Status: Active
Issue: 07/17/2012: More detail is needed for the Rain Garden. The outlet sturcture needs to be shown with
the spill elevation. The grading from the pond to the sidewalk is too steep. This should be a 4 to 1
slope.
Initial Date: 07/17/2012 Issue ID: 2 Topic: General Round: 1 Status: Active
Issue: 07/17/2012: The rain garden needs to be in a drainage easement. OK
Initial Date: 07/17/2012 Issue ID: 3 Topic: General Round: 1 Status: Active
Issue: 07/17/2012: Please include the soil media sepecifications on the Detail Sheet 11.
Initial Date: 07/20/2012 Issue ID: 4 Topic: General Round: 1 Status: Active
Issue: 07/20/2012:
1) The Erosion Control Plan was in need of the sequencing of the Construction Activities. The locations
of the BMPs were correct however there were no sequencing needs.
2) The Erosion Control Report was not included and needs to fulfill the Design Criteria.
Page 1 of 9