Loading...
HomeMy WebLinkAboutELIZABETH & CITY PARK CORNER REDEVELOPMENT - FDP - FDP120003 - CORRESPONDENCE -Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221-6854, rbuffington(cDfcqov.com Topic: Construction Drawings Comment Number: I Comment Originated: 07/17/2012 07/17/2012: The existing sewer service is noted as a drop connection in the utility database. If the invert of the new service is more than 2 feet above the sewer exiting the MH, install an outside drop connection. Topic: Landscape Plans Comment Number: 2 . Comment Originated: 07/17/2012 07/17/2012: Show the fire line and domestic water service on the landscape plan and adjust trees and shrubs to provide the required separation distances. Department: Zoning Contact: Noah Beals, 970.416-2313, nbeals(a)fcqov.com Topic: General Comment Number: 1 Comment Originated: 07/16/2012 07/1612012: Sheet Al the north building elevation A note pointing to the Metal Panel labels it as CMU Block k Department: Light And Power Contact: Doug Martine, 970.224-6152, dmartine@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/25/2012 O6/2512012: Builder will need to coordinate power requirements, electric meter location, and electric development charges with Light & Power Engineering (221-6700). Comment Number: 2 Comment Originated: 06/25/2012 06/25/2012: After the site plan is final an AutoCad drawing (V2008) needs to be sent to Terry Cox (TCOX@FCGOV.COM). Department: Stormwater Engineering Contact: Wes Lamarque, 970-416.2418, wlamargue@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/17/2012 07/17/2012: More detail is needed for the Rain Garden. The outlet sturcture needs to be shown with the spill elevation. The grading from the pond to the sidewalk is too steep. This should be a 4 to 1 slope. Comment Number: 2 Comment Originated: 07/17/2012 07/17/2012: The rain garden needs to be in a drain gqqasement. OK Comment Number: 3 Comment Originated: 07/17/2012 07/17/2012: Please include the soil media se 6citicaNbons on the Detail Sheet 11. , Department: Technical Services Contact: Jeff County, 970.221-6588, jcountv(@fcg 'V.com Topic: Building Elevations "I VIIIII Comment Number: 3 Comment Originated: 07/13/2012 07/13/2012: No comments. Topic: Construction Drawings Comment Number: 4 07/13/2012: There are text over text issues on sheet 5. Topic: Landscape Plans Comment Number: 2 07/13/2012: No comments. Topic: Site Plan Comment Number: 1 07/13/2012: No comments. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffington(D.fcaov.com Comment Originated: 07/13/2012 Comment Originated: 07/13/2012 Comment Originated: 07/13/2012 i Department: Engineering Development Review Contact: Andrew Gingerich, 970.221.6603, aginaerich(afc-gov.com Topic: Construction Drawings Comment Number: 3 Comment Originated: 07/17/2012 07/17/2012: Sheet 3 - Repeat Comment from PDP "The curb head along Elizabeth and near the existing handicap ramps at the corner of City Park and Elizabeth in in need of repair. These sections of curb head will need to be removed and replaced as necessary".. Please add a note to the demolition plan in place of the current "protect in place" or add reference to note . Comment Number: 4 Comment Originated: 07/17/2012 07/17/2012: Sheet 4 - Please include additional dimensioning and callouts for sidewalks, parking stall depth, access width, etc. Comment Number: 5 Comment Originated: 07/17/2012 07/17/2012: Sheet 5 - Please correct the couple of text over text occurences on this sheet. Comment Number: 6 Comment Originated: 07/17/2012 07/17/2012: Sheet 6 - Label curb and gutter type and locations within the parking lot and provide corresponding curb and gutter details on detail sheets. Comment Number: 7 Comment Originated: 07/17/2012 07/17/2012: Sheet 9 - Please label on the Horiz. control,plan and/or grading plan the different curb and gutter types being proposed and show the`corrre ondmg details. Comment Number: 8 L Comment Originated: 07/17/2012 07/17/2012: Sheet 9 - Please provide the detail, or°t edri way being proposed (707). Comment Number: 9 07/17/2012: Sheet 10 - Is please provide a detail. Comment Number: 10 07/17/2012: Sheet 10 - It i proposed. Comment Number: 11 Comment Originated: 07/17/2012 being proposed on the project? If so, Comment Originated: 07/17/2012 site plan the concrete channel detail is being Comment Originated: 07/17/2012 07/17/2012: Sheet 11 - The design sheets callout a "rain garden" but the detail for the porous landscape detention area does not mention rain garden. Please ensure detail and callout are consistent in callouts. Comment Number: 12 Comment Originated: 07/17/2012 07/17/2012: Please provide some grade arrows with slope callouts on the grading plan. Specifically in the area of the handicap parking stall and driveway approaches. Topic: Site Plan Comment Number: 1 Comment Originated: 07/17/2012 07/17/2012: Please correct "bot" with "not" in the note 12 of the site plan. Department: Light And Power Contact: Doug Martine, 970.224.6152, dmartine(&fcaov.com Topic: General Community Development and City of Neighborhood services Fort Collins 261 North College Avenue Box 580 Fort Fort Collins, CO 80622 970.221.6750 970.224.6134 - fax fcgov. com/developmentreview July 18, 2012 Cathy Mathis The Birdsall Group 444 Mountain Ave Fort Collins, CO 80521 RE: Elizabeth & City Park Corner Redevelopment, FDP120003, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or clevingston@fcgov.com. Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970.416.2283, clevAcis on fe' ov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 07/1712012 07117/2012: Please add a note tonewe building elevations (in two places) indicating the gas electrical meters will be painted brown to match CMU block veneer. Comment Number: 2 07/17/2012: Remove "PDP" from the title of Drawing At of 3 (Elevations) Topic: Lighting Plan Comment Number: 1 07/17/2012: Please provide final lighting plan. Department: Engineering Development Review. Contact: Andrew Gingerich, 970.221.6603, agingerich(rilfcgov.com Topic: Construction Drawings Comment Originated: 07117/2012 Comment Originated: 07/17/2012 Comment Number: 2 Comment Originated: 07/17/2012 07/17/2012: Sheet 1 - PDP can be removed from title as it does not need to be a part of the project title.