Loading...
HomeMy WebLinkAboutWILLOW BROOK AMENDED ODP - 27-10 - SUBMITTAL DOCUMENTS - ROUND 1 -TST, INC. CONSULTING ENGINEERS TST _ 3. Acknowledged 4. Acknowledged Park Planning No comment Fire Authority 1. Acknowledged - Fire hydrant spacing and fire flow will be designed to meet the required standards. 2. Residential Automatic Fire Sprinkler comment acknowledged 3. Address Numerals comment acknowledged 4. Acknowledged - Turning Radii where applicable will be designed to accommodate fire requirements however none are currently anticipate. 5. Lady Moon Drive comment acknowledge 6. Street Name(s) and Addressing comment acknowledge Engineering Development Review 1. Acknowledged 2. TDRF are included with the submittal as required. 3. Acknowledged 4. A traffic memo / update is provided with this submittal 5. Acknowledged Electrical Engineering 1. Acknowledged 2. Acknowledged Current Planning 1. Zoning comments indicated that this is a Type is a Type 1 or Type 2 Review Process 2. Acknowledged 3. Acknowledged 4. Acknowledged. 5. Acknowledged. 6. Acknowledged. 7. Acknowledged. Review, please confirm whether this 748 Whalers Way ■ Fort Collins, CO 80525 •970.226.0557 page 2 TST, INC. (,QNSULTING ENGINEERS October 26, 2010 Attn. Ted Shepard, City Planner City of Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 RE: Willow Brook Amended ODP — Response to CRT Comments dated August 23, 2010 Zoning 1. Acknowledged 2. Acknowledged Water -Wastewater Engineering 1. Acknowledged Transportation Planning 1. Off-street pedestrian connections are anticipated from Galileo Drive to the central pocket park as well as from the internal local street to the central pocket park. On street pedestrian sidewalks are anticipate along each of the public streets. 2. The north -south off-street pedestrian connection will provide connections for most of the Parcel A lots to the central open space. The lots along Cinquefoil Lane will be able to utilize the public sidewalk route. 3. Bicycle movement is accommodated within public right-of-way per LUCASS street standards. 4. A bicycle and pedestrian level of service study (prepared by Delich Associates on September 29, 2010) has been completed. This pedestrian analysis demonstrates compliance with required levels of service. A copy of this memorandum is included with this ODP Amendment submittal. This memorandum was included with the variance request submittal dated October 1, 2010 that was approved on October 1, 2010 by Ward Stanford. Stormwater Engineering 1. Acknowledged - A letter'of compliance is provided with the revision of the ODP. A more detailed analysis will be provided with the PDP and FP. 2. Acknowledged - The overall basin will be designed to discharge at or below the design required by the Willow Brook final drainage report. The 36" rcp from the intersection of Galileo and Cinquefoil will be removed. We believe that the discharge from the site will be low enough, do to reduction in C value, so as to hold the design capacity of the Willow Brook storm system. The inlets on Star Dust will either be removed or modified to act as junction boxes where applicable. 748 Whalers Way ■ Fort Collins, CO 80525 ■ 970.226.0557 Page 1