HomeMy WebLinkAboutCITY OF FORT COLLINS POLICE SERVICES FACILITY - PDP - 29-05 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYLIST OF FIGURES
Figure
Page
1.
Site
Location ........................................
3
2.
Recent
Peak Hour Traffic .............................
5
3.
Site
Plan ............................................
8
4.
Trip
Distribution ....................................
9
5.
Short
Range (2007) Background Peak Hour Traffic ......
11
6.
Site
Generated Peak Hour Traffic .....................
12
7.
Short
Range (2007) Total Peak Hour Traffic ...........
13
8.
Short
Range (2007) Geometry ..........................
16
A
B
C
D
E
F
G
APPENDIX
Base Assumptions Form/Condition Diagrams
Recent Peak Hour Traffic
Existing Peak Hour Operation/Level of Service Descriptions/Fort
Collins Motor Vehicle LOS Standards
Signal Warrants
Short Range Background Peak Hour Operation
Short Range Total Peak Hour Operation
Pedestrian/Bicycle/Transit Level of Service Worksheets
TABLE OF CONTENTS
Page
I. Introduction ......................................... t.
II. Existing Conditions .................................. 2
LandUse ............................................. 2
Streets 2
Existing Traffic ..................................... 4
Existing Operation ................................... 4
Pedestrian Facilities ................................ 4
Bicycle Facilities ................................... 4
Transit Facilities ................................... 4
III. Proposed Development ................................. 7
Trip Generation ...................................... 7
Trip Distribution .................................. 7
Background Traffic Projections ....................... 10
Trip Assignment ....................................... 10
Signal Warrants ...................................... 10
Operation Analysis ................................... 10
Pedestrian Level of Service .......................... 17
Bicycle Level of Service ............................. 17
Transit Level of Service.............................'17
IV. Conclusions .......................................... 18
LIST OF TABLES
Table . Page
1. Current Peak Hour Operation .......................... 6
2. Trip Generation .................................. 7
3. Short Range (2007) Background Peak Hour Operation .... 14
4. Short Range (2007) Total Peak Hour Operation ......... 15
FORT COLLINS POLICE SERVICES FACILITY
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
JUNE 2005
Prepared for:
The Neenan Company
P.O. Box 2127
Fort Collins, CO 80522
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
oPP�p RE-G�S,T
0-';A �•'��vW
n a
15263 =:•