HomeMy WebLinkAboutCITY OF FORT COLLINS POLICE SERVICES FACILITY - FDP - 29-05A - CORRESPONDENCE - (5)Topic: Storm Line Profiles
Number: 67 Created: 1 /5/2006
[1/5/06] Please show the 100 year HGL on all storm sewer profiles.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/WW
Number: 75 Created: 1 /13/2006
[1/13/06] No comments.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: zoning
Number: 66 Created: 12/22/2005
[12/22/05] Page 5 of 10 Parking Breakdown - the grid lines on the page make it almost
impossible to read. And we really don't even need that page. Parking information can be
included on the regular site plan.
Comments from Current Planning
The large wall along Timberline Road needs enhanced mitigation. Please reduce the
number of evergreen shrubs and replace with evergreen trees.
2. 1 have inspected the existing parking lot light fixtures at the Windsor Bank of Choice
and they will work. Additional comments regarding foot-candle measurements and the
use of double -headed poles near the west property line will be forthcoming after
conferring with Light and Power.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerer
Ted Shepard
Chief Planner
Page 4
Department: Engineering Issue Contact: Dan DeLaughter
Topic: Utility Plan Detail Sheets
Number: 71 Created: 1 /9/2006
[1/9/06] Detail D-6. Sidewalk is incorrectly dimensioned. The dimension should be 6", not
4".
Department: Light & Power Issue Contact: Monica Moore
Topic: Utility Plans
Number: 65 Created: 12/15/2005
[12/15/05] Please submit a one -line diagram showing how the backup generator is to be
isolated from the City's electric system.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan
Topic: Detention Pond
Number: 62 Created: 9/13/2005
[1/5/06] Pond is shown to be lined with dryland seed, even in the low flow channel, please
revise.
[9/13/05] How will the pond be landscaped in a manner that would allow the 0.5% swale to
function appropriately. Otherwise the pond should be lined with a concrete pan.
The detention pond is being designed with a micro -pool. Have the maintenance and the
potential mosquito issues been discussed with the Police Department ? We are not
discouraging such a proposed use, we are just trying to make sure that the maintenance
needed for such a facility would be understood.
Please make sure that the vegetation planned in the area covered by the micro -pool is
appropriate for a wet area.
Topic: Erosion/Sediment Control
Number: 74
[1/11/06] 1.
BMP's being utilized.
Created: 1 /11 /2006
The plan sheet needs a legend for
2. The silt fencing shown on the plan is inside the streets which are also being
constructed. Why?
3. How does the southeast detention pond outlet, and is the construction of any pipeline
there protected?
4. There must be a note on the plan that disturbed areas are to be seeded/mulched (per
your report and calculations).
5. Your calculations don't seem to include the same BMP's shown on the plan.
Topic: Plat
Number: 63 Created: 9/13/2005
[1/5/06] Need to see a copy of the revised plat by Stantec.
[9/13/05] Please modify the plat so that the drainage easement does not extend beyond the
limits of the proposed detention pond.
Page 3
[9/6/05] The curb return radii shown on the plat/street design done by Stantec was redlined
as incorrect and needs to be corrected/coordinated with this plan set. Please see Jim Allen -
Morley with Stantec.
Topic: Landscaping
Number: 50 Created: 9/6/2005
[1/9/06] Repeat: One low stone wall still shown.
[9/6/05] Walls are shown on the site plans but are not shown on the landscape plans.
Please coordinate the plan sets.
Number: 51 Created: 9/6/2005
[1/9/06] Repeat: I will check with Susan on this per our discussion on 1/11/06.
[9/6/05] Sheet 5: Please use LCUASS detail 1706F in lieu of the bike rack detail shown.
Topic: Parking Lot
Number: 38 Created: 9/6/2005
[1/9/06] The 50' parking setback is not met off of Nancy Gray Avenue. Please revise the
layout. 50' is measured from the street flowline.
Per our discussion on 1/11/06, 2 parking spaces will be removed to accommodate this
standard.
[9/6/05] Parking stalls and setbacks are not shown in accordance with detail 19-6 (setback
is 50'), or 19-7. Parking stalls must be 19' in length but can be reduced to 17' with a 2'
overhang as long as the sidewalk is widened an additional 2' to accommodate that. Some
areas are hard to tell whether or not that requirement is met because not all sidewalks are
dimensioned.
Department: Engineering Issue Contact: Dan DeLaughter
Topic: Site and Landscape Plans
Number: 68 Created: 1 /9/2006
[1/9/06] Street Names do not match utility plans. Sagebrush and Katandin should be
changed to Joseph Allen and Charles Brockman where they border the site.
Department: Engineering
Topic: Site Plan
Number: 45
[1/9/06] Repeat
Issue Contact: Susan Joy
Created: 9/6/2005
[9/6/05] Cover Sheet: Remove note 1 as all easements must be shown, dimensioned and
labeled on all plan sets.
Number: 53
[1 /9/06]
Created: 9/6/2005
[9/6/05] Sheet 3: See Appendix E6 for scanning requirements.
Topic: Utility Plan Detail Sheets
Number: 41 Created: 9/6/2005
[1/9/06] Please label as on -site.
[9/6/05] Please labe the modified curb and gutter detail as "On -Site" and remove the
LCUASS label at the bottem. Please provide the LCUASS detail unaltered for all curb and
gutter in the public row.
Page 2
STAFF PROJECT REVIEW
"of Fort Collins
VIGNETTE STUDIOS Date: 01/18/2006
TERENCE HOAGLUND
144 N MASON ST., SUITE 2
FORT COLLINS, CO 80524
Staff has reviewed your submittal for FORT COLLINS POLICE FACILITY PDP AND FINAL
PLANS - TYPE Il, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 12 Created: 6/29/2005
[1/9/06] Need to check this with Susan still. -Dan
[9/6/05] Not sure if this comment still applies as some of the easements shown on the plat
coming through the system separately do not appear on these plans. Site/Landscape plans
do not show/dimension or label any easements as required. For further information, no
structures of any kind (footings, overhangs, signs, etc) are allowed in the easements.
[6/29/05] A portion of the building is shown to overlap a construction easement for
Timberline. Building construction in easements is not allowed.
Number: 15 Created: 6/29/2005
[1/9/06] Craig Farver has said that sidewalks will be built by street oversizing. However, a
repay will likely be due to the city and will have to be worked into the development
agreement.
[9/6/05] Plan sets still indicate that the sidewalk along the property's frontage is existing
when this is not true. The sidewalks are not being installed by Streetoversizing and they
must be installed with this project.
[6/29/05] Sidewalks along this property's frontage will be constructed by this project, not by
Street Oversizing when they construct the streets, due to utility installation timing.
Number: 17 Created: 6/29/2005
[1/9/06] Repeat
[9/6/05] The plan sets still do not meet the requirements set forth in Appendix E6. This
comment will not stop your project from going to hearing and can be addressed in Final
Compliance. The mylars, however, will not be signed until they are scannable. Please see
JR in Tech Services if you have any questions.
[6/29/05] Please review LCUASS Appendix E for scanability requirements and revise all
plans to comply.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 32 Created: 9/6/2005
[1/9/06]
[9/6/05] Please see redlines for other comments.
Number: 36 Created: 9/6/2005
[1/9/06] Just making sure Susan checks this as I haven't seen the Stantec plans. -Dan