I appreciate your time in reviewing these plans. If ou have any further questions, please feel
free to contact rpe'.
Sinc y,
Terence C. Hoa , ASLA
Cc Bob Meserve, The Neenan Company
Michelle.Lopez Orsini, Humphries Poli Architects
Bob Almirall, Interwest Consulting Group
Ron Kechter, City of Fort Collins
Fort Collins PoliceServices
Response #2 to comments : c i v i o c j/Z50L r V ill a g e 6
144 North Mason Street Suite 2 • Fort Collins, Colorado 80524
(970) 472-9125 • F7 x:(970) 494-0728
L a n d s 'c a p e Arch i tee t u r e
S i t e P l a n n i n-g
G r a p h i c s •-
• See revised erosion calculations in the revised report dated January 25, 2006.
Topic: Plat
Number. 63 Created. 9/13/2005 .
[1151061 Need to see a copy of the revised plat by Stantec.
[9113105] Please modify the plat so that the drainage easement does not extend beyond the
limits of.the proposed detention pond.
• This has been provided previously under separate cover.
Topic: Storm Line Profiles
Number. 67 Created: 11512606
f 1151061 Please show the 100 year HGL on all storm sewer profiles.
• This has been Included in revised plans and in the report dated January 25, 2006._
Department: Stormwater-Wafer-Wastewater Issue Contact: Roger Buffington
Topic: WateNWW
Number. 75 Created. 111312006
f1/131061 No comments.
Department: Zoning Issue, Contact:. Jenny Nuckols
Topic: zoning.
Number..66 Created: 12/22/2005
[12/22/05] Page 5 of 10 Parking Breakdown - the grid lines on the page make it almost
impossible to read. And we really don't even need that page. Parking information can be .
included on the regular site plan.
• This page has been eliminated as requested, with the information placed on the site
plan.
Comments from Current Planning
1 • The large, wall along Timberline
Road needs enhanced mitigation. Please reduce the number of evergreen shrubs and
replace with evergreen trees.
• ; We have added 4 Bosnian Pine evergreen trees along Timberline as requested.
1 have inspected the existing parking lot light fixtures at the Windsor Bank of Choice and they
Will work. 'Additional comments regarding foot-candle measurements and the use of double -
headed poles near the west property line will be forthcoming after conferring with Light and
Power.
• Ron Kechter is working with Light and Power on this issue and should be resolved
within the neat two weeks.
Fort Collins Police Services
Response #2 to comments , c i v i c C X*§ r v i 1 1 a g a 5
144 North Mason Street Suite 2 • Fort Collins, Colorado 80524
(970) 472-9125 • F ax:(970) 494-0728
L a n d s c a p e A r, c h i t e c t u r e
S i t e, P l a n i n g
r a p h i
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan'
Topic: Detention Pond
Number 62 Created: 9/13/2005
[1151061 Pond is shown to be lined, with dryland seed, even in the low flow channel, please
revise.
[91131051 How will the pond be landscaped in a manner that would allow the 0.5% swale to
function appropriately.' Otherwise the pond should be lined with a concrete pan.
The detention pond is being designed with a micro -pool. Have the maintenance and the
potential mosquito issues been discussed with the Police Department ? We are not
discouraging such a proposed use, we are just trying to make sure that the maintenance
needed for such a.ficility would be understood. .
Please make sure that the vegetation planned in the area covered by the micro -pool is
appropriate for a wet area.
• This landscape plans have been revised to show a wetland seed mix at all low flow
areas within the channel.
Topic: Erosion/Sediment Control
Number. 74 Created: 111112006
[1/11106] ' 1. The plan sheet needs d legerid for BMP's being utilized..
• This legend is now included on the Cover Sheet.
2• The silt fencing shown on the plan is '
inside the streets which are also being constructed. Why?
• This steeeti are being constructed separately from this project. The silt fence is
shown in case the streets are constructed ahead of this facility in order for these
plans to stand on their own.
3• How does the southeast detention
pond outlet, and is the construction of any pipeline there protected?
• The pond outlet connects to an existing pipe. being constructed with the Timberline
Roadway Widening project. The contractor is to protect the existing pipe during
construction utilizing standard BMP's.
4• There must be a note on the plan
that disturbed areas are to be seeded/inulched-(per your report and calculations).
• This note has been added on sheet 7 of the utility plans.
5: Your calculations don't seem to
include the same BMP's shown on the plan.
Fort Collins,Police Services
Response #2 to comments . c i, v i o c �/�540� r v i l l a g e• 4
144.North MasaA Street Suite 2 • Fort Collins, Colorado 80524
(970) 472-9125 • Fax:(970) 494-0728 '
L a n d s c,a p c A r c h i t e c t u r e'
S i t e P I an n i n g
G r a. p h i c s
Department: Engineering Issue Contact., Dan DeLaughter
Topic: Site and Landscape Plans
Number. 68 Created.- 1/9/2006
[119106] Street Names do normatch utility plans. Sagebrush and Katandin should be changed
to Joseph Allen and Chartes,Brockman where they border the site.
• The street. names have been changed on all plans.,
r
Department: Engineering Issue Contact: Susan Joy
Topic: Site Plan
Number. 45 Created. 91612005
[1AJ/O6] Repeat , •
[9161051 Cover Sheet: Remove note,l as all easements must be, shown, dimensioned and
labeled on all plan sets.
• Complete, see revised plans.
Number. 53 Created., 9/6/2005
[119106]
[916105] Sheet 3: See Appendix E6 for scanning requirements.
• All plans have been revised to respond to this comment.
Topic: Utility Plan Detail Sheets
Number 4l Created. 9/6/2005
[1/9/06] Please label as on -site.
(9/6/05] Please labe the modified curb and gutter detail as "On -Site" and remove the
LCUASS label -at the bottem. Please provide the LCUASS detail unaltered for all curb and
gutter in the public row. '
Spill curb is now labeled as on -site in the revised plans.
Department: Engineering Issue.Contact. Dan DeLaughter
Topic: Utility Plan Detail Sheets
Number.' 71 Created. 1/9/2006
[1191061 Detail D-6. Sidewalk is incorrectly dimensioned. The dimension should be 6° not 4". -
• This has been corrected in the revised plans.
Department: Light & Power Issue Contact: Monica Moore
Topic: Utility Plans
Number.' 65 Created: 12/15/2005
112/15/05]• Please submit a one -line diagram showing how the backup generator is to be
isolated from the City's electric system.
• This has been provided to light and.power under separate cover.
Fort Collins Police Services
Response_#2 to comments , c i V i ,c C 1/7,5401i r• v": 1 1 a g e 3
144 North Mason Street Suite 21• Fort Collins, Colorado 80524
(970) 472-9125 • Fa :(970) 494-0728 -
1_ a n d.s c a.p a- A r c h i t e c t u r e
S i t e P l a n n i n g -
'G_r a p h i c s ,
[6129105] Please review LCUASS Appendix E forscanability requirements and revise all
plans to comply.
•. All plans have been revised to respond to this comment.
Department: Engineering /ssue.Contact: Susan Joy
Topic: General
Number: 32 Created. 9/6/2005
[119106]
[9/6/05] Please see redlines for other comments.
Number. 36 Created: 9/6/2005
[119106] Just making,sure Susan checks this as 1 haven't seen the Stantec plans. -Dan
[916105] The curb return radii shown on the plat/street design done by Stantec was redlined
as incorrect and needs to be corrected/coordinated with this plan set. Please see Jim Allen -
Morley with Stantec.
• This issue hasbeen resolved per Dan 1/23/06
Topic: Landscaping
Number. 50 Created: 9/6/2005
[119106] .Repeat. One low stone wall still shown.
[916105] Walls are shown on the site plans but are not shown on the landscape plans. Please
coordinate the plan sets.
• There are no landscape walls on this project. The item in reference is actually an,
extension of the building wall, and was mislabeled. This has been corrected.
Number. 51 ' Created: 9/6/2005
[1191061 Repeat: I will check with Susan, on this per our discussion on 1/11106.
[9161051 Sheet 5: Please use LCUASS detail 1706F in lieu of the bike rack detail shown.
• It was originally agreed with Ron Kechter and Katie Moore to use the detail'we are
showing. This detail has been used on,other city facilities, and holds more bicycles.
Topic: Parking Lot
Number 38 Created: 9/6/2005
[119106] The 50' parking setback is not met off of Nancy Gray Avenue. Please revise the
layout. 50' is measured from the street flowline.
Per our discussion on I/11106, 2 parking spaces will be removed to accommodate this
standard.
[916105] Parking stalls and setbacks are not shown in accordance with detail 19=6 (setback is
50), or 19-7. Parking stalls must be 19' in length but can be reduced to 17' with a 2' overhang .
as long as the sidewalk is widened an additional 2' to accommodate that. Some areas are
hard.to tell whether or not -that requirement is met because not all sidewalks are dimensioned.
• The parking lot has been revised by removing the two stalls in question, and .
relocating one of them. '
Fort Collins Police Services
Response:#2 to comments , C i v i o c 1/25/06 r v, l l a g e• 2
144 North Mason Street Suite 2 • Fort Collins, 'Colorado 80524
(970) 472-9125 • Fa :(970) 494-0728 ;
f ,
January 25, 2006
f
0
L a n d s c a p e A r c h i t e c t u r e
S i t e P l a n n i n g
G r"a p h i c s
Ted Shephard, •Chief Planner. -
Current Planning Division
City of Fort Collins
281 N. College Avenue
Fort Collins; CO 80524
Dear Ted,
Attached are revisions to the final development plans for the Fort Collins Police -Services .
Building. They have been revised in response to City staff and agency review comments. The
comments made and revisions requested have been addressed as follows:
Department: Engineering Issue,Contact: Katie Moore
Topic: General
Number- 12 Created. 6/29/2005
[1,,9106] Need to check this with Susan still. -Dan
[916105] Not sure if this comment still applies as some of the easements shown on the plat -
coming through ,the system separately do not appear on these plans. Site/Landscape plans
do not show/dimension or label any, easements as required. For further information, no
structures of any kind (footings, overhangs, signs, etc) are allowed in the easements.
[6/29/05]-A portion of the building is shown to overlap a construction easement for Timberline
Building construction in easements is not allowed.
• According to Dan, we are OK on this issue 1/23/06.
Number 15 1 Created. 612912005
[119106] Craig Farver has said that sidewalks will be built by street oversizing. However, a
repay will likely be due to the city and will have to'be worked into the development agreement.
[9161051 Plan sets still indicate that the sidewalk along the property's frontage is existing when
this is. not true. - The sidewalks are not being installed by Streetoversizing and they must be
installed with this project.
[61291051 Sidewalks along this property's frontage will be constructed by this project, not by
Street Oversizing when they construct the streets, due to utility installation timing.
• According to Ron Kechter, facilities is _paying fo'r the construction of the local
streets. They are simply being constructed by street oversizing as a courtesy,•
therefore no repays should be due. Contact Ron Kechter for. further information.
Number 17 Created: 612912005
[119106] Repeat
[916105] The plan sets still do not meet the requirements set forth in Appendix E6. This
comment will not stop your project from going to hearing and can be addressed in Final
Compliance. The mylars, however, will not be signed until they are scannable. Please see
JR in Tech Services if you have any questions.
Fort Collins Police Services
Response #2 to comments • C i v i c c b/Z5406 r v, i l l a g e 1