Loading...
HomeMy WebLinkAbout217 W. TRILBY RD. - PDP - PDP120006 - CORRESPONDENCE -cc: Lindsay Ex, Environmental Planner Seth Lorson, Current Planning Andrew Gingerich, Engineering Current Planning file #PDP120006 11 Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes(a)fcgov.com Topic: Building Elevations Comment Number: 8 Comment Originated: 03/08/2012 03/08/2012: The building design standards in Sec. 3.5.3 of the LUC will apply. i.e. facade treatments, base and top treatment, defining building entrances, etc. Topic: General Comment Number: 1 Comment Originated: 03/08/2012 03/08/2012: Office use as a principal use in the LMN zone is allowed subject to Planning & Zoning Board review. The garage space in the building will be considered accessory use. Comment Number: 4 Comment Originated: 03/08/2012 03/08/2012: Additional notes should be added to the Title Sheet with respect to: the manner of trash collection as described in the Planning Objectives; all light fixtures shall be down directional and shielded; no exterior storage of material, equipment of vehicles will occur on the site. Comment Number: 5 Comment Originated: 03/08/2012 03108/2012: Are there parking lot light poles? if so, show location on site plan and provide detail of height and fixture. Show wall location of light fixtures. Topic: Landscape Plans Comment Number: 6 Comment Originated: 03/08/2012 03/0812012: add note to plan that all landscaping will be installed prior to issuance of a CO or a financial guarantee will be provided to the City in the amount of 125% of the valuation of labor and material to complete landscaping and irrigation. Comment Number: 7 Comment Originated: 03/08/2012 03/08/2012: A 5' wide landscape strip with deciduous trees planted every 40' along the west, east, and south lot lines adjacent to the parking and driveway areas. At least 6% of the area of the parking lots need to be interior parking lot landscape islands. Additional street trees may be needed along Trilby. Other Departments might have more specific comments regarding that issue. Topic: Site Plan Comment Number: 2 Comment Originated: 03/08/2012 03/08/2012: The site plan is too cluttered with lines. Please remove topo lines, etc. Show building envelope dimensions on site plan Comment Number: 3 Comment Originated: 03/08/2012 03/08/2012: The Statement of Planning Objectives states that walkways will link street and sidewalks with building entries and parking lots. It's not clear on the plan how that's accomplished. Steve Olt will be retiring from his position as a City Planner effective April 1, 2012. The new planners assigned to the 217 West Trilby Road, PDP will be Lindsay Ex (970-224-6143 and lex(@@fcgov.com) and Seth Lorson. Seth will be available in the Development Review Center, 281 North College Avenue, as of Monday, March 26, 2012. Sincerely, S*M d!t Steve Olt City Planner 970-221-6341 solt@fcgov.com 10 Comment Number: 7 t,omment Originated: 03/22/2012 03/22/2012: Please see the attached document for the specific erosion control requirements during each stage of the development review process. Department: Technical Services Contact: Jeff County, 970-221-6588, jcountyCcilfcuov.com Topic: Building Elevations Comment Number: 14 Comment Originated: 03/21/2012 03/21/2012: No comments. Topic: Construction Drawings Comment Number: 15 Comment Originated: 03/21/2012 03/21/2012: Sheet 3 in the drawing index doesn't match the name on sheet 3. Comment Number: 16 Comment Originated: 03/21/2012 03/21/2012: Please provide benchmarks that are near the project site. Comment Number: 17 Comment Originated: 03/21/2012 03/21/2012: There are line over text issues on sheets 3 & 5. Topic: Landscape Plans Comment Number: 13 Comment Originated: 03/21/2012 03/21/2012: The color shading will not scan on sheet 5. It will need to be hatching or grayscale. Topic: Plat Comment Number: 1 Comment Originated: 03/21/2012 03/21/2012: The legal description & record boundary does not close or match each other. The measured boundary closes. Comment Number: 2 Comment Originated: 03/21/2012 03/21/2012: The subdivision plat name will need to change. We do not accept addresses as plat names. A simple suggestion might be West Trilby Subdivision. Comment Number: 3 Comment Originated: 03/21/2012 03/21/2012: Please add "City of Fort Collins" to the legal description as shown on the redlines. Comment Number: 4 Comment Originated: 03/21/2012 03/21/2012: Please add Owners & Lienholders (if applicable) signature blocks to sheet 1. Comment Number: 5 Comment Originated: 03/21/2012 03/21/2012: Please add the statement of lineal units per C.R.S. 38-51-106(I). Comment Number: 6 Comment Originated: 03/21/2012 03/21/2012: Please provide current monument records for all public land corners shown. Comment Number: 7 Comment Originated: 03/21/2012 03/21/2012: Please provide dedication/recording information for West Trilby Road. Comment Number: 8 Comment Originated: 03/21/2012 03/21/2012: Please label the point of commencement. Comment Number: 9 Comment Originated: 03/21/2012 03/21/2012: Please provide the source for record easements per C.R.S. 38-51-106(b). Comment Number: 10 Comment Originated: 03/21/2012 03/21/2012: The legal cannot be traced on the plat. Please call John Von Nieda with the City. Topic: Site Plan Comment Number: 11 Comment Originated: 03/21/2012 03/21/2012: Please change the subdivision name to match the plat. The plat will need to change. We do not accept addresses as plat names. Comment Number: 12 Comment Originated: 03/21/2012 03/21/2012: There are line over text & text over text issues on sheet 2. Department: Light And Power Contact: Alan Rutz, 970.224-6153, arutz(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/20/2012 03/20/2012: Electric development charges will apply for each lot as it is developed. Comment Number: 2 Comment Originated: 03/20/2012 03/2012012: Coordinate transformer locations for each building and submit C-1 form with load requirements. Will three phase power be required? Comment Number: 3 Comment Originated: 03/20/2012 03/20/2012: System modification charges may apply along Trilby. Department: PFA Contact: Ron Gonzales, 970-221-6635, rgonzalescDpoudre-fire.org Topic: General Comment Number: 1. Comment Originated: 03/20/2012 03/20/2012: The entry drive aisles and turn arounds shall be platted by separate instrument as Emergency Access Easements. The fire lanes shall be identified on the property with signage or painting and stenciling of the curbs with "Fire Lane - No Parking" This fire lane shall support 40 ton. Comment Number: 2. Comment Originated: 03/20/2012 03/20/2012: The individual addresses shall be plainly visible from the street fronting the property. Comment Number: 3. Comment Originated: 03/20/2012 03/20/12: Buildings are within access and water supply criteria. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue()fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/21/2012 03/21/2012: City criteria does not allow for drainage to be discharged into an irrigation ditch or channel. All outfalls for the detention ponds need to be released into a system that drains to the drainage swale and pipes along the south side of Trilby. Comment Number: 2 Comment Originated: 03/21/2012 03/21/2012: The water quality volume for the detention ponds can not be in the parking lot over pavement. This area which contains the water quality volume needs to be over a pervious surface. Quantity detention can be over a parking lot up to 1 foot deep. Comment Number: 3 Comment Originated: 03/22/2012 03/22/2012: Drainage easements are required for all detention facilities and storm sewer outfalls. Comment Number: 4 Comment Originated: 03/22/2012 03/22/2012: Detention pond 3 is outfalling onto the property to the east. Outfalls need to be into established public drainage facilities unless a drainage easement is obtained from the property owner. Comment Number: 5 Comment Originated: 03/22/2012 03/22/2012: Some of the retaining walls are close to the property line. These walls, including the footers, need to be located on the property and be built without disturbing the adjoining properties, unless a temporary construction easement and/or a drainage easement is obtained. Comment Number: 6 Comment Originated: 03/22/2012 03/22/2012: The drainage swale that exists along the south side of Trilby Road deviates into the private property to the east. If flows are increased into this swale, a drainage easement would be required from the property owner. N Comment Number: 2 comment Originated: 03/15/2012 03/15/2012: Please provide a lighting plan in your next round of submittal. With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)(6) requires that "natural areas and natural features shall be protected from light spillage from off -site sources." Thus, lighting from the parking areas or other site amenities shall not spill over to the buffer areas. Comment Number: 3 Comment Originated: 03/15/2012 03/15/2012: In Section 3.4.1(E)(1)(g) of the Land Use Code, the City has the ability to determine if the existing landscaping within the buffer zone is incompatible with the purposes of the buffer zone. Please make sure your ECS reflects this performance standard. For example, the species selection in the buffer zone, such as the Scotch Pine and Austrian Pine, are not appropriate. In addition, there is little structural diversity proposed in this landscape plan, e.g., there are few shrubs to support the grass and tree layers. In addition, I found several seed mixes in the utility plans, but I need them on the landscape plans and more accurately labeled, e.g., GB2 on Sheet 3 of 6 in the Utility Plans references the "Prairie Grass" but I don't see that in this legend or on the landscape plan. Please clear this up. Also, please clarify that the seed mixes will be drill seeded or the rates may need to be adjusted. It would also be quite helpful if the units for seeding rates were the same (one is Ib11,000 sf and the other is PLS/LB/Acre). I am reviewing all of the proposed seed mixes to ensure the species and rates proposed are aligned with the performance standards set forth in 3.4.1(E)(1). I will also need the latin names of all of the plants proposed within this mix. Comment Number: 4 Comment Originated: 03/15/2012 03/15/2012: In addition, while the submittal documents suggest that all of the existing trees will remain on the site, some of the site grading is encroaching quite a bit into the tree canopy, potentially threatening the long-term viability of the existing trees. Can the City's tree protection standards be met with the current grading? Comment Number: 5 Comment Originated: 03/15/2012 03/15/2012: Regarding the plan's grading, while it does meet the 4:1 grading standard, is there an opportunity to make the grading less formal and more naturalistic in the buffer zone? There is actually a bit of room to grade this property in a way that both benefits wildlife and meets the site's needs. Extending the grading out further into the buffer zone may conflict with wildlife if the existing vegetation is largely high quality. Please have the ECS address this comment, as this would help the project to meet the performance standard outlined in Section 3.4.1(E)(1)(f) of the Code. Comment Number: 6 Comment Originated: 03/15/2012 03/15/2012: Please provide a calculation of the difference between the area required by the standard buffer (50' along both sides of the Louden Ditch) and what is being proposed by the development, Comment Number: 7 Comment Originated: 03/15/2012 03/15/2012: Please add the top of bank and buffer zone delineations to the landscape, plat, and construction plans. Please label this area as "Natural Habitat Buffer Zone" and add the following note to the site, landscape and utility plans: "Please see Section 3.4.1 of the Land Use Code for allowable uses within the Natural Habitat Buffer Zone." Comment Number: 8 Comment Originated: 03/15/2012 03/15/2012: Finally, from viewing the aerial imagery of this area, there may be prairie dogs present on the site. Please see the following sections of the Land Use Code for addressing this issue, if prairie dogs are found to be present: 3.4.1(E)(1)(d) 3.4.1(17)(3) 3.4.1(N)(6) VA Topic: Site Plan Comment Number: 19 Comment Originated: 03/21/2012 03/21/2012: Provide design and information for the sidewalk, curb and gutter along Trilby Road frontage on the site plan. Comment Number: 22 Comment Originated: 03/22/2012 03/22/2012: Provide additional detail regarding the design and construction method of the retaining walls. It appears that the construction of these walls will require temporary grading/ construction easement from adjacent property owners in order to be built. Due to the height of these walls additional requirements may requested from the building department. Comment Number: 23 Comment Originated: 03/22/2012 03/22/2012: The South College Avenue (US 287) access control plan designates a future recirculating access to be planned along the east property line of this property. The 217 West Trilby plans should accommodate for future access to this recirculating access from the parking lot in Lot 2 along with access easements to the east property line. Please shown on the site plan. Topic: Traffic Impact Study Comment Number: 2 Comment Originated: 03/21/2012 03/21/2012: Please provide a traffic impact study for review regarding trip generation, level of service and pedestrian requirements. If TIS has been waived then provide letter or correspondence confirming it has been waived. Comment Number: 3 Comment Originated: 03/21/2012 03/21/2012: The approved variance request dated 7-26-11 regarding the driveway access spacing has been reviewed and it has been confirmed that the proposed driveway spacing will be allowed as proposed in the variance request. Comment Number: 4 Comment Originated: 03/21/2012 03/21/2012: The South College Avenue (US 287) access control plan designates a future recirculating access to be planned along the east property line of this property. The 217 West Trilby plans should accommodate for future access to this recirculating access from the parking lot in Lot 2 along with access easements to the east property line. Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger&fcuov.com Topic: General Comment Number: 1 Comment Originated: 03/19/2012 03/19/2012: This site has a $276.50 credit toward the final plan submittal. The existing building square footage did not need to be included in the calculations since the use is remaining the same. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/15/2012 03/15/2012: Based on the revised extent of the proposed development, an Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of a known natural habitat (Louden Ditch). Please note the buffer zone standard of 50' for irrigation ditches defined as wildlife corridors, as outlined in Section 3.4.1(E) of the Land Use Code. As the applicant is proposing to average the buffer, please address how the performance standards set forth in 3.4.1(E)(1) are addressed by this proposal. Staff has a few suggestions for how to meet these performance standards below. M Comment Number: 13 Comment Originated: 03/21/2012 03/21/2012: Sheet 4 - Cover over the storm culverts along Trilby within the right of way will be reviewed during final review. Please consider the cover over these culverts with widening of Trilby and the addition of Sidewalk, curb and gutter. Comment Number: 14 Comment Originated: 03/21/2012 03/21/2012: Sheet 5 - It is recommended that wheel stops should be placed in the parking stalls located in the far southern parking area in lot 3. This will prevent vehicles from tracking into landscaping and detention area. Comment Number: 15 Comment Originated: 03/21/2012 03/21/2012: Sheet 6 - Revisit the vertical curve lengths for the "Preliminary West Trilby Road Ultimate Plan and Profile". 2 lane arterials are to be designed using design speed of 50 mph which will lengthen the proposed vertical curve lengths and could alter the transition between the two sag curves. Comment Number: 16 Comment Originated: 03/21/2012 03/21/2012: Sheet 6 - With the construction of the south half of Trilby road required with this project it is important to consider the existing and proposed centerline and flowline profiles and their impact to feasibility of construction for half of the road and the ability to transition cross slopes and tie to existing on the north side as well as the ultimate flowline along the north side of Trilby. Please consider this when preparing final plans as well as providing flow line profiles and cross sections. Comment Number: 18 Comment Originated: 03/21/2012 03/21/2012: Sheet 6 — It will be required during final to show the transition of the proposed flowline and curb and gutter to the existing edge of asphalt on Trilby at each end of the property. Topic: General Comment Number: 17 Comment Originated: 03/21/2012 03/21/2012: Sheet 6 — It will be required during final to show the transition of the proposed flowline and curb and gutter to the existing edge of asphalt on Trilby at each end of the property. Topic: Plat Comment Number: 6 Comment Originated: 03/21/2012 03/21/2012: Include the owner's signature block on the plat cover. Comment Number: 7 Comment Originated: 03/21/2012 03/21/2012: Storm water is being detained in the parking lot of lot 3 and in numerous other areas within all of the lots. Provide a drainage easement for the limits of the area proposed as detention. Comment Number: 20 Comment Originated: 03/22/2012 03/22/2012: Provide Louden Ditch signature block on the plat cover. Is the 35' Louden ditch easement shown an existing easement? If so, provide the "existing" in the label and provide reception number. Comment Number: 21 Comment Originated: 03/22/2012 03/22/2012: Please indicate the access easement to allow for future connection to the access control plan recirculating access. Topic: Reports -Soils, Subdrain Comment Number: 5 Comment Originated: 03/21/2012 03/21/2012: The titles of the soils reports do not match the lot descriptions referenced within the reports. Please revise. standard as set forth in Section 3.5.3(B)(2)(d)4, which states: "if larger or otherwise noncompliant front yard area is required by the City to continue an established drainage channel or access drive, or other easement". Because of the location of the existing Louden Ditch and the necessary driveway access into this portion of the property the build -to line standard cannot be met. However, a request for a modification of standard is necessary for the portion of the property on the east side of the Louden Ditch. The applicant must support the modification request by using the applicable criteria set forth in Section 2.8.2(H) of the LUC. This request must be included in the re -submittal packet for the PDP for a second round of review. Topic: Site Plan Comment Number: 8 Comment Originated: 03/22/2012 03/22/2012: The existing and proposed contours should be removed from the Site Plan to help clean the plan up and make it more legible. The contours must remain on the Landscape Plan, however. Also, utilities could be removed from the Site Plan only. Comment Number: 9 Comment Originated: 03/22/2012 03/22/2012: An access/emergency access easement for possible future access from Lot 2 to a recirculation road to the east, as identified in the South College Avenue Access Control Plan, must be provided. The easement would be on the subdivision plat and shown in dashed form on the Site Plan. Comment Number: 10 Comment Originated: 03/22/2012 03/22/2012: The information on the Site Plan regarding new buildings square footages is confusing and difficult to determine what is what. Comment Number: 21 Comment Originated: 03/23/2012 03/23/2012: The standard Planning Certificate signature block on the Site Plan has changed. Please see the example that is attached to the staff comment letter. Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich(Mcgov.com Topic: Construction Drawings Comment Number: 8 Comment Originated: 03/21/2012 03/21/2012: Sheet 1 Revisit the benchmarks indicated on the cover as well as the descriptions listed in note 40 of the cover sheet. Comment Number: 9 Comment Originated: 03121/2012 03/21/2012: Sheet 1 Update the title of the drainage and erosion control plan referenced in note 19 of the cover sheet. Comment Number: 10 Comment Originated: 03/21/2012 03/21/2012: Sheet 3 - Sidewalk, Curb and Gutter should be planned for, designed and constructed along the frontage of Trilby adjacent to the property. If offsite sidewalk connectivity is not required per the TIS then type 3 barricades will be required at the termination of each sidewalk. Comment Number: 11 Comment Originated: 03/21/2012 03/21/2012: Sheet 3 - Driveway cuts shall conform to the high volume driveway detail 707 which includes 24' driveway width for commercial and 20' curb return radii per 8.2.10 of LCUASS. Verify with Poudre Fire Authority that a radius larger than 20' is not required for access. Driveway must be concrete from the flowline of Trilby back to the right of way. Comment Number: 12 Comment Originated: 03/21/2012 03/21/2012: Sheet 3 - Provide additional detail regarding the design and construction method of the retaining walls. It appears that the construction of these walls will require temporary grading/ construction easement from adjacent property owners in order to be built. Due to the height of these walls additional requirements may requested from the building department. 4 Comment Number: b uomment Originated: 03/22/2012 03/22/2012: A copy of the standard letter from Building Services, Plan Review regarding a pre -submittal meeting and code requirements is attached to this staff comment letter. Comment Number: 6 Comment Originated: 03/22/2012 03/22/2012: Don Kapperman of Comcast Cable TV indicated that Comcast needs a 6' utility easement on Lot 3 on the east side of the new entry drive up to the building from West Trilby Road. Comment Number: 11 Comment Originated: 03/22/2012 03/22/2012: The Site & Landscape Plans do not show an existing or proposed sidewalk along West Trilby Road. Is not Engineering requiring sidewalk? Comment Number: 14 Comment Originated: 03/22/2012 03/22/2012: Please check with the City's Stormwater Utility for information contained within the Landscape Design Standards & Guidelines for Stormwater and Detention Facilities. Comment Number: 19 Comment Originated: 03/23/2012 03/23/2012: Another round of development review is necessary; therefore, the item cannot yet be scheduled for the required Planning & Zoning Board public hearing. A copy of a Revision Routing Sheet is attached to the staff comment letter that shows the documents to be revised, the necessary modification of standard request, and the number of each document to submit. Comment Number: 22 Comment Originated: 03/23/2012 03/23/2012: Please return all red -lined plans when the plan & document revisions are submitted for the second round of review. Topic: Landscape Plans Comment Number: 12 Comment Originated: 03/22/2012 03/22/2012: To satisfy Section 3.2.1(D)(2) of the Land Use Code two deciduous street trees must be provided along the West Trilby Road frontage of Lot 2. The location of these trees will depend on where a sidewalk is located. Comment Number: 13 Comment Originated: 03/22/2012 03/22/2012: To satisfy Sections 3.2.1(E)(4)(a) & (b) of the Land Use Code regarding Parking Lot Perimeter Landscaping there must be trees and shrubs along the west and south sides of the parking and drive areas on Lot 3. Comment Number: 15 Comment Originated: 03/23/2012 03/23/2012: The number of Narrow Leaf Cottonwood trees just exceeds the allowable percentage of any one species of tree, being 25% for 40 - 59 trees on the plan, as set forth in Section 3.2.1(D)(3) Minimum Species Diversity of the Land Use Code. Comment Number: 16 Comment Originated: 03/23/2012 03/23/2012: The word Perennial is misspelled (Perrinial) on Sheet 4 of 8 of the Landscape Plans. Also, the word Coniferous is misspelled (coniferos) in one place on Sheet 3 of 8 of the Landscape Plans. Comment Number: 17 Comment Originated: 03/23/2012 03/23/2012: Please see red -lined Sheet 4 of 8 of the Landscape Plans for a General Note to be added regarding installation of landscaping. Comment Number: 18 Comment Originated: 03/23/2012 03/23/2012: Any proposed phasing of the development plan must be shown on Sheet 3 of 8 of the Landscape Plans. This will help determine when installation or security of landscaping for each phase must occur. Topic: Modification of Standard Comment Number: 2 Comment Originated: 03/22/2012 03/22/2012: The development plan does not satisfy the requirements set forth in Section 3.5.3(B)(2) Orientation to Build -to Lines for Streetfront Buildings of the Land Use Code. The development on the west side of the Louden Ditch is supported by the exception to this 3 Comment Number: 4 Comment Originated: 03/20/2012 3.2.2(D)(1) Pedestrian Vehicle Separation - No separation is provided between pedestrians and vehicles. The site plan should show either a sidewalk from Trilby Road to each building or other clearly delineated pedestrian areas. Comment Number: 5 Comment Originated: 03/20/2012 3.5.1 (B) Since the architectural character is not well-defined in this area, the project needs to set an enhanced standard of quality for future projects. The project does not appear to meet this standard because the buildings have limited architectural detailing. Comment Number: 6 Comment Originated: 03/20/2012 03/20/2012: 3.5.1(H) The project needs to provide for a land use transition with the residential property to the west. Comment Number: 7 Comment Originated: 03/20/2012 3.5.3 (B)(1) The project does not comply with this standard. The buildings shall face and open directly onto a connecting walkway with pedestrian frontage. Comment Number: 8 Comment Originated: 03/20/2012 03/20/2012: 3.5.3(B)(2) Build -to lines shall be provided and buildings shall be located no more than 25 feet behind the street right-of-way. There are alternative ways to meet the standard (such as providing an outdoor space and connecting walkways) as defined in the Code. Comment Number: 9 Comment Originated: 03/20/2012 03/20/2012: 3.5.3(D)(3) The primary entrances need to be clearly defined and recessed or framed by a sheltering element such as an awning, arcade or portico. Comment Number: 10 Comment Originated: 03/20/2012 03/20/2012: 4.5(E)(2) Roof form — The buildings as proposed do not comply with the minimum roof pitch of 6:12 and the requirement for three roof planes. Department: Current Planning Contact: Steve Olt, 970-221-6341, Solt .fcgov.com Topic: Building Elevations Comment Number: 20 Comment Originated: 03/23/2012 03/23/2012: There are specific building and architectural design standards that the buildings in this development must satisfy. The standards are set forth in Section 3.5.3(D) Characterand Image of the Land Use Code. Topic: Easements Comment Number: 7 Comment Originated: 03/22/2012 03/22/2012: The Drainage, Utility & Access easement on Lots 1 & 2 must include Emergency Access for Poudre Fire Authority. Topic: General Comment Number: 1 Comment Originated: 03/20/2012 03/20/2012: Current Planning is still reviewing the submittal documentation. Some comments will be made at staff review Wednesday morning, March 21 st, with department comments available in the "final" first round of review staff comment letter to be made available to the applicant hopefully by the end of the day Friday, March 23rd. Comment Number: 3 Comment Originated: 03/22/2012 03/22/2012: Emma McArdle of Transfort has indicated that currently there are no bus routes on Trilby Road west of South College Avenue and none are anticipated. Comment Number: 4 Comment Originated: 03/22/2012 03/22/2012: A copy of the letter, with comments, received from Terry Farrill of the Fort Collins Loveland Water District and the South Fort Collins Sanitation District is attached to this staff comment letter. 2 City of Fort Collins � Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentreview March 23, 2012 Kenneth Merritt Landmark Engineering Ltd 3521 West Eisenhower Boulevard Loveland, CO 80537 RE: 217 West Trilby Road Subdivision, PDP#120006, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Steve Olt, at 970-221-6341 or solt@fcgov.com. Comment Summary: Department: Advance Planning Contact: Timothy Wilder, wildersfam(a-gmail.com Topic: General Comment Number: 1 Comment Originated: 03/20/2012 03/20/2012: 3.2.1(E)(1) Since the property to the west is residential, buffering needs to be provided on the west side of this property. The 5' rail fence and narrow landscape area appears to be insufficient to meet the buffering standards. The best way to meet this standard would be to provide a dense stand of trees and shrubs along the western property line. Comment Number: 2 Comment Originated: 03/20/2012 03/20/2012: 3.2.1(E)(4) & (5) The parking lot areas, particularly the lot sited along the south side of the property, do not appear to meet the parking lot perimeter and interior landscaping requirements. In particular, parking areas need to be screened with a fence or wall and plant material in the quantities described in the Code. Comment Number: 3 Comment Originated: 03/20/2012 Access circulator and multi -use path: The South College Avenue Access Control Plan (Figure 5-4 and Page 58, last bullet) and the South College Corridor Plan (Figure 29 and Policies T2.1 and T 3.4) show and describe an access circulator street on the east side of the property with a , future hard surface multi -use path connecting to the Shenandoah subdivision to the south. The access circulator is needed for access to Trilby Road for properties toAhe south as an alternative to access drives along College Avenue. Please work with Engineering and Transportation Planning to determine how the street connection and path can be provided as part of your project. Development of the street and the multi -use path would ensure compliance with 3.6.3 Street Pattern and Connectivity Standards and 3.2.2(C)(6) Direct On -Site Access to Pedestrian and Bicycle Destinations. 1