Loading...
HomeMy WebLinkAboutT-MOBILE WTF @ 3519 RICHMOND DR. - PDP - 3-11 - CORRESPONDENCE - (15)Number 14 A site/utility plan will be provided, as there is no site grading proposed. Number 15 There are no off -site easements or access agreements required from the property owner. Number 16 The entire site will be shown on the site and utility plan. Number 17 A design letter, provided by the pole fabricator, will verify the pole will topple within the proscribed radius. Light & Power Number 11, 12, 13 T-Mobile will coordinate with Light and Power relative to connecting to a power source, and is aware that electric charges will apply, and that a new electric meter will be required. Technical Services Number 19 Complete zoning drawings will be provided prior to issuance of mylars. Site Plan Number 18 Legal description will appear on drawings. Storm Water — Waste Water Number 20 The new location for the site is significantly away from the original location and will not need to address storm water intake into the catch basin. Zoning Number 1 A complete set of zoning drawings are provided. Number 2 The pole will be designed as stated above. If you have any questions, please let us know. Thank you. Sincerely, Ste a Warner Site Acquisition 303 601-3779 OTECS PO Box 2409 Parker, CO 80134 May 5, 2011 Courtney Rippy City of Fort Collins City Planner Community Development and Neighborhood Services 281 N College Avenue Fort Collins, CO 80522 Re: T-Mobile Telecommunications Facility — 3519 Richmond Drive Dear Courtney: On behalf of T-Mobile, please see comments in response to your letter dated 2-25-11. Planning - General Number: 3 The AT&T Telecommunications Facility located at 1017 W Horsetooth Road does not have enough height nor space available on the pole that will meet the coverage objective for T-Mobile customers. The contact is Western Accounts Manager AT&T Towers Jim Shearer, 303 643-3762. Number 7 Photo simulations showing the relocated site will be provided prior to the public hearing. Number 8 Color recommendation for the pole is called Passive, 7064 (attached), available from Sherwin Williams. Number 5 Landscape plans as shown. Number 6 A service light will be installed inside of the equipment enclosure to illuminate the equipment cabinets when opened for technical service. Number 4 The property owners are aware of Planning Staff recommendations to move the site and have no objection. Number 9 Battery Storage Systems code will be complied with. Engineering — General Number 10 An access easement is not required as the proposed new location is adjacent to Richmond Drive.