Loading...
HomeMy WebLinkAboutT-MOBILE WTF @ 3519 RICHMOND DR. - PDP - 3-11 - CORRESPONDENCE -City of Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com Number: 19 Issue Originated: 02/22/2011 [2/22/11] Is this only a 2 sheet set of plans? If not, we need to see all plans prior to mylars Topic: Site Plan Number: 18 Issue Originated: 02/22/2011 [2/22/11] Please add a legal description to the Site Plan. Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes(&-fcgov.com Topic: General Number: 2 Issue Originated: 02/04/2011 06/07/2011: The applicant's response letter states that the pole will be designed to collapse. A note to that effect needs to be added to the plan, probably on Sheet Z1. [2/4/11] The 60' tall pole requires that the pole be setback 60' from the lot lines. If its setback less than 60', then it needs to be designed to collapse rather than topple. Since there's no overall site plan, I don't know what the setback is. If it's less than 60', then we'll need plans or documentation explaining that it will collapse. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to contact me at 970-416-2283. Sincerely, Courtney Rippy City Planner 1 Staff Review Letter Generated: 6/14/20l 1 at 5:14 pm . City of Fort Collins Contact: Lindsay Ex, 970-224-6143, IexCaD-fcgov.com Topic: General Number: 1 06/13/2011: No comments. Department: Light And Power Contact: Alan Rutz, 970-224-6153, arutz(a)fcgov.com Topic: General Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Issue Originated: 06/13/2011 Number: 11 Issue Originated: 02/22/2011 [2/22/11] A new single phase transformer 120/240 volt will be installed for this project. Coordinate transformer location with Light and Power. Submit C-1 form with load requirements. Department: Light And Power Contact: Alan Rutz, 970-224-6153, arutzCcDfcgov.com Topic: General - Number: 12 Issue Originated: 02/22/2011 Electric development charges will apply. Number: 13 Issue Originated: 02/22/2011 Electric meter must be accessible by Light and Power. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue(aftgov-com Topic: General Number: 20 Issue Originated: 02/25/2011 [2/25/11] The site is over an area where drainage flows into an in -take curb & gutter. The design will need to accommodate these flows or have them rerouted. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com Topic: General 1 Staff Review Letter Generated: 6/14/2011 at 5:14 pm F6ft Community Development and Neighborhood Services 281 North College Avenue r Po Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com Topic: General Department: Engineering Development Review Contact: Andrew Carney, 970-221-6501, acarney()fcclov.com Topic: General Number: 10 Issue Originated: 02/22/2011 06/10/2011: It appears that on the new site plan several utility easement are shown along with a access easement. Will these be dedicated via seperate document or will they be a portion of the lease agreement with the property owner? If being dedicated to the City/Utility provider by seperate document, please contact me for information on the process of dedication and the information/fees associated with the process. [2/22/11 ] This facility will require some sort of access easement/agreement so that access to the facility is ensured. Is there an existing access easement for the existing parking lot? If not a access easement will need to be dedicated via separate document from the public street through the existing parking lot to the facility. If a easement is not desired, language included in the lease agreement that ensures access to the facility will also suffice. Number: 15 Issue Originated: 02/22/2011 06/10/2011: Comment carried forward as no letter of intent was recieved with this round of review. Again, the letter of intent will be required prior to any hearing. [2/22/11] A letter of intent will be required for any off -site easements or access agreements from the affected property owner. Number: 17 Issue Originated: 02/22/2011 06/10/2011: Comment carried forward as it appears that the pole is still within 60' of the ROW and no documention has been provided showing the structure will crumple rather than topple. [2/22/11] As noted in Comment #2, the setback of the pole must be equal to or larger than its height. Under no circumstance may a pole fall into public ROW. Please either move the pole so that it meets the setback criteria or demonstrate and document that the pole will crumple rather than topple. Department: Environmental Planning 1 Staff Review Letter Generated: 6/14/2011 at 5:14 pm Cfty of F6ft Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 V D R A F T Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com June 14, 2011 Steve Warner ATECS, LLC - T-Mobile 7901 E. Lowry Blvd. Denver, CO 80230 City staff and outside reviewing agencies have reviewed your submittal for T-Mobile Wireless Telecommunication Facility at 3519 Richmond Drive, and we offer the following comments: Department: Current Planning Contact: Courtney Rippy, 970-416-2283, crippy(a-_)fcgov.com Topic: General Number: 10 Issue Originated: 06/14/2011 06/14/2011: LUC 3.8.13(8) Color. All wireless telecommunication facilities and equiptment shall be painted to match as closely as possible the color and texture of the wall, building or surrounding built enviornment. Muted colors, earth tones and subdued colors shall be used. - The color selected, "passive", does not match the adjacent medical building. Please resubmit a color chip selecting a tan color. Topic: Landscape Plans Number: 5 Issue Originated: 02/10/2011 06/13/2011: Per Fort Collins Land Use Code Section 3.2.1(E)(3)(b), landscape plans detailing clear identification of all applicable hydrozones using the following categories: High Hydrozone: 18 gallons/s.f./season Moderate Hydrozone: 10 gallons/s.f./season Low Hydrozone: 3 gallons/s.f./season Very Low Hydrozone: 0 gallons/s.f./season [2/10/11] Provide separate landscape plans detailing existing and proposed landscaping improvements. With proposed improvements, documentation of proposed species is needed. Please reference Fort Collins Approved Plan List (LUC Section 3.8.13(C)(4)). Department: Engineering Development Review Contact: Andrew Carney, 970-221-6501, acarney(cDfcgov.com Staff Review Letter Generated: 6/14/2011 at 5:14 pm ,