Number: 19 Issue Originated: 02/22/2011
[2/22/11] Is this only a 2 sheet set of plans? If not, we need to see all plans prior to mylars
Topic: Site Plan
Number: 18 Issue Originated: 02/22/2011
[2/22/11] Please add a legal description to the Site Plan.
Department: Zoning
Contact: Peter Barnes, 970-416-2355, pbarnes(&-fcgov.com
Topic: General
Number: 2 Issue Originated: 02/04/2011
06/07/2011: The applicant's response letter states that the pole will be designed to
collapse. A note to that effect needs to be added to the plan, probably on Sheet Z1.
[2/4/11] The 60' tall pole requires that the pole be setback 60' from the lot lines. If its
setback less than 60', then it needs to be designed to collapse rather than topple. Since
there's no overall site plan, I don't know what the setback is. If it's less than 60', then we'll
need plans or documentation explaining that it will collapse.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project, please
feel free to contact me at 970-416-2283.
Sincerely,
Courtney Rippy
City Planner
1
Staff Review Letter Generated: 6/14/20l 1 at 5:14 pm .
City of
Fort Collins
Contact: Lindsay Ex, 970-224-6143, IexCaD-fcgov.com
Topic: General
Number: 1
06/13/2011: No comments.
Department: Light And Power
Contact: Alan Rutz, 970-224-6153, arutz(a)fcgov.com
Topic: General
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
Issue Originated: 06/13/2011
Number: 11 Issue Originated: 02/22/2011
[2/22/11] A new single phase transformer 120/240 volt will be installed for this project.
Coordinate transformer location with Light and Power. Submit C-1 form with load
requirements.
Department: Light And Power
Contact: Alan Rutz, 970-224-6153, arutzCcDfcgov.com
Topic: General -
Number: 12 Issue Originated: 02/22/2011
Electric development charges will apply.
Number: 13 Issue Originated: 02/22/2011
Electric meter must be accessible by Light and Power.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(aftgov-com
Topic: General
Number: 20 Issue Originated: 02/25/2011
[2/25/11] The site is over an area where drainage flows into an in -take curb & gutter. The
design will need to accommodate these flows or have them rerouted.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com
Topic: General
1
Staff Review Letter Generated: 6/14/2011 at 5:14 pm
F6ft
Community Development and
Neighborhood Services
281 North College Avenue
r Po Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com
Topic: General
Department: Engineering Development Review
Contact: Andrew Carney, 970-221-6501, acarney()fcclov.com
Topic: General
Number: 10 Issue Originated: 02/22/2011
06/10/2011: It appears that on the new site plan several utility easement are shown along
with a access easement. Will these be dedicated via seperate document or will they be a
portion of the lease agreement with the property owner? If being dedicated to the City/Utility
provider by seperate document, please contact me for information on the process of
dedication and the information/fees associated with the process.
[2/22/11 ] This facility will require some sort of access easement/agreement so that
access to the facility is ensured. Is there an existing access easement for the existing
parking lot? If not a access easement will need to be dedicated via separate document
from the public street through the existing parking lot to the facility. If a easement is not
desired, language included in the lease agreement that ensures access to the facility will
also suffice.
Number: 15 Issue Originated: 02/22/2011
06/10/2011: Comment carried forward as no letter of intent was recieved with this round
of review. Again, the letter of intent will be required prior to any hearing.
[2/22/11] A letter of intent will be required for any off -site easements or access
agreements from the affected property owner.
Number: 17 Issue Originated: 02/22/2011
06/10/2011: Comment carried forward as it appears that the pole is still within 60' of the
ROW and no documention has been provided showing the structure will crumple rather
than topple.
[2/22/11] As noted in Comment #2, the setback of the pole must be equal to or larger than
its height. Under no circumstance may a pole fall into public ROW. Please either move the
pole so that it meets the setback criteria or demonstrate and document that the pole will
crumple rather than topple.
Department: Environmental Planning
1
Staff Review Letter Generated: 6/14/2011 at 5:14 pm
Cfty of
F6ft Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
V D R A F T Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
June 14, 2011
Steve Warner
ATECS, LLC - T-Mobile
7901 E. Lowry Blvd.
Denver, CO 80230
City staff and outside reviewing agencies have reviewed your submittal for T-Mobile Wireless
Telecommunication Facility at 3519 Richmond Drive, and we offer the following comments:
Department: Current Planning
Contact: Courtney Rippy, 970-416-2283, crippy(a-_)fcgov.com
Topic: General
Number: 10 Issue Originated: 06/14/2011
06/14/2011: LUC 3.8.13(8) Color. All wireless telecommunication facilities and equiptment
shall be painted to match as closely as possible the color and texture of the wall, building
or surrounding built enviornment. Muted colors, earth tones and subdued colors shall be
used.
- The color selected, "passive", does not match the adjacent medical building. Please
resubmit a color chip selecting a tan color.
Topic: Landscape Plans
Number: 5 Issue Originated: 02/10/2011
06/13/2011: Per Fort Collins Land Use Code Section 3.2.1(E)(3)(b), landscape plans
detailing clear identification of all applicable hydrozones using the following categories:
High Hydrozone: 18 gallons/s.f./season
Moderate Hydrozone: 10 gallons/s.f./season
Low Hydrozone: 3 gallons/s.f./season
Very Low Hydrozone: 0 gallons/s.f./season
[2/10/11] Provide separate landscape plans detailing existing and proposed landscaping
improvements. With proposed improvements, documentation of proposed species is
needed. Please reference Fort Collins Approved Plan List (LUC Section 3.8.13(C)(4)).
Department: Engineering Development Review
Contact: Andrew Carney, 970-221-6501, acarney(cDfcgov.com
Staff Review Letter Generated: 6/14/2011 at 5:14 pm ,