Loading...
HomeMy WebLinkAboutWATERGLEN SELF-STORAGE - REPLAT TRACT ''W'' - 71-93D - CORRESPONDENCE - (6)Nov-20-02 O2:44P P.O8 rrt; 579 II 31/64 36' (�O t' I 1 6' Q, J T 3.St 3R' POU ROOF: PANEL U WALI PANEL Onve"ad PRU Hoof Panoq .... , . .- . -.. �tr .- 1 LI-PanCI N ))) M am..1 •4 4 6 aes In Inlhea pBU-Poncl 1) M 41Z. I.,.. u.125 •Vn , 5. Vo1K lib 101clanle ♦/- I/.17 inch ,. �oYKage IOM1Mt! .,n to entl i/- I/IC inch/ r A.00 I _ 1'•.L• 9wh•a Eaa.. Ore Sae Onry FIGURE 1 Zoning: 1. Refer to attached plan for added fence detail. We attached and noted the color of this perimeter fence. This fence color will match the body of the self storage units. 2. Dimensions from the building to property line have been added to sheet MA-1 as requested. Engineering: 1. Here attached to our revised package is the re -plat of all of tract W as required. This submittal has been completed by JR Engineering for your review and approval. Stormwater: 1. As per attached civil re -plating plans, the drainage easement has been vacated. Refer to the grading plan within the set provided. Thank you again. Please forward any comments to me directly at 303.746.7013 with any questions. Sincerely; Ao BarryySherman Vice President of Design dcb construction co. inc. cc: John Barna Ken Crumb / L Darren Zet ren Project Manager dcb construction co. inc construction professionals since 1964 2. The horizontal metal siding on the storage units provides numerous items that relate directly to the residential units. The metal siding provided on the self storage units resembles the lapped masonite on each of the residences in the proximity of this site. We have attached a profile of the metal siding for your review. Again, this profile emulates very closely the profile of the masonite siding. The centerline distance from Rib to Rib is 6" in length. The residential homes have ribbed masonite siding in either 8" or 4" lengths. Our color pallet has been attached for use. We have identified the body color of the units and the accent and trim colors as well. These colors are predominant in the residential area. We would also like to point out that the paint color will be a flat finish and very durable over time. *** In regards to adding of masonry to the eastern side of the office structure (bldg 1), we have attached photos of the site for your review. Each of these homes, along 1-25 adjacent to our site, does not have any brick masonry along this side. We would request approval to keep our plans as designed. **** Refer to the landscape plan for the revised landscaping along the residential southern side. Additional landscaping has been revised to best meet this requirement. 3. The pavement of this facility, as recommended by our Geo- technical Engineers, is Asphalt. 4. Refer to revised attached plans for enhanced landscaping along the open fenced areas. These areas are very thick in landscaping. We have attached a cut sheet and general information on this plant material. 5. In previous discussions. regarding the existing landscaping along Waterglen Drive and adjacent to the eastern property line, It was determined that the initial landscape construction of this lot met the approved PUD. All materials in this area outside of the building lines will remain as approved on this prior PUD. We have thoroughly surveyed the site and confirmed this is accurate. construction professionals since 1964 C construction company, inc. 909 EAST SIXTY-SECOND AVENUE • DENVER, COLORADO 80216 • (303) 287-5525 RECEIVED November 21, 2002 Nov 2 2, 2002 CURRENT PLANNING Steve Olt, City Planner City of Fort Collins Planning Department 281 North College Avenue Fort Collins, CO. 80524 Re: Waterglen Self Storage Fort Collins, CO. Dear Steve: dcb construction co. and Vista Ventures would like to extend our appreciation to you and your staff on providing us a very quick and concise response to our initial submittal of Waterglen Self Storage. We have thoroughly reviewed the comments that were faxed to us and offer the following response to each item. We have listed each of our response items below as they were presented. This second submittal also includes the re -platting package from JR Engineering. Our intentions are to submit construction plans to the building department prior to Thanksgiving. Upon receipt of this package, please free to contact me directly with any questions or concerns. It appears that our upfront meetings with yourself provided us the direction to address the existing PUD correctly. We are including product data, site photo's, and landscaping backup to further assist in our re -submittal. Current Planning -General Issues: 1. Please refer to attached plans for added fence detail. This is the fence detail that was discussed earlier with you for your approval. construction professionals since 1964