4128 The plans were revised.
Stormwater Utility - Utility Plans -
#131 The plans were revised.
Stormwater Utility — Water Quality"
#130 Review of UDSWM requirements in addition to the required water quality volume versus
that cited as provided indicates that Pond 2 has sufficient water quality capacity up to the 0.5 feet
below the limiting top of spillway elevation. As such,it is proposed that on -site runoff be routed
directly to Pond 2 which will provide water quality without adverse impact to total tributary .
areas. -
Transporation Planning
#70 We -have. meet with David and have agreed upon the crosswalk location and have adjusted
the storm drain accordingly.
I appreciate your time in reviewing these plans. If you,have' any further questions; lease feel
Cc George Hart, PLS Homes.
Jim Loonan, Loonan and Associates
Steve Lund, King Surveying
Ridgewood Hills. Tracts T & N
Response #3 to city commenjs, � A05
i v i 'c C r' Village
144 North Mason Street Smite.2 • Fort Collins, Colprado 80524
(970)'472-9125 Fax:(970) 494-0728
k'
4
L a n d s c a p e' A r c h it e c t u r e
S i t e P l a n n i n g ,
G r a p h i c s
a
Light and Power
#9.8 Completed
#99 A utility meeting has occurred and the utilities for the "additional units are shown on the
utility drawings'.
# 100 Noted
Stormwater Utility ;
#132 In reviewing the results of the UDDWM analysis with respect to estimated detention and
water quality requirements versus that indicated as provided it is determined that the combined
volumes, do not exceed that as governed by the 0.5. foot below spillway elevation cited on plans
as made available.
Please refer to the updated USDWM model schematic. which indicates subject tributary areas.
Based on the 100-year WSEL of 5066.54 feet as provided in plans made available, and via
utilization of UD-Neo Sewer (UDFCD storm sewer modeling platform) it is determined that
while rise in hydraulic grade line,may occur within the subject storm line system, the pipe is
capable of handling the design flow without appreciable impact over previous modeled
conditions to the subject property, and no anticipated impact to off -site areas. Site specific
grading (not available at the time of analysis) will mitigate local runoff for the Site, and will be'
developed under Loonali & Associates. Efforts are encouraged towards implementing an.
efficient approach section into the inlet section of the subject pipe.
While the grading plan will be developed by Loonan & Associates, it is understood that such
design effort is planned under this Project. As such, no adverse impacts are expected under such
plan.
#102 UD-Neo-Sewer analysis indicates adequate capacity of the subject storm sewer.
Stormwater Utility - Erosion and Sediment Control
#101 Most of the Erosion Control comments will be addressed with the final drainage study and
final compliance drawings. 1
S'tormwater Utility - Grading,
4129 The'site was field surveyed and the existing contours that are shown with in the boundary
reflects the field survey. Additional inlets were added to the swale to'reduce the flows.
Stormwater Utility - Plat
# 127 The plat. has been corrected to vacate the. drainage easement where it conflicted with lots
42-45:
Ridgewood Hills Tracts T & N
Response #3 to city comments, i v i e c J 1J405 r v i l l a g e 3
144 North.Mason Street Suite 2 • Fort Collins, Colorado 80524
(970) 472-9125 • Fax:(970) 494-0728 `
L a n d s c a, p e A r c h= i t e c t u r e
S i t e P l a n n i n g
G r a p h i. c s
#105 The easements to be vacated have been clarified, with no structures located on -easements.
All- new easements are shown on-the'plat.
# 107 The grading easement was labeled on all sheets.
'#124 Private access is intended to be limited to residents and guests of Tracts T & N, as well as
emergency and utility provider access. These areas will be maintained by the Homeowners,
association for tracts T & N.
Engineering — General
#104 All plans have been updated -to show the correct crosswalks and ramps.
#110 We have coordinated this crosswalk with Transportation and have adjusted the location of
the storm inlet.,
# 111,Completed
# 112 The variance request has been revised as requested and resubmitted with this submittal.
#113 All utility crossings shall. be shown on the final compliance plans.
#114 Completed.
4115 Completed.
#116 Completed.
#117 all widths and sidewalk -parking, etc. have been labeled. on the utility plans.
# 118 This will be addressed affinal compliance.
#119 This will be addressed at final. compliance.
#121 A utility meeting has occurred and the utilities for the additional, units are shown on the ,
utility drawings.
# 122 Scana6ility will continue to be addressed with this resubmittal and final compliance.
#123 This will be addressed at final compliance.
Engineering — Plat .
#106 Completed, the note has-been removed.
-Ridgewood Hills Tracts T & N
Response #3-to city comments, o C.11�8405 r v i•3 1 a g e• 2
144 North Mason Street Suite 2 • Fort Collins, Colorado 80524
(9703 472-9125 • Fa :(970) 494-0728
L a n d s c a p e- A•r c h i t e c t u r e
r
S,i t o P l a n n i n g - l
G r a p h i c s _
November 9, 2005
Steve Olt, Project Planner
Current Planning Division
City of Fort Collins
281 N. College Avenue
Fort Collins, CO 80524
Dear Steve,
' Attached are revisions to the preliminary development plans for RIDGEWOOD HILLS, 4TH
FILING, TRACTS N & T. PLOP - #55-84N: They have been revised in response to City staff,
and agency review comments. The comments made and revisions requested have been addressed
as follows:
Current Planning
#136The easement requested by Comcast Cable TV 'has been added.
# 133 Acknowledged and addressed per this resubmittal.
# 134 The utility easements and building envelopes have been labeled clearly .
#135 The bedroom count has been added.
#137 We have met with -Terry Ferrill and have responded to their comments. Specifically, the
water services were changed to 1 service per building, and all drives widened to 24,feet in width
' . with a 20-30 foot utility easement.
Engineering: Technical Services
# 125 The street name has been added to the plat.
# 109 We will work with technical services prior to submittal of the final_ compliance plans on the
addressing issue.
Engineering — Crosspans
# 108 The cross -pans were revised.
#I09,The full depth asphalt wedge detail'was added, however, the spot elevations for the cross -
pans will be added with the final drawings..
Engineering — Easements.
Ridgewood Hills Tracts T &•N
Response #3 to -city commenxsc 1840� 1
iv ic C r .V illage•
144 North Mason, Street Suite 2 • Fort Collins, Colorado 50524 '
(970) 472-9125 • F ax:(970) 494-0725 ,