HomeMy WebLinkAboutFAIRVIEW SHOPPING CENTER FILING FOUR (1409 W. ELIZABETH MULTI-FAMILY) - PDP - PDP120009 - CORRESPONDENCE - (3)Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuf5ngtonlf*fifcgov.com Topic: Construction Drawings Comment Number: 3 Comment Originated. 04/03/2012 04/03/2012: Is there a conflict between the sidewalk and the fire hydrant? The revised sidewalk design allows the existing fire hydrant to remain in its current location. Comment Number: 4 Comment Originated: 04/03/2012 04/0312012: See redlined plans for other comments. See revised Utility Plans (to submitted during Final Plan phase) for corrections. Topic: Landscape Plans Comment Number: 1 Comment Originated: 04/03/2012 04/0312012: Show water and sewer lines on the landscape plan and adjust landscaping to provide required separation distances. Include the sewer near the south property line. 'Nater and sewer lines have been added to landscape plan. Department: Zoning Contact: Noah Beals, 970.416.2313, nbeals(t1jfcgov.com Topic: General Comment Number: 1 Comment Originated: 03/20/2012 03/20/2012: With 6 studio, 6 one bedroom, 6 two bedroom, and 9 three bedroom units this project is required 47 off street parking spaces. There are 41 spaces on the site, then six addifional spaces are required. This means that six of the the spaces on the lot to the east need to be signed for residential use only. The location of these signs should be identified on the site plan. A sign has been called out on the south side of the existing Wendy's restaurant. This will be reserved parking for the multi -family building to meet to required parking count. Comment Number: 2 Comment Originated: 03/20/2012 03/2012012: The trash enclosure is not meeting the standards in the Land Use Code section 3.2 5. This section requires a walk-in access without having to open the main service gate. Also it is unclear if the enclosure is built on a cement concrete pad, site plan needs to indicate this. The trash enclosure detail has been revised. Please see LS501 Comment Number: 3 Comment Originated: 03/20/2012 03/20/2012: The elevation and site plan lack any locations of the necessary mechanical/utility equipment. Please indicate these items on both elevations and site plan and notes of how All mechanical equipment is on the roof and screened by parapets. The electric and gas they are to be screened and/or palntedmeters stacks will be painted to match the adjacent building material where applicable and will be shown on the Final Plan subm' di Comment Number: 5 mment Originated: 03/20/2012 0312012012: Site Plan should be cleaned up, remove the exisfing conditions of the subject property. Acknowledge,. Department: Technical Services Contact: Jeff County, 970-221-6588, Icountypfcgov com Topic: Plat Comment Number: 6 03/29/2012. There is a minor line over text issue. See revised Plat for corrections. Comment Number: 7 Comment Originated: 03/29/2012 Comment Originated: 03/29/2012 03/2912012: Please reference how West Elizabeth Street was dedicated. See revised Plat. Comment Number: 8 Comment Originated: 03/29/2012 03129/2012: Please provide monument records for all public land comers shown on the Plat. Copies of the requested monument records have been provided electronically. Comment Number: 9 Comment Originated: 03/29/2012 03/2912012: See redlines regarding the Basis Of Bearings statement. See revised Plat for corrections Comment Number: 10 Comment Originated: 03/2912012 0312912012: Please add a scale to the scale bar See revised Plat. Topic: Site Plan Comment Number: 11 Comment Originated: 03/2912012 03/29/2012: Please provide a legend on the Topographic Survey sheet. Comment Number: 12 Comment Originated: 03/29/2012 03/29/2012: There are line over text issues on the Topographic Survey sheet 8 sheet LS101 Line over text issues on LS101 have been revised Department: Transportation Planning Contact: Emma McArdle, 970.221.6197, emcardle(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 03/29/2012 03/2912012: For your information this corridor was identified as an enhanced travel corridor in the City's Transportation Master Plan. It is anticipated that someday the Elizabeth comdor will provide a strong transit connection between the Mason Bus Rapid Transit Enhanced Travel Corridor, CSU, the Campus West area and the CSU Research Campus. Special transit routing could be offered to Hughes Stadium for special events Acknowledged Comment Number: 2 Comment Originated: 0312912012 03/29/2012. A bus stop is currently located near this site east of the intersection of West Elizabeth Street and City Park Avenue. No bus stop improvements shall be required of this proposal at this time. Scknowledged Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbufftngton(a)fcgov.com Topic: Construction Drawings Comment Number: 2 Comment Originated: 04/03/2012 04/0312012: Add note to coordinate with Water Utilities (970416-2165) on the abandonment of the 1' water service. See revised Utility Plans (to be submitted during Final Plan phase) for the requested note Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarquelcDfcgov.com Topic: General Comment Number: 1 Comment Originated. 04/04/2012 0410412012: Stormwater is ready for a hearing. Comments may apply during final compliance Acr_nnwiedged Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com Topic: Building Elevations Comment Number: 14 03/29/2012: No comments. Topic: Construction Drawings Comment Number: 17 Comment Originated: 03/29/2012 Comment Originated 03/29/2012 03129/2012: Please add descriptions to the benchmarkson sheet CO.0. See revised Utility Plans (to be submitted during Final Plan phase) for corrections. Comment Number: 18 Comment Originated: 03/29/2012 03129/2012: The bearing in the Basis Of Bearings statement on sheet CO doesn't match the Subdivision Plat. See revised Utility Plans (to be submitted during Final Plan phase) for corrections. Comment Number: 19 Comment Originated 03/29/2012 03129/2012: There are line over text & text over text issues on sheets C 1.0, C4.0 & C4.1. See revised Utddy Plans (tu be submitted during Final Plan phase) for corrections. Topic: Landscape Plans Comment Number: 13 Comment Originated: 03/29/2012 03129/2012: Sheet G001 is incorrectly labelled as a site plan. Sheet GOO has been revised. Topic: Lighting Plan Comment Number: 15 Comment Originated: 03/29/2012 03/2912012: There are line over text issues on sheet EO 1 Sheet E0.1 has been revisec. Comment Number: 16 Comment Originated: 03/29/2012 03129/2012: Please add a north arrow to sheet E01 Sheet E0.1 has been revised. Topic: Plat Comment Number: 1 Comment Originated: 03/29/2012 0312912012: The Subdivision Plat boundary doses. Acknowledged Comment Number: 2 Comment Originated: 03/29/2012 03/29/2012: Please increase the size of the text in the vicinity map. See revised Plat for corrections. Comment Number: 3 Comment Originated: 03/29/2012 03/2912012: Please rearrange the "line" labels along Elizabeth Street. See revised Plal for corrections. Comment Number: 4 Comment Originated: 03/29/2012 03/2912012: Please see the note regarding establishing the boundary. See revised Plat for corrections. Comment Number: 5 Comment Originated. 03129/2012 03/2912012: Please correct the surveyors name at the center of section 15 See revised Plat for corrections. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine(�fcoov.com Topic: General Comment Number: 1 Comment Originated: 03/20/2012 03/20/2012, The "Private access and shared parking easement" on the south side of the site will also need to be a utility easement. See revised Plat. Comment Number: 2 Comment Originated: 03/2012012 03/2012012: The builder will need to complete an electric commercial service (C-1) form, and coordinate power locations and requirements with Light & Power Engineering (221-6700). Will also need a 1-line diagram of the electric service. Electric utility charges as well as electric sritem modification charges will apply. cknowled edn the project for building unit. Comment Numar: 3 8omment Originated: 33120/2012 03/2012012: Relocation of the power line serving the Wendy's transformer will require Light 8 Power to trench through the asphalt of a portion of the Wendy's site. Asphalt repairs will be the responsibility of the developer. Relocation of this power line will need to be completed prior to start of construction of the new building. Ackno led ed Comment Alum%er. 4 Comment Originated: 03/20/2012 03/20/2012: Each dwelling must be individually metered, and the meters must be outdoors, accessable to utility personnel 24-7. The electric meters (owner provided) will need to be 5 terminal type with the 5th terminal in the 9 O'clock position. Acknowledged. This will be provided along with the proposed building's construction documents. Department: Outside Agencies Contact: Don Kappernan, , Topic: General Comment Number: 1 03/30/2012 Comcast is currently located on the west side of the building Department: Park Planning Contact: Craig Foreman, 970-221-6618, cforemanofcgov_com Topic: General Comment Number: 1 03/16/2012 No comments Department: PFA Contact: Ron Gonzales, 970-221-6635, rgonzales(�poudre-ftre.oro Topic: General Comment Number: 1. Comment Originated: 03/30/2012 Comment Originated: 03116/2012 Comment Originated: 03/27/2012 03127/2012: A communication evaluation is required for this 3-story edifice to validate fire department communications. If not, a bi-directional antenna is required to enhance PFA communications within and out of the building. Acknowledged. Department: Stormwater Engineering Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchananofcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 04/03/2012 04/03/2012. The following Forestry comments are offered A preliminary walk occurred with the City Forester to review existing trees and impact from the proposed construction. 1. Provide in the next submittal a table listing all of the existing significant trees. Each significant tree should be numbered and include information on species, size, condition, and intent to either remove, transplant or protect. Also provide in the table the number of mitigation trees required for any significant tree proposed to be removed and for trees to be protected. Required mitigation trees should be upsized based on tree type Shade Tree 3 inch caliper Ornamental Tree 2.5 inch caliper Evergreen Tree 8 feet height A table has been added to LP101 outlining existing trees and mitigation requirements. In addition all mitigation trees will follow land use code requirements. 2. Please provide a statement of why existing significant trees would need to be removed on the current proposed plan. Existing significant trees need to be retained to the extent reasonably feasible. Where it is not feasible to protect and retain then they need to be replaced with upsized mitigation trees. Because of the proposed building footprint, minimum density requirements for project feasibility, and existing site constraints and conditions some of the existing significant trees will require removal and mitigation. All mitigation trees will follow land use code requirements. 3. Required mitigation trees should be kept on site if possible and can be used to meet landscape requirements. Offsite mitigation needs to occur within one quarter mile. All mitigation trees will he kept on site. 4. The proposed sidewalk running north and south on the west side of the east honeylocust in front of the building appears to be only a few feet from the trunk of the tree. Pursue a design for vthe walk that minimizes excavation into the root system, and or shifts the walk to the west further away from the tree. The sidewalk west of the Honeylocust on the north side of the building has been revised to angle northwest away from the existing tree as much as possible. Department: Internal Services Contact: Lisa Schoenfeld, , Ischoenfeldidfcaov.com Topic: General Comment Number: 1 Comment Originated: 03/30/2012 03/3012012: Adopted by City Council last March, the new City of Fort Collins green building codes went into effective January 1. 2012. These can be found at. http./iwww.fcgov.conVbuilding/codes.php. Please call Lisa Schoenfeld at 416-2640 with any Vquestions. The developer and the project architect have already had a pre -submittal meeting with Russ Hovland on 519/12 to discuss the Green Codes and 2009 IBC requirements. Department: Light And Power Contact: Doug Martine, 970-224-6152. dmartine(a),fcgov com Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirataiciffcgov.com Topic: Plat Comment Number: 4 Comment Originated 04/04/2012 04/04/2012. Just curious as to why the subdivision plat creates lot lines that results in equal lot sizes but do not correspond to any "as -built" condition? The site, landscape and construction plans show this line but does not label it, while also showing a more prominent (thicker and dashed) line without indicating what this line is intended to represent (a "PDP" boundary?) There needs to be coordination/venliication on the intent of the lines shown on the drewirt�s. The rcit line corresponds to a previous property split, and matches current County parcels and a dressing Comment Number. 5 Comment Originated: 04/04/2012 04/0412012: The private access and shared parking easement indicated on the plat would need to be recorded prior to the recordation of the plat. , ,'knnwledyled Contact: Sheri Langenberger, 970-221-6573, slangenberger0fcgov.com Topic: Fees Comment Number: 1 Comment Originated: 03/20/2012 03120/2012: The Transportation Development Review Fee for the PDP that was paid was not enough. PDP total should be $5,653.08 Amount paid was $5,505. $148.08 additional is owed for PDP. The acreage amount on form was less than and did not match the size of the parcel on the plat. im C,,.•h,oer has already paid for the remaining balance of the Transportation Development Review Fee on 5/18/12. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lexafegoil Topic: General Comment Number: 1 Comment Originated: 04/03/2012 04/03/2012: Environmental Planning has no issues with these plans. Kudos to the landscape architects for their plant selections and emphasis on native species. Acknowledged. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchananofcgov.com Topic: Landscape Plans Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mviratad),,fcgov.com Topic: General Comment Number: 3 Comment Originated: 04/04/2012 04/04/2012 The proposal of an 8 foot attached sidewalk is of question. The City's view is that (per the Conceptual Review comments) an attached sidewalk matching the Campus West Redevelopment is the ideal specification for an attached sidewalk. This sidewalk dimension for the Campus West Redevelopment is 12 feet and ideally this proposal should match this width (and is also the proposed width of the redevelopment property next door). The site visit with Northern and Brinkman identified some potential restriction points to meeting the ideal width: the tree in front of the Wendy's and a light pole along with a fire hydrant. We were realizing that the tree in front of Wendy's would likely need to narrow from an ideal width in order to not impact the tree but thought that the 12 foot width could be likely achieved along the rest of the corridor The light pole and fire hydrant, while being existing restncbon points, we did not necessarily conclude that these appurtenances could stay as is. With the drawing submitted it shows that with the 8 fool attached sidewalk, the light pole would be fully in the sidewalk and the fire hydrant is partially in the sidewalk as well. The City would conclude that these appurtenances should be moved as they're awkwardly situated in the 8 foot attached sidewalk, which would have the design then look towards more of the ideal sidewalk width. (Doug Martine with Light and Power noted that the cost to move the pole so irs not within/abutting the sidewalk is no different to achieve 2 foot separation from the proposed 8 foot sidewalk to vs. a more ideal sidewalk width with further separation.) We would need to evaluate any proposal that does not incorporate the 12' attached sidewalk through a variance request in coordination with Planning. See response to Current Planning Site Plan Comment Number: 3, above. Sidewalk on north side of properly has been revised to reflect changes that were discussed with City staff. Comment Number: 6 Comment Originated: 04/04/2012 04/04/2012: The proposed 9 feet of additional right-of-way wouldn't be needed in its entirety. The amount of right-of-way needed would only need to coincide with the back of sidewalk ultimately decided to and agreed upon to be built per ID#3 (with the exception that Light and Power and Water/Wastewater would need additional easement or right-of-way for relocated appurtenances). Adhering to the 9 feet of additional right-of-way would appear to be problematic in that part of the Werdy's patio would fall within this additional right-of-way. Seer ed tat S of additional right-of-way is being dedicated to coincide with the new ba or wal Commerr� umger: i� (omman��ngma�ed: 04/0412012 04/0412012: Both drive approaches would need to have additional concrete added in order for the sidewalk to lead to a concrete section, not partial concrete/asphalt. The access ramp leading to a curb for the eastern exit driveway is awkward as well with the curb needing to be pulled back. Concrete has been added at both drive locations, each extending to the back of the pedestrian crossing Comment Number: 10 Comment Originted: 04/04/2012 04/04/2012 Topic: Plat Comment Number: 2 Comment Originated: 04/0412012 04/0412012: The plat language has been updated. Please provide the more updated certificate of dedication, repair and maintenance language See revised Plat for corrected language. Department: Current Planning Contact: Courtney Levingston, 970416.2283, cievingston(rDfcgov.com Topic: Site Plan Comment Number: 1 Comment Originated: 04/03/2012 0410312012: Per LUC 3.2.2 (C)(2), please include a bike parking detail on the plans. Additionally, please indicate the number of bike parking spaces that are being provided in your site data table. Bike rack detail has been added to LS501. Bike parking count has been added to LS101. Comment Number: 2 Comment Originated: 04/03/2012 04/03/2012: Please put a note on the site plan regarding shared parking arrangement_ Shared parking arrangement note has been added to LS101. Comment Number: 3 Comment Originated: 04/03/2012 04/03/2012: The development at 1401 W. Elizabeth is currently in the development review process and proposing a 12' sidewalk. As proposed, the firehydrant is abutting the sidewalk and needs to be 2' from the walk and the existing metal light pole in located within the sidewalk. Both the hydrant and the lightpole should be moved back and the sidewalk width increased. While the full 12' walk may not be an option, we are suggesting that 10' may be Jmore appropriate in this case. A variance request is still required for a 10' walk. See revised Site Plan. A formal variance request will be submitted to Engmn nng Development Review following the PDP public hearing to document the final sidewalk design. Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mviratal�fcgov.com Topic: Construction Drawings Comment Number: 7 Comment Originated: 04/04/2012 04104/2012. Please indicate north flowline information and roadway lane striping on Elizabeth Street to ascertain how the approximate area of the proposed patch situates with the "as-buir condition of Elizabeth Street. TMs be hown n the Utility Plans to be submitted during the Final Plan phase. Commend �lumer Comment Orginated: 04/04/2012 04/04/2012: The construction drawings show a 10' utility easement, which per the plat is intended to be vacated and should perhaps be removed from the labelling tl intended to be vacated. See revised Plat A 9.5' wide portion of the original UE not being dedicated as new right-of-way will remain. Topic: General Vic+ Ida 25/ f � cc� f'Jo F-It ' City of Fort Collins April 06, 2012 Dave Derbies Brinkman Partners, LLC 3003 E Harmony Rd, Suite 300 Fort Collins, CO 80528 Community Development and Neighborhood Services 261 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970 224.6134 - fax fcgov comedeve/opmenaeview v v' RE: 1409 W Elizabeth Street Student Apartments, PDP120009, Round Number 1 ° \ Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970416-2283 or clevingston@fcgov oom. Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970416-2283, ctevingston(cDfcl7ov.com Topic: Building Elevations Comment Number: 2 Comment Originated: 04/02/2012 04/02/2012: We will need a colored rendering of the elevations prior to hearing to assist in assessin compatibility outlined in Section 3.5.1 of the land Use Code. Coloredevabons and 3D mews have been provided and are attached with these comment responses. Topic: General Comment Number: 1 Comment Originated: 04/03/2012 04/03/2012: We will want to ensure that the development area on site plan, the development agreement and the plat all match up and Clearly defined on each. Please label the PDP development area on the site plan and remove the dashed line down the middle. The PDP development area has been identified on sheet LS101. Comment Number: 2 Comment Originated: 04/03/2012 04/0412012: Staff is wondering if bollards are the best option to contain C.B.&Potts spill over parking. Would signage be a more appropriate first step and see if that addresses any potential issues? While there is nothing that I am aware of in the Code that precludes bollards (no PFA issues), Staff suggests reconsidering the bollard approach. Acknowledged Co mmeM Number: 3 Comment Originated: 04/04/2012 04104/2012: Floodplain does not allow for basement storage units in this instance. Acknowledged. Topic: Site Plan