HomeMy WebLinkAboutREGISTRY RIDGE, 5TH FILING - FDP - 32-95J - CORRESPONDENCE - REVISIONS (3). ZAMM Project Comments Sheet
City of Fort Collins Selected Departments
Department: Stormwater-Water-Wastewater
Date: July 18, 2007
Project: REGISTRY RIDGE 5TH FILING PDP - TYPE I AND FINAL PLANS
All comments must be received by Shelby Sommer in Current Planning, no later
than the staff review meeting:
July 18, 2007
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Erosion Control Plans
Number: 136 Created: 7/17/2007
[7/17/07] Please add an erosion control construction sequence to the Erosion Control Plan.
Topic: Landscape plans
Number: 137 Created: 7/17/2007
[7/17/07] Please call for the area where the off -site sanitary sewer will be constructed to be
dryland seeded.
i elm
Topic: Plat
Number: 135 Created: 7/17/2007
[7/17/07] The drainage easement on tracts B and C should be dedicated to the public rather
than to the HOA.
Adjust the note to say that no permanent obstruction that would inhibit drainage flow shall be
located within drainage easement located on Lots 17 through 22 and Lot 25.
Topic: Utility Plans
Number 144 - - Created:7/18/2007
(7/18/07] Please call out the type and size of all storm sewer facilities on the utility plan.
Please provide an inlet detail for the two proposed inlets.
Please correct the label of the rip rap detail on the detail sheet, it is currently labeled as a
sewer service connection detail.
Date
HECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
—� Plat Site 1�rainage Report Other
�CJtility �edline Utility Landscape
Page 1
r
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750. Please revise your plans per
the comments listed, and then send me PDF copies of the plans to distribute to the
other staff members. When I have everyone's approval, you will then be able to
print the mylars and have the appropriate signature blocks signed (attorney
certification, Lennar ownership, surveyor, engineer,. etc). I will collect all City
signatures on the mylars and then will have the plans recorded.
Sincerely,
QV I bq &wW
Shelby Sommer
Associate Planner
Page 3
Number: 140 Created: 7/18/2007
[7/18/07] Just need the reception number for the district's easement before printing
the mylars.
Topic: Utility -General
Number: 116 Created: 6/18/2007
[7/17/07] Thanks Cody! But still shown on sheet U1 :D Gotcha!
[6/18/07] Please remove the shaded box that represents the trailer (?) from all
sheets except for the existing conditions sheet.
Number: 139 Created: 7/18/2007
[7/18/07] Just a few scanning issues Cody. Nothing big. I highlighted them in pink
so you can address them easily. Thanks!
Topic: Utility - R4
Number: 142 Created: 7/18/2007
[7/18/07] Upper right detail - it's not legible but does it really need to be? Let's talk
about this one...
Topic: Utility - Utility Sheet
Number: 141 Created: 7/18/2007
[7/18/07] 1 had the Inspection review your street cuts and mark out the limits per the
standard. This is what they will require in the field so it might be helpful for your
client to know what that will be now. I should have done this with the last round,
sorry Cody.
Department: Stormwater-Water-Wastewaterlssue Contact: Basil Hamdan
Topic: Erosion Control Plans
Number: 136 Created: 7/17/2007
[7/17/07] Please add an erosion control construction sequence to the Erosion
Control Plan.
Topic: Landscape plans
Number: 137 Created: 7/17/2007
[7/17/07] Please call for the area where the off -site sanitary sewer will be
constructed to be dryland seeded.
Topic: Plat
Number: 135 Created: 7/17/2007
[7/17/07] The drainage easement on tracts B and C should be dedicated to the
public rather than to the HOA.
Adjust the note to say that no permanent obstruction that would inhibit drainage flow
shall be located within drainage easement located on Lots 17 through 22 and Lot 25.
Page 2
i r
STAFF PROJECT REVIEW
City of Fort Collins
BUD CURTIS/CODY SNOWDON Date: 07/18/2007
NORTHERN ENGINEERING
200 S. COLLEGE AVE.
FORT COLLINS, CO 80524
Staff has reviewed your submittal for REGISTRY RIDGE 5TH FILING PDP - TYPE I
AND FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: Landscape plans
Number: 134 Created: 7/16/2007
[7/16/07] The note at the bottom of the landscape plan regarding planter boxes,
structures, and obstructions should also be added to the site plan. Does this include
fences? Please specify on both plans.
Topic: Plat
Number: 105 Created: 6/12/2007
[7/16/07] I've discussed the issue of the signature blocks with our Technical
Services department and they would prefer that the signature blocks simply say
"owner"and do not indicate which tracts each parties own (see redlines). Also, you
are missing an ownership certification block on the site plan because we'll need one
for Lennar and one for the City. Sorry for all of the confusion on this issue!
[6/12/07] Please change the City Signature Block to say "Tract H of the Corrected
Plat of the Registry Ridge PUD First Filing" and the Lennar Signature Block to say
"Tract C of the Corrected Plat of the Registry Ridge PUD First Filing." This will help
clarify who owns which portions of the previous PUD, since this new filing does not
have a Tract H and also has a new Tract C.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 143 Created: 7/18/2007
[7/18/07] I'm ready for mylars provided the remaining few issues are addressed. It
would be a good idea to run your plat by Tech Services one more time to make sure
the legal closes.
Topic: Plat
Number: 138 Created: 7/18/2007
[7/18/07] From Technical Services:
1. Plat doesn't close by 0.05', with 1:71188 closure.
2. Title Sheet - prepare per Shelby Sommers direction.