HomeMy WebLinkAboutMIRAMONT SELF-STORAGE P.U.D., LOT 2, BOARDWALK OFFICE BUILDING - MINOR AMENDMENT - MA06058 - CORRESPONDENCE - (7)COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES
Fort Collins Neighborhood & Building Services
Ciro o(Furt Collins 281 N. College Ave., P.O. Box 580; Fort Collins, CO 80522-0580; Voice: 970 2216760 FAX: 970 224 6134
Codes and Standards
City of Fort Collins adopted codes applicable to all construction.
Residential - Includes single family, duplex and property -line townhomes
2003 International Residential Code with local Amendments
2005 Fort Collins Residential Energy Code (IRC chapter 11 amended entirely)
Accessibility -State Law CRS 9-5 (4 or more units in one building or more than 7 units in one
project) designed per ICC/ANSI Al17.1-1998
Wind Load: 100- MPH 3 Second Gust Exposure to be determined site specific
Roof Dead Load: 15 PSF min.
Snow Load Live Load: 30 PSF min.
Ground Snow Load 30 PSF
Frost Depth 30 inches -
Seismic Design Category B
Commercial & Multi -family
1997 Uniform Building Code with local Amendments
2003 International Mechanical Code w/Amendments
2003 International Fuel Gas Code w/Amendments
2003 International Plumbing Code
2005 National Electrical Code
Fort Collins Nonresidential Energy Code, an amended version of ASHRAE/IES 90.1-1989
Fort Collins Multi -family residential energy code, 1995 Model Energy Code with amendments
Accessible and Usable Buildings and Facilities, ICC/ANSI Al17.1-1998, State Law CRS 9-5
Wind Load: 100-MPH Exposure B or 90-MPH Exposure C
Roof Dead Load: 15 PSF min.
Snow Load Live Load: 30 PSF min.
Ground Snow Load 30 PSF
Frost Depth 30 inches
Seismic Zone 1
Pre -submittal Code Review Meeting Required
For All New Commercial & Multi -family prior to submitting for building permit
To schedule a Pre-submittial Code Review Meeting, call 416-2747.
For questions regarding City of Fort Collins Zoning, call 416-2745.
For questions regarding Contractor Licensing rules call Delynn Coldiron at 221-6767.
�& Mft-
City of Fort Collins
Current Planning
DATE: July 13, 2006
PROJECT
COMMENT SHEET
TO: Building Inspection RECEIVED
JUL 18 2006
PROJECT PLANNER: Ted Shepard CURRENT PLANNING
#54-87AP Miramont Self Storage PUD, Lot 2, Boardwalk
Office Building Major Amendment — Type I
Please return all comments to the project planner no later than the staff
review meeting:.
.August 2, 2006
Please find attached the various codes that the Fort Collins
Building Department will enforce. Be aware that a pre -submittal
meeting is required by the Building Department to address some
potential Code concerns. See the attached document to schedule
this meeting.
Date: 07/17/06 lz, C Lf-,f
Plans Analyst Rick Lee
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report —Other-
-Utility _Redline Utility _Landscape City ofCity F
Number: 5 Created: 7/ 21 / 2006
[7 / 21 / 06] The site plan shows a monument sign along the drive on the
north side of the lot. I don't believe that's a public street. Monument signs
are only allowed along a public street and must be located within the
boundaries of the lot. Even if the drive on the north is a street, where it's
shown is outside the boundaries of the lot.
Number: 6 Created: 7 / 21 / 2006
[7/21/06] For sign code purposes, processing this as a major amendment
results in this being a separate development (no longer part of the original
Miramont Self Storage PUD). As such, this property would be allowed one
monument sign along Boardwalk. The sign would be limited to 32 square
feet per side with a maximum overall height of 5'.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
$SeveWOl't"�Obk-
City Planner
cc: Susan Joy
Cameron Gloss
Stu MacMillan
Current Planning file #54-87AP
Page 7
Topic: Grading
Number: 45 Created: 8/ 1/2006
[8/ 1/06] Please extend contours off -site. Show existing grades to the west.
Make sure that your grades along the west property line will match existing.
Topic: Stormwater
Number: 44 Created: 8 / 1 / 2006
[8/ 1/06] Please show the downstream conveyance from this site and
demonstrate that these were built to accommodate the 100 year flows
issued from this site.
Swale on the west property line is at less than 2 percent will need a pan
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/WW
Number: 40 Created: 8/ 1 /2006
[8/ 1/06] Provide more detail on water/sewer services. Size? How will
services connect to building? Will fire line be needed?. If not, abandon at
main.
Number: 41 Created: 8/ 1 / 2006
[8/ 1/06] Will separate irrigation tap be needed?
Number: 42 Created: 8 / 1 / 2006
[8/ 1 / 06] Add water service and meter pit details.
Number: 43 Created: 8 / 1 / 2006
[8/ 1/06] See plans for other comments.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 2 Created: 7 / 21 / 2006
[7/21/061 Per Sec. 3.2.1(E)(4)(a), perimeter parking lot landscaping requires
one tree every 40' along a side lot line. 2 more trees are required in the
landscape area along the south lot line abutting the parking lot.
Number: 3 Created: 7 / 21 / 2006
[7/21/061 General note 8 on the site plan states that the trash enclosure
will match the finish materials of adjacent buildings. The detail on sheet 4
of 4 shows a cedar fence enclosure. This material doesn't match the
buildings.
Number: 4 Created: 7 / 21 / 2006
[7/ 21 / 06] This is in the neighborhood sign district. Must show proposed
wall sign locations on the architectural elevation drawings.
Page 6
Number: 47 Created: 8/4/2006
[8/4/06] REQUIRED ACCESS:A fire lane is required. This fire lane shall be
visible by painting and signage, and maintained unobstructed at all times.
A fire lane plan shall be submitted for approval prior to installation. The fire
lane must meet be designed as a flat, hard, all-weather driving surface
(asphalt or concrete) capable of supporting fire apparatus weights.
Compacted road base shall be used only for temporary fire lanes or at
construction sites. The fire lane must be designated on the plat as an
Emergency Access Easement. The required minimum width of 20 feet must
be maintained throughout the length of the fire lane.
Number: 48 Created: 8/4/2006
[8/4/06] WATER SUPPLY: Fire hydrants must be shown on the site plan, to
ascertain whether an approved hydrant is within 300 feet of the building.
Number: 49 Created: 8/4/2006
[8/4/06] HMIA: Toxic, corrosive, or reactive materials, or
flammable/combustible liquids (as defined in the Uniform Fire Code) if
used, stored, or handled on site, must have a Hazardous Materials .Impact
Analysis (HMIA) completed and supplied to the Planning Department and
the Fire Department. (What do you have? How much? How do you prevent it
from being a public threat?)
Number: 50 Created: 8/4/2006
[8/4/06] KNOX BOX: If the building is equipped with an automatic fire
sprinkler system, Poudre Fire Authority requires a "Knox Box" to be
mounted on the front of the building.
Number: 51 Created: 8/4/2006
[8/4/06] FDC: If the building is equipped with automatic fire spinklers, the
fire department connection (FDC) must be installed in a location readily
accessible to fire apparatus, and approved in advance by PFA.
Department: Transportation Planning Issue Contact: Kurt
Ravenschlag
Topic: Easements
Number: 53 Created: 8/ 8/ 2006
[8/8/06] No Comment
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Basements .
Number: 52 Created: 8/4/2006
[8/4/06] Please provide an easement for the water quality pond area.
Page 5
Number: 30 Created: 7 / 31 / 2006
[7/31/06] Is Oakridge Drive to the north public row or is this a private
drive? A tract?
Number: 31 Created: 7 / 31 / 2006
[7/31/06] The site plan is showing proposed water and sewer bring brought
in from Boardwalk Drive - is this correct? If so, please update the utility
plans to match.
Department: Light & Power Issue Contact: Rob Irish
Topic: light & Power
Number: 7 Created: 7/31 /2006
[7/31/06] Proposed building will be fed from the existing electric vault at
the northeast corner of the site.
Number: 8 Created: 7/ 31 / 2006
[7/31/06] Proposed transformer location and the feed to the transformer
will need to be in a utility easement.
Number: 9 Created: 7 / 31 / 2006
[7/31/06] Proposed transformer must have 3' of clearance around the back
and sides and 8' of clearance in front of the doors on the transformer.
Number: 10 Created: 7 / 31 / 2006
[7/31/06] Light 8s Power will require a C-1 Form and a One -Line Diagram.
Also, developer is responsible for Electric Capacity Fee's and Building Site
charges.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 1 Created: 7/ 14/2006
[7/ 14/06] Due to the lot size of this project a fugitive dust control permit
will probably not be required by Larimer County and the State of Colorado.
Please contact Larimer County Environmental Health Services at (970) 498-
6700 to confirm this.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 46 Created: 8/4/2006
[8/4/06] COMMENTS FROM DECEMBER 2004: The previous comments
from PFA, acknowledged in the applicant's letter, still apply, in addition to
the following new comments from PFA.
Page 4
Number: 32 Created: 7 / 31 / 2006
[7/31/061 Will need an access easement for the portion of the ramp on
Boardwalk that is not built in public row unless this is in a tract with an
access easement already dedicated? Please verify and label accordingly.
Topic: Site Plan
Number: 22 Created: 7/31 /2006
[7/31/06] Please remove contour lines from the Site Plan.
Topic: Street Oversizing
Number: 11 Created: 7/ 31 / 2006
[7/31/061 From Tim Tuttle in Street Oversizing: the Estimated Street
Oversizing Fee for this development is $34,345.76.
Number: 12 Created: 7 / 31 / 2006
[7/31/061 From Tim Tuttle in Street Oversizing: Street Oversizing will
reimburse the developer for 0.5' of sidewalk on Boardwalk Drive.
Topic: Utility Plans
Number: 23 Created: 7/31 /2006
[7/31/06] Detail Sheets - Label all on -site details as "on site" so that they
are not used in the public row.
Number: 25 Created: 7/31 /2006
[7/31/06] Detail Sheets - Please provide details 701, 702, 707, 708, 1601,
1602, 2501.
Number: 26 Created: 7/31 /2006
[7/31/06] Please see Appendix E1 and E2 for the current General and
Construction Notes. Please see Bob Zakely for the correct Erosion Control
Notes.
Number: 27 Created: 7/31 /2006
[7/31/061 The Legend is incomplete.
Number: 28 Created: 7/31 /2006
[7/31/06] General Notes page - reference the updated or current soils
report. Please provide two project bench marks. Please provide the names,
addresses, phone numbers for the Developer(s), Owner(s), and
Consultant(s).
Number: 29 Created: 7/31 /2006
[7/31/06] Grading Sheet - Please provide this statement:
The top of foundation elevations shown are the minimum elevations
required for protection from the 100 year storm.
Page 3
Topic: Landscape Plan
Number: 38 Created: 8 / 1 / 2006
[8/ l/06] The originally approved Landscape Plan had street trees along
Boardwalk Drive spaced at 40' on -center. The street trees as shown on the
Minor Amendment Landscape Plan are spaced at 47' to 59' on -center. Per
Section 3.2. 1 (D) (2) (a) of the LUC, street trees shall be planted at 30' to 40'
spacings. As stated in comment #35 of this letter,
Number: 39 Created: 8 / 1 / 2006
/ [8/ 1/06] Per Section 3.2.1(E)(4)(a) of the LUC, 2 additional shade trees are
V required along the south property line in the parking setback area. They are
needed to satisfy the Minor Amendment criteria as cited in comment #35 of
this letter:
Topic: Site Plan
Number: 37 Created: 8 / 1 / 2006
[8/ 1/06] Some action may have to betaken to allow the roof overhang over
the 15' utility'easement on the east (Boardwalk Drive) side of the building.
Topic: Utility Plans
Number: 34 Created: 8/ 1 / 2006
[8/ 1/06] Don Kapperman of Comcast Cable indicated that they are
requesting a 6' utility easement to the proposed transformer, location
depending on the City Light & Power trench routing.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 15 Created: 7 / 31 / 2006
[7/31/06] Please construct the driveway entrance in accordance with
drawing 707.
Number: 17 Created: 7 / 31 / 2006
[7/31/061 Please label and dimension all row, easements, sidewalk widths,
etc, and whether or not the improvements are proposed or existing. Right
now the plans aren't very clear.
Number: 18 Created: 7 / 31 / 2006
[7/31/06] No footings or foundations are allowed in the easements
Number: 19 Created: 7 / 31 / 2006
[7/31/06] Please label proposed project ID signs. Is this located in a Tract
or?
Number: 20 Created: 7 / 31 / 2006
[7 / 31 / 06] Please see Transportation Planning regarding the configuration
of the handicap ramp on the west side of the building.
Page 2
A ZE1
e STAFF PROJECT REVIEW
City of Fort Collins
John Dengler and Associates Date: 08/09/2006
c/o John Dengler
5336 Highcastle Court
Fort Collins, CO 80525
Staff has reviewed your submittal for Miramont Self Storage PUD, Lot 2,
Boardwalk Office Building - Major Amendment, and we offer the following
comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 33 Created: 8/ 1 / 2006
[8/ l/06] Rick Lee of the Building Department indicated that a pre -
submittal meeting is required by the Building Department to address some
potential Code concerns. Also, he is forwarding a copy of the Codes and
Standards that his department will enforce.
Number: 35 Created: 8 / 1 / 2006
[8/ 1 /06] City staff has determined that this request actually satisfies the
Minor Amendment criteria set forth in Section 2.2.10(A)(2) of the Land Use
Code (LUC) and, therefore, is further processing this request as a Minor
Amendment rather than a Major Amendment. No public hearing will be
required. However, this section of the LUC does state that "such minor
amendments may be authorized by the Director as long as the development
plan, as so amended, continues to comply with the standards of this Land
Use Code, at least to the extent of its original compliance (so as to preclude
any greater deviation from the standards of this Land Use Code by reason of
such amendments)".
- / Number: 36 Created: 8 / 1 / 2006
V [8/ 1/06] A more detailed breakdown of the types of proposed office uses in
vv� h' the building must be provided so that the maximum allowable parking on -
site can be assessed relative to the 8,800 square feet of floor area.
l
Number: 54 Created: 8 / 9 / 2006
[8/9/06] J.R. Wilson of Technical Services indicated that there are some
minor drafting problems that need to be taken care of.
Page 1