Loading...
HomeMy WebLinkAboutMASON STREET NORTH - MAJOR AMENDMENT - 4-97B - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESMason Street Court project aims at creating a model LMN neighborhood, by providing a set of well designed courtyards and plazas and making them visible and accessible (Policy LMN-2.9), while providing retail opportunities (Policy LMN-2.7). 2. Description of Proposed Open Space, Buffering, and Landscaping Organizing the buildings around open spaces, forming well -scaled courtyards, gardens, and plazas is one of the major planning and design principles followed in the Mason Street North project. Both building.A and building B have two wings, connected by bridges in the middle. These bridges act like gates into the inner courtyard. Underneath these bridges, there are building entrances. The ceiling underneath the bridges is wood with recessed lighting, the ground is brick with an interesting pavement pattern, and benches are provided. The wings of building A and B enclose the inner courtyard and give it spatial definition. This inner courtyard is divided into sub -areas that are distinct and unique, but at the same time are connected to each other. These sub -areas are: a. The promenade situated between the two wings of building B: This promenade provides access to the courtyard from the parking lot situated between buildings B and C. This is a peaceful place with elevated tree planters provided for seating. Two relatively large trees (a Washington Hawthorn and a Honey locust) are provided at the western part of the promenade to soften the effect of hardscape while providing filtered sun and spaciousness. b. The central circle and the plaza: The central circle is the place where pedestrian paths meet and define the center of the courtyard. The circle is surrounded with colorful Hawthorns to emphasize its significance. At the center of the circle there is a place for public art, surrounded by an elevated seating area. This sculpture, we believe, will be a symbol for Mason Street North and will give its residents a sense of pride. The plaza is an elevated platform physically enclosed by the two wings of building A. Again, elevated seating/tree planters are provided to enhance the use of the plaza. The "Imperial" Honey locust situated at the center of the plaza will soften the effect of hardscape and will provide shade. This is a perfect place for neighborly gatherings. c. The south garden: This is a peaceful lawn facing South between buildings A and B (south of promenade). The Southern border abutting the railroad easement will be heavily planted with common lilacs. This will provide both buffering and visual appeal. This garden, surrounded by colorful trees (radiant crabapples and hawthorns) and lilacs, will be an attractive garden for reflection and contemplation. For a resident of Building C who wants to walk to the downtown areas, a stroll through these spaces goes under building B's bridge and through the promenade. It might include saying "hi" to the neighbor relaxing on her porch, walking by the public art, by kids c; ground floors is an appropriate density on Lot 12 to support the vision outlined in the "Mason Street Transportation Master Plan." We believe that the densities and the uses (especially the surface parking lot) proposed by the former "Martinez PUD" on Lot 12 did not address the potential role Lot 12 is now playing in Mason Street North project, i.e., the role of supporting the use of transit on Mason Street Corridor. By creating a continuous and well -designed sidewalk system and by providing uses with pedestrian interest on the ground floors, Mason Street North encourages walking, a purpose outlined by Principle T-5 and Policies T-5.1, 5.2, and 5.3 of the City Plan. Also, by providing adequate bike racks in key locations, Mason Street North encourages biking, a purpose outlined by Principle T-4 and Policy T-4.1. Additionally Mason Street North accommodates private car ownership (Principle T-9). The new site plan includes 91 parking spaces, 12 of which are private garages and 22 of which are located under building C. In addition to these, the developers of Mason Street North are willing to build a surface parking lot for 17 cars to be used by Martinez Park visitors, on park land situated at the east side of Mason Court (please see the site plan). Principle CAD-1 of the City Plan emphasizes the importance of a well -scaled, street -oriented architecture in providing a visually appealing environment. This principle especially justifies our design approach of replacing the previous scheme proposed by the "Martinez PUD" (a single building with large surface parking lot). Our scheme provides a street -oriented architecture with traditional brick work, shop windows, awnings, street trees, and a well -articulated lighting scheme along Mason Court. Principle CAD-4 and Policy CAD-4.1 of the City Plan emphasizes the importance of the "natural' safety of the neighborhoods, normally achieved by surveillance. Recent design research agrees that deserted areas, such as large parking lots create gaps in the urban fabric and are the most likely places for crime to occur. Whereas neighborhoods that are full of activities and people give us the message that they are safe environments. In Mason Street North, we aim to create a gapless fabric with well -observed and scaled outdoor spaces that connect to both office and residential uses. Well-defined open spaces not only provide opportunities for casual neighborly gathering but also create a safe environment. It is important to point out that in order to have a "natural approach" to crime prevention, there needs to be enough density and mixed uses in a neighborhood. This is another reason why we believe that the uses and densities we are proposing for Lot 12 are appropriate. Principle LMN-1 and Policy LMN-1.2 of the City Plan encourages the mix of housing types. Mason Street North adds more diversity to "Martinez PUD", which already provided 34 co -housing units, 8 single family detached units, and 2 single family/mixed-use units. To these types; Mason Street North adds walk-up and apartment units within mixed - use buildings. Among the 20 units provided in Mason Street North, 4 are one -bedroom units (20 %), 11 are two -bedroom units (55 %) and 5 are three -bedroom units. Mason Street North provides a rich array of choices for future residents not only in terms of size, but also in terms of the plan types as well. 2 1. Achieved City Plan Principles and Objectives The Mason Street North project is a major amendment application for the "Martinez PUD" submitted on April, 1998. The purpose of this amendment application is to provide a development on Lot 12 that is more in accordance with the principles and policies outlined in the City Plan, 1997. The following is a list of the City Plan principles and policies addressed by the Mason Street North project. Each item will be followed by a discussion of how the proposed design fulfills the intent of the stated principle and/or policy. Principle LU-1 and Policy LU-1.1 of the City Plan advise the use of "compact" development to encourage synergies between uses, "pedestrian and transit use," and "cohesive" community development. Achieving such compactness and cohesiveness has been an important design principle for the Mason Street North project. We believe that the compactness achieved by well -knit open spaces wrapped by mixed -use buildings, provides the vitality important to creating new neighborhoods. Large surface parking lots such as the one proposed in "Martinez PUD,"create gaps in the city fabric. These kinds of gaps form deserted areas in the middle of the city and damage the desired "cohesiveness." By providing a mixed -use development organized around well -scaled and well -utilized outdoor spaces, we aim to create a healthy and "cohesive" neighborhood. Since Lot 12 is a very key location, in terms of providing a link between the rest of the "Martinez PUD" and downtown, in addition to between Martinez Park and downtown, it makes sense to provide a higher density of mixed -use development on Lot 12. We believe that creating the pedestrian continuity along Martinez Court enhances the mentioned "compactness." The general character of the proposed design follows the traditional urban patterns developed successfully over time in Fort Collins. Buildings on the proposed site plan define outdoor spaces, such as courtyards and plazas, each providing a unique experience. Each building is articulated specifically to encourage the unique character of its surrounding for the purpose of providing rich memorable locales throughout the proposed project. This richness, we believe, is an important design goal that enhances the "sense of place" mentioned in Principle LU-2 of the City Plan. By providing generous open space with a variety of unique courtyards, plazas, and outdoor rooms, we will encourage casual gatherings and neighborly interaction. This kind of vitality and architectural richness is important in creating places for memorable experiences, with a strong "sense of place" in new neighborhoods such as Mason Street North. Principle T-1, Policy T-1.1, and Policy T-1.2 of the City Plan emphasize the importance of appropriate densities and uses in achieving development patterns that support transit use. In terms of the transportation patterns, Lot 12 of the "Martinez PUD" occupies an important location at the north end of Mason Street; the multi -modal transportation backbone of the city as envisioned by the "Mason Street Transportation Master Plan." Terminating the Mason Street multi -model transportation corridor with Martinez Park, is one of the goals outlined in "Mason Street Transportation Master Plan." Accordingly, providing the most appropriate density and use on Lot 12 becomes very important. We believe that a mixed -use density with 20 residential units and 17,524 sf. retail/office on the 1 A STATEMENT OF PLANNING OBJECTIVES FOR MASON STREET NORTH 0 777 PEARL ST. N 210, BOULDER, COLORADO 90302 TEL, 303.447.2786 FAX 303. 447. 2968 EMAIL w13(^w12ICh.CD117 ■ Features • Tamper proof design. • Choice of two distributions. • Copper free cast aluminum face plate with stainless steel hardware. • Lighting pattern provides wide lateral distribution and long forward throw. Available in Bross, see page 90. 3 +ie' 1 we" 5' Dla.� MR16 Lamp �e=A So° Angle = B Two Stainless Steel Wall Black Oxide Hex Socket Head Screws Round Cast Aluminum Box nth Five vz' NPS Tapped Holes. 'our Plugs Provided. :ek9wzSli see oa4e 104. tar'" is a unique concept in step, r low-level area lighting. Recessed he architectural elements of steps, cetera, its unique face plate and assembly design allows for mount- ghts well below any visual glare The choice of two optical cutoffs e designer a choice of long or short patterns. The small compact of the cast aluminum or solid brass ate allows the Step Star to blend 3 most discriminating architectural ipe designs. Cast aluminum back box, suitable for concrete pour applications. a & (11; Listed with MR16 lamps to 50 watts. For use with remote transformers, see pages 92, 94, and 97. CATALOG NUMBER LOGIC Example: SS - B - BZW - A Series TI LType My others 1 -'ESX 20W , 12' Spot 3 -FRB 35W , 12° Spot 15 - EYR 42 120 Spot 6 - EXT 50W), 13, Spot FinishSAP Cut-ott A - Short (66°) B - Long (90') Powd er Coat Color Satin Wrinkle Bronze BZP BZW I k BLP t Light Fixture F Master Catalog Number Series Aperture LG 7 LGZ 9 12 NOTES 1 Not available in 12-Inch luminalre. 2 Available in 940ch aperture only. Round Lens 14 as Example: LG 7 RW T73 Incan Door Frame Shielding Options/ RW Regressed T73 Prismatic lens Accessories white door FFL Rat Fresnel lens See pages SO Stepped CHL Concave 176-181. black baffle HDlophone lens RNI Flush white DOL2 Drop opal lens door ORDERING/PACKAGING OPTIONS To accommodate the product's physical configuration as well as a range of customer handling and processing needs, two alternative ordedndpackagingmsthodsomavailable. 1) Standard Packaging (optimized form) 2) Component Packaging To order, use a single muforcatelog number. Order housings as unit or J2 pack, and trims as unit or A pack Example: 1131 La 711WT71. as per componemorder guide listed below. 9emreashhpa multiple components using optimiaedpackag- Houalnp Only''. Ing. Example above ships as: ORS an.nor4 HSGUor J2 IUtyi2) 01157115GA16cartonsof2hsusingn Trmr0mV: otyl) 0Re7NSGUll comonofl housing) lQty12) LG7RWT73TBIMJ413carmnsof4mms) sees, eoa,ture.doer shielding Tons VorJ1 low I) LG7RWT77TMMU(l carton off him) NOTE 1 LOZ12 luminaires utliae on LGZ housing. Substitute LGZ for GRS in housing line. Ea: LGZ12 MSG U. Available in unit peck Nl only. 2 12 inch housing endlrim available in unitpock WI only. CaL Max.Waw Height Length Width Aperture Ceiling Overlap No. Lamp Opening Trim LG7 10DWA17/A19 8-7/8(22.5) 12-15116132.91 15-13/16(40.2) 7-1/808.1) 8-1/8(20.6) B-5/6(21.9) 15OW AZt 9-5/8124.4) LG9 ISM A21 9-1/2(24.1) 17(43.2) 17-3(76(43.7) 8-3/4122.2) 9--V`10.8) 10.1/4(26.0) ZOOW A23 10-1/8125.11 LG 12 200W A23 /1-1/2(29.2) 17(43.2) 17-3/16143.7) 11-7/16(29.1) 12-1/2(31.8) 13133.0) 300W PS25 12-1/8130.8) LGZ7 1DOWA17/AI9 7-1/4(18.41 12-15116(32.9) 15-13/18140.21 7-1/B I18.11 8-1/8(20.61 8-5A(21.91 15OW A21 LGZ9 'SOW A21 7-1/8(18.1) 17143.2) 17-3/18143.71 8-314122ZI 9-3/4(24.8) 10-1/4(26.0) 20OW A23 LGZ 12 20DW A23 8-11/16(22.1) 19148.31 18-15l16148.111&3/16131.0) 13-1/4133.7) 13-314(34.9) 300W PS25 Drawings for dimensional detail only. May not represent actual mechanical configuration. Dimensions are shown in inches (centimeters). Round Lens Round Lens (Low Profile) t Fixture r_ box. EiC bars pro"vi' e , -_,zo - i1 ,.. justment Listing: Fixtures are ILL 1571, lis' thru-branch wiring, [edeased m and wet locations. Listed and, jab' comply with. Canadian 7$tandar6`.- E ad for hinting ;led to A 1 R920/49 GLGU 43 . RADIAL SHADES Catalog# Diameter Height Max Watt R916 16" 71 /2" 150 Watt R918 18" 71 /2" 150 Watt . R920 20" 71 /2" 200 Watt R924 24" 71 /2" 200 Watt ANGLE REFLECTOR Catalog# Diameter Height Max Watt A807 07" 8" 150 Watt A810 10" 10 1 /2" 150 Watt EMBLEM DEEP BOWL Diameter 12 Diameter Height Ma 10" 10" 200 16" Light Fixture I 4 4" Overall 7 Features: For Use With 120V. No Transformer Required. 5" Dia. Aluminum Wall Plate 1" Dia. Machined Aluminum Stem (2) #10-24 x I" Cap Head, Black Oxided, Stainless Steel Mounting Screws Universal Mounting Ring High Temperature Silicone 0—Ring Machined Aluminum Optional Lens or Sid (Up to Two can be Specified) Tempered Glass Lens PAR20 Lamp 50w Max. All Precision Machined Aluminum Construction. Mad. Base Lamp holder With 250"C, 18 Ga. Wire Leads (Leads Extend 6" Beyond Wall Plate). Utilizes any PAR20 Lamp, up to 50 Watts. Completely Sealed Optical Compartment, Clear Tempered Glass Lens, Factory Sealed. Tamperproof Design, Utilizes a Single, Flush Mid. Hex Screw polyester Powdercoat Finishes Standard. (Specify) L 3" Dia. —� /2" CATALOG NUMBER LOGIC EXAMPLE: CK — 49 — WHW — 9 Series: 1 Lamp Type: J 0 — By Others 47 — 50 PAR2O/H/NSP(50W), 9" N. Spot 48 — 50 PAR20/H/SP(50W), 16` Spot 49 — 50 PAR20/H/FL(50W), 30" Flood Finish: Powdercoat Satin Wrinkle Bronze BZP BZW Black BLP BLW White Gloss WHP WHW Aluminum SAP — Verde VER Lens Type: 9 — Clear (Standard) 10 — Spread 13 — Rectilinear Shielding: 11 — Honeycomb Baffle Light Fixture C — 11 CATSKILL SERIES TM j!A 3/9B B-K LIGI3'TING, INC. S DRAY/MC NUMBER B—I1B5—01 betn, , } --nt Project: Type: _ Fixture Shielding Reflector Mounting Lamp Type / Finish Voltage Series Wattage Pole Series Height Finish Options Series Shielding Reflector Mounting Lamp Type / Wattage Finish Voltage BPO Beta Pendant open open BPC L Tempered Glass Lens D Potycarbonate Diffuser R3 Type III Aluminum reflector- R5 Type V Aluminum reflector 1 Single 2 Double 2C Double Cluster 3C Triple Cluster Metal Halide S050' 50w S070 70w S10o 1oow WH B. BZ SV White Black Bronze Silver 120 208 240 277 H050' 50w Ho 70w H100 100w Beta Pendant closed 4C Quadruple Cluster HI50 150w H175 175w S150 150w SP Specify Color 347 W Wall Mount P Pendant ' Not available in 347v. BPO-L O\ , 5 O.D. l51 mm) 2 3 4 5 i � t 6 26 W' (675 mm) 7 }. 10 B 9 21 1/4" (50 mm) BPO-D LIBEW nion Made UL C V� iliated with LISTED LISTED Local 363 SELUX Corp. 01998 PO Box 1060, 3 Lumen Lane Highland, NY 12528.1060 TEL: (914) 691.7723 1. Mounting Ann - (0 2" /51 mm) curved arm attaches to pole by means of a transition fitter supplied with fixture. 2. Fixture Connection -The fixture cap Is securely fastened to curved arm using a steel con- nector. 3. Fixture Cap - Decorative fixture cap: removable to provide easy access to ballast. 4. Gaskettng - Continuous molded gaskets provide weather- proofing, dust, and insect control. S. Upper Diffuser (Open Ver- slon) - A seamless acrylic opal upper diffuser allows light to spill onto fixture hood, enhancing the appearance of the fixture. 6. Fixture Hood -Decorative alu- minum shade he.,) white painted interior for maximum reflectivity. 7. Lamp - One ED-17 metal halide up to 175w or high pres- sure sodium up to 150w. Clear horizontal lamp recommended for R3 reflector. Clear vertical lamp recommended for R5 reflector. Lamp provided by others. 8. Reflector - Precision formed aluminum reflector available with a Type III or Type V distribution. 9. Shielding - Specify tempered glass lens or polycarbonate diffuser. Polycarbonate diffuser is vacuum formed, clear, U.V. sta. bilized, and has a pebble grain texture. The diffuser becomes luminous when lit, providing a pleasing glow. Both are secured using a captive ring and are easi- ly removable for access to lamp (no special tools required). 10 Socket - Pulse rated porce- lain medium base socket pre - wired to ballast at factory. 11. Ballast - (Not shown) A high power factor, open core and coil ballast regulates voltage for H.I.D. lamp. Consult factory for detailed ballast information. Exterior Luminaire Finish - The se'lux, high quality exterior finish is achieved by utilizing a multistep process. Each lumi- nalre undergoes a five -step cleaning, etching and sealing process. It is then painted with two coats of polyurethane paint. This ensures that it will withstand all weather conditions. Luminaire coatings are designed to offer excellent salt spray and humidity resistance (tested in accordance with ASTM B-117 & D-2247). Standard exterior colors are White qVH), Slaw,, (SK), Bronza (BZ), and Silver (SV). Custom color is available upon request. Please submit color chip. Light Fixture A, A2, A37 B 6/15/2001 Gl� (d). Addresses of all owners of record of real property within five hundred (500') feet of the property lines of the parcel of land for which the overall development plan is proposed, exclusive of public right-of-way. Missouri Improvement Co. Attn: Property Tax Department 1700 Farnam Street 10d' floor s Omaha, NE 68102-2010 H W H Enterprises, L.L.C. 2800 Olive Drive Cheyenne, WY 82001 Bernard Lee Bell, R and Christina Lynn 420A N. Meldrum Street Fort Collins, CO 80521 Blossom Development Corporation and Westside Line, L.L.C. 1225 Seventeenth Street Suite 3030 Denver, CO 80202 Terracon Companies, Inc. 16000 College Blvd. Lenexa, KS 66219 Jerry W. and Carol H. Heifner 3416 Terry Ridge Road Fort Collins, CO 80524 Michael W. Riek and Kerry D. Hoobler 312 N. Meldrum Street Fort Collins, CO 80521-2024 Jack Hibler and Michael J. Reiger 425 N. College Avenue Fort Collins, CO 80524-2408 Bojacs, Inc. 252 Clayton Street Denver, CO 80206 Jerry S. Moore 3617 Woodridge Road Fort Collins, CO 80524-1664 Nelda R. and Joe A. Coria 3920 Garfield Avenue Wellington, CO 80549 Juliana R. Miranda 323 N. Howes Street Fort Collins, CO 80521-2012 Jerry W. and Carol E. Heifner 3005 Southmoor Ct. Fort Collins, CO 80525 Paul D and Suzan J. Gillespie 310 N. Meldrum Street Fort Collins, CO 80521 Wilfred J. and Mary A. Wessels 316 N. Meldrum Fort Collins, CO 80521 0 777 PEARL ST. 0 210. BOULDER. COLORADO 80302 TEL.303.447.2786 FAX 303.447.2968 EMAIL wla@?wlarch.com 0 The Development Schedule: Project review and approval by the city: Construction drawings and permits Infrastructure: Construction: 3 months (July -September, 2001) 6 months (October, 2001- March, 2002) 1-2 months * (April, May, 2002) 16-24 months (June, 2002 — June, 2004) * In an unlikely case of the developers having problems with financing and sales, the construction might have to delay. However, the delay will not be longer than 2 years, i.e., the construction will start latest 2 years after receiving all city approvals. 0 777 PEARL ST. M 210. BOULDER, COLORADO $0302 "f E L. 303.4 41. 2796 FAX 303. 44T 2968 EMAIL wla(d Wlarchxom ■ Legal Description of the Site: Lot 12 and Track A of "Martinez PUD," 1998 0 777 PEARL ST. M 210. BOULDER. COLORADO 80302 TEL303.437.2786 PAX 303.447.2968 EMAIL wla@wlarrh.eom ■ Names of all General and limited Limited Liability Company Member Managers: Wonderland Hill Development Company (Jim Leach) 745 Poplar Avenue Boulder, CO 80304 John Wolff Tom Lyon 777 Pearl Street Suite 210 Boulder, CO 80302 ■ 777 PEARL ST. M 210. BOULDER, COLORADO 80302 TEL.303.447-2786 FAX 303.447.2968 EMAIL wla(dwlarehxom 0 The owner of the property (Lot 12 and Track A of "Martinez PUD," 1998): Wonderland Hill Development Company (Jim Leach) 745 Poplar Avenue Boulder, CO 80304 0 777 PEARL ST. 4 210, BOULDER, COLORADO 90302 TEL.303.447.2786 FAX 303.447.2969 EMAIL w13@w1arrh.ttnn ■ PARKING FIGURES FOR MASON STREET NORTH reserved for public use: West side of Building C: North side of Building C East side of Building C: Total: Additional off -site 12 10 10 32 reserved for public use 17 reserved for public use C D �✓ 100 yzv-) 32 total reserved for public use (22% higher than 40 spaces) Other parking provided on -site: North side of Building C: Underground Building C: West side of Building B: By Cherry Street: North side of Building A: Total: Total parking on site: 2 (2 garages) 21 10 (4 of which are garages) 21 (6 of which are garages) 4 58 (12 of which are garages) 32+58=90 Parking requirements (by code): No minimum requirement for office use. Maximum requirement for office use is 3 spaces / 1000 sf For residential: 1 bedroom: 1.5 spaces 4 units require: 6 spaces 2 bedroom: 1.75 spaces 12 units require: 21 spaces 3 bedroom: 2 spaces 4 units require: 8 spaces total required for residential: 35 spaces 91 spaces on site — 35 for residential use = 56 spaces (3.2 spaces / 1000 sf office use) However, 32 of 91 spaces are reserved for public. Therefore 56 — 32 = 24 the number of spaces for office use which is 1.37 spaces / 1000 sf office use 1. Parking Gary Lopez of the Zoning Department and Craig Foreman and Alison Brady of the Parks Planning Department (items 1 and 7 in the attached letter) commented about the parking provided for the park users. After the conceptual review we revised the site plan to accommodate more parking for public use and provided them in a location closer to the ball fields. In the current site plan we are providing 32 parking spaces that can be used by the Lee Martinez park users around the building C, the closest location to the ball fields. Since the building C will have parking for 22 in the basement, reserving the 32 parking spaces around building C will not create a conflict. In addition to this 32, the developers are agreed to build a parking lot for 17 on the parkland eastern part of the Lot 12. The original "Matinez PUD" agreement with Parks & Recreation allowed for the public use of 40 spaces within the large surface parking for 70 cars. The Mason Street North project increases the number of designated public spaces 20% to a tetG of 49 (32 around building C, 17 on the parking lot east of lot 12). V Q aw Also in terms of the overall parking provided, the "Martinez PUD" provided 70 spaces in total. Mason Street North provides 91 spaces total on Lot 12 and Track A. This number does not include 17 spaces provided on the parkland east of Lot 12. Mentioned 17 spaces are in addition to 91 provided on Lot 12 and track A. We suggested that we should restrict the traffic on the private road for private use only by means of erecting a "private road" sign. The landscaping scheme (by providing different trees along private road and Mason Court) would also communicate the restriction of private road. These suggestions seemed to be well accepted. As for the curves and limited sight line, we argued that this could be an advantage in terms of slowing traffic and making drivers more aware that they are not on a standard street, a 10 mph speed limit sign might also be helpful. We feel, and many neighbors agree, that we can influence the residents of the Mason Street North to use the main Mason Street exit to Cherry, by reducing the speed (by curves, roadside parking, and signage) on the private road. E'� project provides a strong street oriented architecture along Mason Court and around the roundabout it provides most of its parking. Therefore, considering the purpose of the standards, it is neither necessary nor useful to enforce the new parking setback standards to Mason Court. e. The Mason Street North project proposes a heavily landscaped 30'setback with two rows of trees along Cherry Street. This, we believe provides a more effective buffer than just mere distance. Also, in order to break the scale of the parking lots, the project proposes the use of garage buildings. With all these mitigation efforts we believe that Mason Street North is already dealing with the possible negative effects of -the parking lots. f. Finally, there is a significant possibility that the Downtown Development Authority of Fort Collins will fund an "upgrading" project for the parking lots proposed by Mason Street North, to treat these parking lots as "plazas" by paving them bricks and colored concrete pavers. This would provide an exceptionally pedestrian friendly environment that would connect downtown Fort Collins to Lee Martinez Park, through the Mason Street North project. In this context instead of buffering, making these parking lots visible would be a better urban design strategy. As of today DDA has committed to this "upgrading" project verbally in principle. 6. Comments on Neighborhood Meetings There have been two neighborhood meetings regarding the proposal. The first meeting was held at the River Rock Co -housing Common House on March 27, 2001. It was attended by several members of the Co -housing community as well as by a few residents/owners of the single-family homes on the lots between Mason Street North project and the co -housing. There was also at least one representative from the greater Martinez Neighborhood in the meeting. The second meeting was a Mason Street North project presentation provided at the regular Martinez Neighborhood meeting on April 9, 2001. In both cases the general reaction from the neighbors attending was favorable toward the proposed plans, and the majority felt that the new design was significantly better than the previously approved one (with only one large building and the parking lot on the corner of Mason and Cherry). The only concerns expressed were related to the potential for more traffic on the private road west of the project that serves the ten lots and the co -housing. Both the co - housing residents and the general neighbors wanted us to discourage traffic from the Mason Street North project on the private road (traffic that may be created by people who cuts through the rest of "Martinez PUD" to reach Sherwood Street). One resident of the single- family homes along the private drive was also concerned about adding parking and cars on the west side of the Mason Street North project, because the drive has some difficult curves with limited sight lines to navigate when exiting to the east. 7 For the parking lot provided between buildings B and C, again we decided to create a psychological feeling of "safety" by providing ceiling lighting at the arcades and illuminating the buildings. This will be supported by the two relatively strong wall lights attached to the garages. Again, here the purpose is to make the buildings visible and well lit with warm -colored lights and to avoid over -lighting the parking lot. The rest of the project follows the same principle of making the buildings and objects visible and avoiding light pollution. We believe that a highly lit environment would be very disturbing for both the residents and also for the users of the park. Parking setbacks: The Mason Street North project has been designed according to the City of Fort Collins' 1999 Development Standards, which, as we were informed, changed in March, 2001. The 2001 Larimer County Street Standards asks for a 50' setback from the curb of minor collectors (Cherry Street), and 40' from the curb of all other roads with a load over 100 daily average trips (drawing 19 — 03). The Mason Street North does not follow the new setbacks for the parking lots. The following are the reasons and justifications: a. Mason Street Court is proposed on a lot (Lotl2), which is outside of the city's regular grid. Therefore, the site (Lot 12) not only has an odd shape but also provides various easements for railroad, utilities and such. Planning for this site has been like walking on broken ice. Nevertheless, we believe that the Mason Street North project has overcome these hardships and provides a very pedestrian friendly, street oriented environment. We believe that the parking setback standards of 2001 are convenient for regular sites within the street grid, in forcing the developers to provide a street oriented architecture. However, these standards should not be enforced on the Mason Street North project. Enforcing these standards to Lot 12 would make a successful mixed -use project, impossible. b. The already approved "Martinez PUD" proposes a non -complying parking lot on Lot 12. This is an already acquired right. The Mason Street North project, as it is discussed above, aims at mitigating the negative impacts of the parking lot proposed in the "Martinez PUD." In other words, in terms of creating a pedestrian friendly and street oriented environment (which is the purpose of parking setbacks in the first place) Mason Street North project does a much better job than the "Martinez PUD" on Lot 12. Therefore, it would be unfair to penalize the Mason Street North project by applying the new parking setback requirements. c. Mason Court is a short street with a dead end and the entire street lies within the Mason Street North project (Lot 12 and track A), i.e., it serves the project and Lee Martinez Park users only. Therefore, it is not fair to apply new parking setback standards to Mason Court. d. Parking setback standards are usually intended to prevent undesirable views of parking lots from sidewalks and to encourage walking. The Mason Street Court :9 4. Estimated Number of Emalovees for Businesses and Commercial Uses The estimated number of employees for businesses and commercial uses in Mason Street North is approximately 50 employees. 5. Justifications for Variances from Criteria The Mason Street North project complies with all the applicable criteria outlined in Articles 3 and 4 of the City Code, with the exception of the lighting scheme and parking setbacks: The Lighting scheme: The lighting levels proposed by Mason Street North are lower in certain areas (especially around the parking lots) than the lighting levels listed in Fort Collins Site Planning and Design Standards (Section 3.2.4). The following is a brief discussion explaining our reasoning for the proposed lighting scheme, although the levels are lower than the ones listed in the standards. The lighting plan for Mason Street North is designed to provide adequately for security and safety concerns while creating a pleasant and inviting residential atmosphere. To this end exterior lights are distributed to areas of the site where pedestrians will be present. Recessed down lighting located under the entry bridges and along the arcades provide a sense of welcome for residents and guests. Small down lights placed on building walls provide additional accent lighting without creating sources of annoying glare. In summary, we believe the lighting plan responds sensitively to the residential needs of residents as well as neighbors. The fact that the Mason Street North project is located next to the Lee Martinez Park, and the fact that all the upper floors of the proposed project are occupied by residential units, makes us concerned with over -lighting the project. On the other hand, we realize the importance of lighting in creating a safe environment. Therefore, we decided to illuminate the buildings to create a feeling of "occupation" rather than "desertedness," and to avoid over -lighting the parking lots. This principle works in different areas as follows: One of the most critical areas in the project is the parking lot situated by the private road on the western side of the building C. Here, the neighbors on the western side expressed concerns about looking at a parking lot as a night view from their rooms. Therefore, we decided not to provide strong lights for the parking lot, instead preferring to illuminate building C by means of eight cylindrical bracket wall lights attached to the fagade. We believe that by illuminating the building fagade we are creating an appealing view while providing a safe feeling for the parking lot, even if the actual levels around the cars are low. playing under the honey locust tree, walking under building A's bridge, and reaching Mason Court. These events could be a rich and valuable experience for residents. The Mason Court sides of all three buildings are treated according to the principles of traditional street oriented architecture. The brick facades, awnings, shop windows, and large Summit Ashes on tree lawns provide a comfortable and appealing environment for walking on continuous sidewalks. The parking situated between buildings B and C is broken into smaller spaces by means of garages on each end and two Honey Locust trees on entrance islands in the middle. Both buildings have arcades facing the courtyard, which provide a separation between businesses and parking, as well as a comfortable zone for walking. These arcades will provide recessed ceiling lights for nighttime visibility that will not disturb the residents. In front of building C facing the parking, there is a row of Chanticleer Pears (a conical tree that can grow in limited space conditions). The sidewalk provided in front of building C (facing the parking) is larger than the one provided at the other side of the parking lot. The reason is that this sidewalk can cross the railroad and connect the parking lot proposed along Cherry Street. The character of this parking lot has a human scale by means of five garage buildings and heavy landscaping. The Honey Locust trees at the south of parking lot provide a second row behind the linden trees provided on the tree lawn by Cherry Street. By means of these two rows of trees the parking lot is separated from Cherry Street. Also, the Redtwig Dogwoods, planted on the middle divider, provide a strong visual division between eastern and western parts of the parking lot. At the eastern side of the parking lot a small plaza with a kiosk is provided. This kiosk visually terminates the pedestrian path coming from the south (the path proposed by the sub -area plan). For pedestrians walking to Martinez Park from the Civic Center, this path provides a comfortable walking experience. Mason Court ends with a roundabout, on which a single Colorado Spruce surrounded by continuous euonymus bushes, terminates the vista. The private road that continues towards the west is separated by means of a differentiation in street tree species and color. The Summit Ashes, provided along Mason Court surround the roundabout, while Autumn Blaze Maples take over along the private road. The parking provided at the west side of building C includes landscaped breaks. The large Autumn Purple Ash trees provided on these breaks create an appealing composition with the light amber and pale yellow colored stucco building in the background. All the dumpsters provided are screened by Bailey Red twig Dogwood bushes, which create very dense visual barriers from the pedestrian paths. 3. Proposed Ownership and Maintenance In terms of ownership, Mason Street North will be a condominium. The Mason Street North Owners Association will manage common areas, such as parking lots, courtyards, plazas, and gardens. Private open spaces, such as porches, balconies, and terraces will be owned and managed by private residents. M