HomeMy WebLinkAboutPEDERSEN AUTO PLAZA - PDP/FDP - 26-97 - CORRESPONDENCE - UTILITY PLANS (3)DATE: March 17, 1998 DEPT: Water/Wastewater
PROJECT: #26-97 Pedersen Auto Plaza,
Type II (LUC) PDP/FC
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, March 17, 1998
-Coordinate the landscape design with the civil design and provide the required landscape/utility
separations on the landscape plans.
-Draw meter pit to scale on utility plans and provide the required separation distances to the other
utilities.
-Replace 1 inch meter pit detail with a 1 1/2 inch meter pit detail on the detail sheet.
See site, landscape and utility plans for other comments.
c n
Date: Z /24 Ar, Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat X Site _ Drainage Report _
X Utility X Redline Utility X Landscape