Loading...
HomeMy WebLinkAboutDRAKE CROSSING WTF - PDP - 19-10 - CORRESPONDENCE - (12)Department: Zoning Issue Contact: Gary Lopez Topic: Zoning Number: 4 Created: 8/3/2010 [8/3/10] - no comment Be sure and return all of your redlined plans when you re -submit If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 416-2283. Sincerely, Courtney Rippy City Planner Page 3 On sheet Z2, elevations, an evergreen and a deciduous tree are illustrated in the east elevation graphic. Sheet LS1 only shows one (1) 12" deciduous tree to the east of the new stealth ligh tpole. Additionally, Number: 10 Created: 8/11 /2010 [8/11/10] Per LUC 3.8.13C(4) notes that a heavy emphasis on coniferous plants for year- round screening may be required. For any landscaping improvements, please increase the number of evergreens and decrease the number of deciduous trees, especially concentrating more evergreens in closer proximity to the pole for increased screening. Department: Engineering Issue Contact: Andrew Carney Topic: General Number: 15 Created: 8/17/2010 [8/17/10] As stated in Conceptual Review, this project is responsible for dedicating and/or vacating any right-of-way and/or easements that are necessary. It appears that two new utility connects are proposed to the SE of the pad. If these connections are not in a existing utility easement, a new utility easement will need to be dedicated via separate document to contain these connections. Each dedication will have a TDR Fee of $250. Also, a letter of intent will need to be obtained for each easement prior to hearing. Department: Light & Power Issue Contact: Alan Rutz Topic: Light & Power Number: 12 Created: 8/16/2010 [8/16/10] The existing transformer is a 300KVa 120/208v three phase. Number: 13 Created: 8/16/2010 (8/16/10] Development charges will apply. Contact Alan Rutz at Light and Power. 970-224- 6153 Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 19 Created: 8/18/2010 PFA has no comments or concerns at this time. Department: Technical Services Issue Contact: Jeff County Topic: General Number: 16 Created: 8/17/2010 [8/17/10] Please add a legal description to the cover sheet. Number: 17 Created: 8/17/2010 [8/17/101 There are line over text & text over text issues on plans LS, Z1 & Z2. Number: 18 Created: 8/17/2010 [8/17/10] There appears to be a mislabeled note on sheet Z2. See redlines. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater . Number: 14 Created: 8/17/2010 (8/17/10] Please provide a grading plan for the area being modified. Is the curb and gutter remaining or being removed? There is existing drainage that flows along the curb and gutter in this location. Page 2 STAFF PROJECT REVIEW City of Fort Collins Chris Stryker Date: 8/18/2010 Stryker Site Services/T-Mobile P.O. Box 1558 Denver, CO 80201 Staff has reviewed your submittal for T-MOBILE DRAKE CROSSING WIRELESS TELECOMMUINICATION FACILITY PDP - TYPE 1, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Courtney Rippy Topic: General Number: 1 Created: 7/30/2010 [7/30/10] Section 3.8.13 (C)(8) of the Fort Collins Land Use Code requires facilities and equiptment to be painted to match as closely as possible the color and texture of the surrounding built environment. Please note on your plans the color the pole is to be painted. I would recommend a dark green color to match existing evergreens in the area and mitigate noticeable visual impact Number: 2 Created: 7/30/2010 [7/30/10] Section 3.2.4 (D) of the Land Use Code states that the light source should be high pressure sodium and feature down -directional, sharp cut off luminaries so that there is no spillage of illumination off -site. What is the proposed light source? Please provide a detail regarding the lights on the proposed stealth light pole. Number: 3 Created: 7/30/2010 [7/30/10] The Final Plans for review and recording must be on 24" X 36" Mylar sheets. Number: 5 Created: 8/11/2010 [8/11/10] No information was provided relating to how the applicant has satisfied the requirement set forth in Section 3.8.13(B) regarding possible co -location of the T-Mobile equipment. Please provide this information. Number: 6 Created: 8/11/2010 [8/11/10] On sheet number T1, please correct the project description calling out how many equipment cabinets are proposed and correct the spelling of "stealth." Topic: Landscaping Number: 7 Created: 8/11/2010 [8/11/10] On sheet LS1, under "improvement heights," item number 6 is listed as a 6" deciduous tree in the table yet is illustrated with an evergreen symbol. Please verify that the tree in question is in fact an evergreen and update the plans accordingly. Number: 8 Created: 8/11/2010 [8/11/10] On sheet LS1, please lucidly illustrate and differentiate in table and graphic format the existing landscaping from the proposed improved landscaping. Number: 9 Created: 8/11/2010 Page 1