HomeMy WebLinkAboutDRAKE CROSSING WTF - PDP - 19-10 - CORRESPONDENCE - (12)Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 4 Created: 8/3/2010
[8/3/10] - no comment
Be sure and return all of your redlined plans when you re -submit
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 416-2283.
Sincerely,
Courtney Rippy
City Planner
Page 3
On sheet Z2, elevations, an evergreen and a deciduous tree are illustrated in the east
elevation graphic. Sheet LS1 only shows one (1) 12" deciduous tree to the east of the new
stealth ligh tpole. Additionally,
Number: 10 Created: 8/11 /2010
[8/11/10] Per LUC 3.8.13C(4) notes that a heavy emphasis on coniferous plants for year-
round screening may be required. For any landscaping improvements, please increase the
number of evergreens and decrease the number of deciduous trees, especially
concentrating more evergreens in closer proximity to the pole for increased screening.
Department: Engineering Issue Contact: Andrew Carney
Topic: General
Number: 15 Created: 8/17/2010
[8/17/10] As stated in Conceptual Review, this project is responsible for dedicating and/or
vacating any right-of-way and/or easements that are necessary. It appears that two new
utility connects are proposed to the SE of the pad. If these connections are not in a existing
utility easement, a new utility easement will need to be dedicated via separate document to
contain these connections. Each dedication will have a TDR Fee of $250. Also, a letter of
intent will need to be obtained for each easement prior to hearing.
Department: Light & Power Issue Contact: Alan Rutz
Topic: Light & Power
Number: 12 Created: 8/16/2010
[8/16/10] The existing transformer is a 300KVa 120/208v three phase.
Number: 13 Created: 8/16/2010
(8/16/10] Development charges will apply. Contact Alan Rutz at Light and Power. 970-224-
6153
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 19 Created: 8/18/2010
PFA has no comments or concerns at this time.
Department: Technical Services Issue Contact: Jeff County
Topic: General
Number: 16 Created: 8/17/2010
[8/17/10] Please add a legal description to the cover sheet.
Number: 17 Created: 8/17/2010
[8/17/101 There are line over text & text over text issues on plans LS, Z1 & Z2.
Number: 18 Created: 8/17/2010
[8/17/10] There appears to be a mislabeled note on sheet Z2. See redlines.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater .
Number: 14 Created: 8/17/2010
(8/17/10] Please provide a grading plan for the area being modified. Is the curb and gutter
remaining or being removed? There is existing drainage that flows along the curb and
gutter in this location.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Chris Stryker Date: 8/18/2010
Stryker Site Services/T-Mobile
P.O. Box 1558
Denver, CO 80201
Staff has reviewed your submittal for T-MOBILE DRAKE CROSSING WIRELESS
TELECOMMUINICATION FACILITY PDP - TYPE 1, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Courtney Rippy
Topic: General
Number: 1 Created: 7/30/2010
[7/30/10] Section 3.8.13 (C)(8) of the Fort Collins Land Use Code requires facilities and
equiptment to be painted to match as closely as possible the color and texture of the
surrounding built environment. Please note on your plans the color the pole is to be painted.
I would recommend a dark green color to match existing evergreens in the area and mitigate
noticeable visual impact
Number: 2 Created: 7/30/2010
[7/30/10] Section 3.2.4 (D) of the Land Use Code states that the light source should be
high pressure sodium and feature down -directional, sharp cut off luminaries so that there is
no spillage of illumination off -site. What is the proposed light source? Please provide a detail
regarding the lights on the proposed stealth light pole.
Number: 3 Created: 7/30/2010
[7/30/10] The Final Plans for review and recording must be on 24" X 36" Mylar sheets.
Number: 5 Created: 8/11/2010
[8/11/10] No information was provided relating to how the applicant has satisfied the
requirement set forth in Section 3.8.13(B) regarding possible co -location of the T-Mobile
equipment. Please provide this information.
Number: 6 Created: 8/11/2010
[8/11/10] On sheet number T1, please correct the project description calling out how many
equipment cabinets are proposed and correct the spelling of "stealth."
Topic: Landscaping
Number: 7 Created: 8/11/2010
[8/11/10] On sheet LS1, under "improvement heights," item number 6 is listed as a 6"
deciduous tree in the table yet is illustrated with an evergreen symbol. Please verify that the
tree in question is in fact an evergreen and update the plans accordingly.
Number: 8 Created: 8/11/2010
[8/11/10] On sheet LS1, please lucidly illustrate and differentiate in table and graphic format
the existing landscaping from the proposed improved landscaping.
Number: 9
Created: 8/11/2010
Page 1