HomeMy WebLinkAboutPOUDRE VALLEY PLAZA P.U.D. - FINAL - 30-95B - CORRESPONDENCE - (6)City of Fort Collins
PROJECT
COMMENT SHEET
DATE: 17 October 1995 DEPARTMENT,
PROJECT: 30-95B POUDREVALLEY PLAZA PUD - Final
PLANNER: Steve Olt
All comments must be received by: Friday, 24 October
❑ No Problems
Problems or Concerns (see below)
LA.I • ¢b S �ae.,c.l u g s
v� a cw� ca
v, vt c
AAe��te
a k �. ``? I l^ M0. q
V-- cCk V&,M
SL\,41a�S
Date: l 1 -- sSignature: e _
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS: ❑ SITE
0 AP
COMMUNITY PLANNING and
ENVIRONMENTAL SERVICES... 281 NORTH COLLEGE, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
CURRENT PLANNING DEPARTMENT
n'
Please contact me at 221-6750 if you have questions or concerns related to these comments. I would
like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments.
Sincerely,
Steve Olt
Project Planner
xc: Kerrie Ashbeck
Advance Planning
Stormwater Utility
Transportation
Shields Street Investors, LLC
RBD Engineers
Dana Lockwood
file/Project Planner
10. More design is needed for the Shields Street and Horsetooth Road widenings.
11. There is no construction phasing shown on the utility plans. The phasing will need to be
pinned down.
12. A letter of agreement from Chism Homes, for off -site drainage requirements, is needed and
must be provided by the revision due date (November 29th).
13. An updated SWMM Model must be provided by the revision due date (November 29th).
14. Trash enclosure details should be provided. Additional screening should be provided for the
enclosures, especially the one at the southeast corner of Pad 'G.
15. The pedestrian area along the south side of the development looks less than desirable.
Attached sidewalk close to the parking areas, little landscaping.
16. The building (architectural) intent throughout the center should be clarified. Note 12 on the
Site Plan is a little vague.
17. The pedestrian circulation map is still being reviewed. Could there/should there be an east -
west route midpoint in the center, between Pads F and B'?
18. A copy of the comments received from the Stormwater Utility is enclosed with this letter.
This completes the review comments at this time. Additional comments will be forthcoming as they
are received from the various departments and reviewing agencies that are reviewing this request.
Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the
December 18, 1995 Planning and Zoning Board hearing:
******************************************************************************
Plan revisions are due no later than the end of the working day, November 29, 1995. Please
contact me for the number of folded revisions required for each document.
PMrs, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board
packets) are due on December 11, 1995.
******************************************************************************
r, I e
3. The Zoning Department has offered the following comments:
a. The 45 degree parking on Pad 'A' requires a 20' driveway flow width (15' is shown).
The stall lengths need only to be 20' (25' is shown).
b. Pad,'G parking garage units require a minimum of 30' between garage doors and the
curbline (20' is shown). Recent experience shows cars cannot negotiate adequately
(the Parking Lot Development Guide is in the process of being updated).
C. You may want to make the driveway flow direction on the south side of Pad 'G only
one way to solve the aforementioned concern.
d. Show ramped curbs for handicapped access with an "R" on the Site Plan.
e. What about loading zones/service areas? Where are they proposed to be?
f. Nice elevations - "Beverly Hills Tradition". Californians should love it!!!
4. A copy of the comments received from the Building Inspection Department is enclosed
with this letter.
5. The Poudre Fire Authority has offered the following comments:
a. Six of the buildings exceed 5,000 square feet in size and must be fire contained or
equipped with an approved automatic fire sprinkler system.
b. Fire hydrants as shown meet fire flow requirements.
C. Emergency access is "OK" as shown.
6. Comments from the Water/Wastewater Department are being forwarded to RBD
Engineers on a red -lined set of utility plans and to Jim Sell Design on a red -lined Landscape
Plan.
7. Tim Buchanan, the City Forester, has stated that Summit Ash and Ginnala Maple are not
good choices as plant species.
8. A copy of the comments received from the Engineering Department is enclosed with this
letter.
9. The streetscape along Arbor Avenue looks like a narrow attached sidewalk along a row of
garage doors and parking. The intent should not be for mixed uses pulled up to streets. More
screening is necessary. The building elevations for Pad'G will be critical. This is a row of
garages facing, and very close, to the street.
Commu 1 Planning and Environmental
Current Planning
City of Fort Collins
November 5, 1995
Jim Sell
Jim Sell Design, Inc.
117 East Mountain Avenue
Fort Collins, CO. 80524
Dear Jim,
.vices
Staff has reviewed your documents for the Poudre Valley Plaza P.U.D. - Final that were submitted
on October 16, 1995, and would like to offer the following comments:
1. U.S West has stated that they have the same comments as for the preliminary P.U.D. request,
dated 6/22/95. A copy of those comments is enclosed with this letter.
2. The Mapping/Surveying Department has offered the following comments:
a. The subdivision plat needs a control monument east of the northwest corner of
Section 35.
b. Some of the outer boundary monuments are not described.
C. What are the two angled lines in the 10' utility easements on the south side of Lot 1
(see enclosed red -lined plat forwarded to RBD Engineers)?
d. The internal easements need bearings to define their locations.
e. Arbor Avenue on this new plat should be named.
f. Easements along Century Drive should be labeled like the ones along Shields Street
... would be easier to understand.
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 TDD (970) 224-6002