Loading...
HomeMy WebLinkAboutPOUDRE VALLEY PLAZA P.U.D. - FINAL - 30-95B - CORRESPONDENCE - (5)9. The following revisions have been incorporated into the revised plans to improve the streetscape" along Arbor Avenue: a.The parking lot southeast of pad ."C" has been revised to include a five. foot planting strip for shrubbery. between the parking lot: and 66utility easement. b. Shrubbery plantings have been added in.the R.O. W.• opposite pad : " G Maintenance of these plantings will be the responsibility of the, developer: . c. Landscaping'has been added,around the trash enclosure near pad "G 10. See forthcoming drawings'from ,RBD, -Inc. 11. ' No pliasing is intended for'infrastructure improvements." 12. A copy of the letter of agreement front Chism 'Homes for off -site' drainage improvements is enclosed with this submittal. 13. See forthcoming submittal documents from•RBD, Inca 14. Design and details for the trash'enclosures will be provided with future building plans. Enclosure. . screens, will equal and- match the materials used in the"planned buildings.' The same materials of construction and colors used for the buildings will be repeated in the design of all trash enclosures: ' 15. Additional landscaping has been added to enhance 'the streetscape along Arbor Avenue (see comment 9 above).. 16. ' Note,12 on the Site Plan has been revised as follows in•orderao clarify.the architectural intent 'throughout the projects: . The architectural character as determined for pads "E" &• "F" is intended to establish the architectural theme throughout the ,project. 'Future buildings shall be architecturally •. compatible with this theme. Some variations in form should.be,expected. Same materials of construction and 'colors will be used throughout the project ' All" roofs will match in material and color. 17. No comment required in regard to the pedestrian: circulation map -submitted earlier: ' However, please note in the "revised final site. plan _and landscape plan that a,pedestrian route between' pad "E" and "B" has been incorporated into the plan:: This route has been achieved by a redesign of the parking lots'located south of the east -west drive between pads "E" & "F F. 18. See forthcoming comments from RBD, Inc: Please call me if youhaveany questions. Sincerely, ' JIM SE DESIGN INC. 'Thomas W. Kehler Project Manger TWK/kms.. enc. c: Fred Croci, Shields Street investors, LLC . Dana Lockwood, Architect • , RBD Engineers Inc: Paget oft - - "CAWPDOCSTROJECPSU 645\SBMM- November 29, 1995 ' November 29;1995 :. ,Sell WEE lm Steve Olt, Project Manager q�tlitect� 'City of Ft: Collins, Planning 281 •N College -Ave., PO Box 580 Fort Collins, CO 80524 y'= Dear Steve, Submitted herewith, are the revisions for;the Poudre Valley Plaza P.U.D. Final documents that - were submitted'on October 16, 1995. The enclosed revised drawings -of the. Final Site Plan, and' Final Landscape Plan incorporate City comments, in accordance with your letter dated ' November 5; ,1995.. The drawings ,have a" revision date of _November 29,. 1995 Also r enclosed, per your request, are two folded 'sets of" the architectural drawings by' Dana Lockwood. Revisions to the Final Subdivision Plant, Final Utility Plans, and other engineering documents will be submitted within a4ew"days by RBD, .Inc. per their -discussions with the City's Engineering Department. The following is'our response to your comments of November5, 1995: 1. The concerns raised by US West "are not viewed as; being problematic: - Provisions in buildings to ,accommodate the needs of US. West will be worked out when each building is designed. 2. See forthcoming comments from RBD; Inc. 3a, b; & c . Regarding the 45 degree parking on pad "A", the parallel- parking has been removed opposite the 45 degree parking which will increase the driveway aisle width to 23' 3d. Ramped curbs for handicapped access have been noted with an "R"• on the Site Plan. 3e: - The following note has been added to the Site Plan: All loading and service will be. from -the primary building entries during non -peak business hours.." ..4. The site will be accessible to persons with disabilities in accordance with the Uniform Building' Code Section 3103 and UBC "Appendix .Section 3106. Regarding handicapper accessibility of the residential units, Sharon Getz has - •confirmed that seven units or less does not require handicapper accessibility. 5. Buildings will be .designed to meet the requirements of the. Poudre Fire -Authority. 6 Red -lined notes. on LandscapePlan from .Water/Wastewater Departments have been'added to the Final Landscape Plan. See forthcoming comments , . from RBD, Inc. regarding comments on red -lined set of utility plans. 7. Summit Ash has been changed to Marshall Ash and Ginnala Maple has been changed to Mayday •Tree, Shadblow Serviceberry and Thornless Cockspur ' Hawthorn. 8. :See forthcoming comments from RBD, Inca In addition, a landscape plan .,and irrigation plan for the future traffic island in South Shields Street will be furnished to the City once the engineering design is complete. Construction documents for these improvements. will be submittedwith final engineering documents:. FOrl, �k f,Cy� r?"� Ave . Page 1 of2 C:\WPDOCS\PROJECTS\1645VS8M�t'�'FPIq( - - _ . (303)C Oyu' -1921