Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
Attachments
March 2, 2004 Letter from Terracon
January 16, 2002 Letter from Terracon responding to Geotechnical Comments
Responses from Wolff -Lyon Architects
Copies of agreement forms for Burlington Northern Railroad
Copy of final plat for Martinez P.U.D. (recorded)
Page 14
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
162. "Created: 121612001. The thrust block on the fire hydrant on Mason Court will not have
undisturbed earth behind it; therefore, restrain all joints between hydrant and the 12x12x8
tee on the east side of Mason Court. Can hydrant be placed on east side of Mason Court?
R. Acknowledged: The joints between hydrant and the 12x12x8 tee on the east side of Mason
Court will be restrained with mega lugs.
163. "Created: 121612001. Maintain 5 foot separation between raised planter boxes and water
service/meter pits. "
R. Acknowledged: The planter box has been reconfigured to enclose the water service/meter
pit near Building B.
164. "Created: 121612001. See additional comments on plans. "
R. Acknowledged: The additional comments have been revised on the current set of Final
Utility Plans.
If you have any questions, please call me at (970) 226-5334.
Sincerely,
Seth W. Tourney, E.I.
Shear Engineering Corporation
SWT/BWS
cc: Jim Leach; Wonderland Hill Development Company
Mickey Willis, Paradigm Realty
Korkut Onaran; Wolff - Lyon Architects
Mike Lang; Sear Brown Group
Katie Moore; City of Fort Collins Engineering
Wes Lamarque; City of Fort Collins Stormwater Utility
Jeff Hill; City of Fort Collins Water Wastewater
Craig Foreman; City of Fort Collins Parks and Rec.
Ron Gonzales; Poudre Fire Authority
Page 13
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
150. "Created: 1113012001. Lower storm sewer in order to allow water main to cross above
storm sewer and to prevent a lowering of water main. "
R. Acknowledged: Done.
151. "Created: 1113012001. Provide appropriate scales for all plan and profile views. "
R. Acknowledged: Done.
Water Wastewater Issue Contact: Roger Buffington
Topic: Utility Plans
157. "Created: 121612001. Plan sheet 13 includes details which appear to be for a subdrain. Is
there a subdrain on the project? What is this detail to be used for? "
R. Notes have been added to these details for clarity.
158. "Created: 121612001. Plan sheet 13 includes a manhole base detail that is not a City
standard detail. What is this detail to be used for? "
R. Please refer to Item 5 on the Master Improvements Plan.
159. "Created: 121612001. Re -align the water main at the SE corner of the building. "
R. Acknowledged: Done.
160. "Created: 121612001. Move 6-inch water line on NW side of building into the drive as
noted on the plans. "
R. Acknowledged: Done.
161. "Created: 121612001. What is the elevation of the abandoned 36-inch storm sewer in
Cherry Street at the point of crossing with the 8-inch water main? If there is a conflict,
remove abandoned storm sewer 5 feet each side of water main and plug ends of storm
sewer with concrete. "
R. There is not a conflict between the 36-inch storm sewer and the 8-inch water main. The
water main is well above the storm sewer. See Sheet 3 of the Final Utility Plans for
elevations here.
Page 12
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
166. "Created: 1211012001. Please provide calculation & cross-section for area just west of
Building C to verify 100 year flows will turn corner and not inundate the underground
parking. See drainage plan. "
R. Acknowledged: The 100-year flow will turn this corner. Please refer to Flow Tram West of
Building C in Appendix I of the Final Drainage and Erosion Control Report.
167. "Created: 1211012001. Please provide an outfall for the sub -basin south of the railroad
tracks. The parking lot drains to the east along the south side of the railroad tracks to a
low lying area. With some regrading to the south of the railroad tracks and the inlet in sub -
basin 1 d enlarged, flows from the south parking lot may be able to dump into the box
culvert at this inlet. "
R. Acknowledged: Done. An inlet is now proposed for this area south of the railroad tracks.
Water Wastewater Issue Contact: Jeff Hill
Topic: General
146. "Created: 1113012001. Place all water and sewer mains in roadways/drives when
possible. "
R. Acknowledged: Done.
147. "Created: 1113012001. Provide elevation views for buildings 'A' and 'B' for our review.
All individual buildings must provide their own services. "
R. Acknowledged: After coordinating with Wolff -Lyon Architects, it is our understanding that
they will be providing these drawings.
148. "Created: 1113012001. Eliminate all unnecessary water line fittings when possible. "
R. Acknowledged: Done.
149. "Created: 1113012001. Show all proposed water and sewer services on the overall utility
plans ( including proposed irrigations taps). "
R. Acknowledged: Done.
Page 11
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
113. "Created: 1112012001. Please provide identifier for benchmarks. (repeat comment) "
R. Acknowledged: The benchmarks have been revised to reflect the City of Fort Collins
Vertical Control aluminum caps.
114. "Created: 1112012001. Please provide a P.E. signature and stamp for next submitted
reports. "
R. Acknowledged: Done.
115. "Created: 1112012001. Erosion Control Comments:"
R. Acknowledged:
"Please provide calculations"
R. Acknowledged: Done.
"The BMP's noted in the report are not translated to the plan well or are not shown on the
plan —please correct. "
R. Acknowledged: Done.
116. "Created: 1112012001. Please revise QI00 values in the plans and report. Incorrect
intensity was used for all QI00 calculations. Incorrect intensities were also used to
calculate the Q2 but the error was on the conservative side. "
R. Acknowledged: Done.
Topic: Drainage
165. "Created: 1211012001. The proposed 48-inch storm sewer near Building C is within a few
feet of the building. Please investigate whether or not the waterline could be relocated
farther south, thus allowing for the storm sewer to be moved at least 10 feet from the
building. See Sheet 6. This may require an easement within the railroad easement. If this is
not possible, an alternative would be to use water tight pipe like DIP, for the area in front
of Building C. "
R. The plans have been revised to use Ductile Iron Pipe (DIP) for this stretch of storm sewer.
Page 10
E
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
156. "Created: 121512001. Please use phantom lines for existing features so that a
differentiation can be made between what is existing and what is proposed. (This applies to
all sheets) "
R. Acknowledged: Done.
168. "Created: 1211212001. Please note that under the variance for parking setbacks along
Mason Court, a minimum of 20' must be maintained. Please configure parking to meet this
requirement. "
R. Acknowledged: Done.
Topic: Utility Plans
48. "Created: 91412001. Please provide more information regarding the median shown in
Cherry. Grading information and cross-section(s) are needed. It is assumed that the
developer will build it. If landscaping is proposed, please include a line for irrigation, and
know that it will be the responsibility of the developer to maintain the landscaping. The
median should be enlarged to provide adequate visibility, but not encroach on left turn
stacking lengths at either Mason or Howes or the movement of turning buses off of Mason
onto Cherry. The design should also take into consideration that Howes will most likely be
a 2-way street in the future. The ends should also be made less blunt. It has also been
suggested that this would be a good place for art in public places. "
R. Acknowledged: The plans provided more information regarding the median shown in
Cherry Street. No irrigated landscape is being proposed for this median.
144. "Created: 1112912001. The design and construction of the median in Cherry needs to be
completed with this project. Please re -include the median in this plan set. Construction of
the median will most likely be required by the time of Certificate of Occupancy for the
buildings. "
R. Acknowledged.
Stormwater Utility Issue Contact: Wes Lemarque
112. "Created: 1112012001. Please provide Swale cross -sections and calculations for all swales.
(repeat comment)"
R. Acknowledged: Done.
Page 9
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
Topic: Site Plan
30. "Created: 91412001. Please match easements with Utility plan and Plat."
R. Acknowledged: Done.
36. "Created: 91412001. Please see plan for additional comments."
R. Acknowledged.
41. "Created: 91412001. Please show all ramps."
R. Acknowledged: Done.
123. "Created: 1112312001. There are still areas where the 6' minimum sidewalk width is not
being met where cars overhang the sidewalk. "
R. Acknowledged: The sidewalk widths have been adjust to a 6' minimum where cars could
overhang the sidewalk.
124. "Created: 1112312001. There is inadequate backing distance behind the westernmost
garage south of the railroad tracks. "
R. Acknowledged: The pavement has been extended to provide adequate backing distance.
126. "Created: 1112312001. Where is the public access easement(s) for the area south of the RR
tracks? "
R. Acknowledged: Public access easements for the area south of the railroad tracks will be
proposed on the plat upon availability.
127. "Created: 1112312001. The utility easement along the south side of Mason Court should be
9 feet per LCUASS figure 7-9F. Please provide this width. "
R. There has been a variance approved by the City Engineer to accommodate this issue. Please
refer to the attached letter from Katie Moore dated l 2/21 /2001.
128. "Created: 1112312001. Please note that for the certain portion of building A that crosses
over the electric easement, that the easement has been vacated above a certain elevation
and that portion of the building is permissible there. "
R. Acknowledged.
Page 8
M
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
65. "Created: 91512001. Please label in writing that all driveways are concrete to the ROW"
R. This label is provided on the .Larimer County Urban Area Street Standard Drawing 7-29A
Standard Driveway approach (Types I & II), which is included in the Final Utility Plans.
134. "Created: 1112312001. Where are the sight distance easements? "
R. The sight distance easements can be found on the site plan prepared by Wolff -Lyon
Architects, and the sight distance easements can be found on Sheet 3 in the Final Utility
plans.
135. "Created: 1112312001. Please show striping on Cherry Street. (repeat) "
R. Acknowledged: Done.
136. "Created: 1112312001. It appears that an offsite easement is needed for work to be done to
the west of the property just north of Cherry. "
R. Plans have been revised to keep all construction within the boundaries of this property.
However, it should be noted that the same interested parties own the adjacent property.
Topic: Sheet 4
69. "Created: 91512001. Regarding general note 6: All easements should be shown on the
utility plans. "
R. Acknowledged: Done.
Topic: Sheet 5
137. "Created: 1112312001. Where is MH A-1 shown on the plan view of the sanitary sewer? "
R. MH A-1 was previously mislabeled in the profile view, and this has been revised to MH A-
3.
Topic: Sheet 6
138. "Created: 1112312001. Please show the street cut to be made on Cherry. "
R. Acknowledged: Done. Please refer to the Master Improvements Plan.
Page 7
n
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
119. "Created: 1112312001. Please include a legal description of the height limitation on the
Light and Power easement as it passes underneath the building. "
R. Please refer to response by Wolff -Lyon Architects attached with this letter.
120. "Created: 1112312001. Please verify that the gas company and light and power are
amenable to the areas where their exclusive easements are infringed upon. "
R. Acknowledged: After coordination with Janet .McTagg in the light and power department,
she acknowledged the manhole near Building A within a portion of their easement. She
stated that this would be fine, and she agreed to contact Katie Moore to verify their
approval.
121. "Created: 1112312001. Please provide a line for the Railroad to sign on."
R. When we were designing Martinez P.U.D., the railroad did not request a signature on the
final plat. To maintain consistency with past formats between this Final Plat and the
Martinez P.U.D. final plat, a railroad signature block will not be provided on this final plat.
This was confirmed with the railroad. Agreements are currently being coordinated with the
Burlington Norther Santa Fe Railroad through Staubach Global Services. The agreements
will be provided to you immediately upon execution of those agreements. Refer to copies
of the agreements attached with this response for your immediate reference.
Topic: Sheet 3
56. "Created: 91512001. Please use phantom lines for existing features/buildings adjacent to
site. "
R. Acknowledged: Done.
61. "Created: 91512001. Please calculate sight distance easements needed using figure 7-16
(LCUASS) and show on the plat and utilityplans and site and landscape plans. "
R. Acknowledged: Done.
62. "Created: 91512001. Drainage is not allowed over public sidewalks (7.7.4 and 9.4.11 A &
B, LCUASS). Please use under -walk pans as shown in detail 7-31. "
R. Acknowledged: Done.
Page 6
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
122. "Created: 1112312001. The building outlines/footprints don't seem to match from the Site
plan to the landscape plan. "
R. Acknowledged: Done. These have been corrected to match.
Topic: Plat
42. "Created: 91412001. Please correct wording as redlined and add Sight Distance Easement
language. "
R. Acknowledged: This will be provided upon availability.
44. "Created: 91412001. Please clearly label all existing and proposed easements and ROW."
R. Acknowledged: This will be provided upon availability.
45. "Created: 91412001. Please label all adjoining properties. "
R. Acknowledged: This will be provided upon availability.
46. "Created: 91412001. These easements do not match what is shown on the site plan. Please
coordinate. "
R. Acknowledged: This will be provided upon availability.
47. "Created: 91412001. Please see plat for additional comments."
R. Acknowledged.
117. "Created: 1112312001. Please dedicate a 9' utility easement along Mason Court as shown
in LCUASS Figure 7-9F. "
R. Please refer to response by Wolff -Lyon Architects attached with this letter. Also, note that
this easement has been granted a variance to 8' in a letter from Katie Moore dated
December 31, 2001.
118. "Created: 1112312001. Please add a note to the cover sheet referring to the vacation of old
easements if they are not shown on this plat (repeat). "
R. Acknowledged: This will be provided upon availability.
Page 5
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
R. Acknowledged: Mickey Willis has been coordinating with Craig Foreman of the parks
department. Parks Department approvals on the Final Utility Plans will reflect their
approvals of work performed on park property.
139. "Created: 1112312001. Please provide a detail of the retaining wall. "
R. Acknowledged: Done. There are two (2) retaining wall details represented on the plans.
The "Ready Rock" retaining wall detail is for the retaining wall required on the north side
of the new parking spaces on the north side of the existing private drive. The other
retaining wall detail is for the drive into the underground parking for Building C.
140. "What is the elevation of the basement floor? (repeat) "
R. The basement floor elevation in Building C is 4907.17 ft. This elevation is shown in the
Final Utility Plans now.
154. "Created: 121512001. Presently, new grading is shown under the railroad tracks. Shouldn't
that be adjusted so that the tracks are not affected?"
R. Acknowledged: Done.
Topic: Landscape Plan
37. "Created: 91412001. Please match with other plans/plat. "
R. Acknowledged: Done.
38. "Created: 91412001. Landscaping in median in bulb of cul-de-sac needs to meet Sight
distance easement restrictions. Please see the attached form for restrictions and include
these restrictions on both the landscape plan and the plat. "
R. Acknowledged: Sight distance easement restrictions have been added.
39. "Created: 91412001. Further sight distance easement areas should be identified for the next
submittal. Please note that landscaping in these areas needs to meet the restrictions as
well. See LCUASS Drawing 7-16 for calculation of sight distance easements. The 110'
shown is inadequate. "
R. Acknowledged: Done.
Page 4
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
142. "Created: 1112312001. No design has been shown for the subdrains needed for building C
per the soils report. Please show how subdrains will tie into an approved discharge
facility. "
R. Acknowledged: A 12" RCP is being provided from the basement of Building C and
discharging into the water quality pond system on parks land to the north of the property.
This will exist within the drainage easement on park's land. This was coordinated with the
actual building design. Subdrains for the actual building will be designed with the building
and incorporated with the building plans.
143. "Created: 1112912001. The driveway between buildings A and B may be 18' in width; the
driveway between buildings B and C may be 22' in width, and the driveway access off of
Cherry must be a minimum of 24' in width per the Variance Request approvals and
denials. "
R. Acknowledged: Done.
145. "Created: 1112912001. The comments numbered lower than 117 are repeat comments. "
R. Acknowledged: The comments numbered lower than 117 are being accommodated on an
item -by -item basis.
152. "Created: 1113012001. Please refer to the redlined utility plan checklist for further
comments. "
R. Acknowledged.
Topic: Geotechnical Report
153. "Created: 1113012001. Subsurface report does not address issues as outlined in
LCUASS 5.6"
R. Please see the attached letter from Terracon dated March 2, 200i' and response letter dated
January 16, 2002.
Topic: Grading
75. "Created: 91512001. Offsite grading/other work performed on Parks' land requires their
approval. Please provide a letter from the Parks department stating their approval of what
is shown on their property. "
Page 3
March 24, 2004
Project No: 1558-02-01
Re: Responses to Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
133. "Created: 1112312001. Please provide a signature line for the railroad. "
R. When we were designing Martinez P.U.D., the railroad did not request a signature on the
final utility plan set. To maintain consistency with past formats between these Final Utility
Plans and the Martinez P.U.D. final utility plans a railroad signature block will not be
provided on this plan set. This was confirmed with the railroad. Agreements are currently
being coordinated with the Burlington Northern Santa Fe Railroad through Staubach
Global Services. The agreements will be provided to you immediately upon execution of
those agreements. Refer to copies of the agreements attached with this response for your
immediate reference.
Topic: Drainage
155. "Created: 121512001. Please provide a legal description and sketch of the required
drainage area on Parks' land. These will be used to file a Notice of Facility Location in
lieu of an Easement. "
R. A drainage easement on the park's property to the north was recorded under separate
document according to the recorded plat for Martinez P.U.D. Please refer to the copy of the
recorded final plat of Martinez P.U.D. attached for your immediate reference. The same
easement will be identified on the final plat for Mason Street North as well.
Topic: General
54. "Created: 91512001. Please see sheet for any additional comments"
R. Acknowledged.
74. "Created: 91512001. Any work done within the RR ROW/easement requires approval by the
railroad. Please provide a letter of intent from the Railroad regarding these improvements
(grading, landscaping, pedestrian crossing, etc.). "
R. Acknowledged: Coordination with Gene Biddle with Staubach Global Services
representing the Burlington Northern Same Fe Railroad is currently underway to achieve
approvals from the BNSF. Agreements are currently being coordinated. The agreements
will be provided to you immediately upon execution of those agreements. Refer to copies
of the agreements attached with this response for your immediate reference.
141. "Created: 1112312001. Please provide the under -walk drain detail from LCUASS. "
R. Acknowledged: Done.
Page 2
March 24, 2004
Project No: 1558-02-01
City of Fort Collins Planning
P.O. Box 580
Ft. Collins, Colorado 80524
Attn: Steve Olt
Re: Responses to Staff Project Review Comments Dated 02/25/04
Mason Street North; Ft. Collins, Colorado
Previously Lot 12 and Tract A, Martinez P.U.D.
Dear Mr. Olt,
This letter provides responses to review comments concerning Staff Project Review for Mason
Street North (Major Amendment to Martinez P.U.D.), #4-97B dated February 25, 2004, even
though many of these comments are from 2001. The Final Utility Plans, Final Plat, and Final
Drainage and Erosion Control Report redlines have been addressed with this resubmittal. The
responses follow the numbering order presented in the summaries.
Engineering Issue Contact: Katie Moore
Topic: Cover sheet
55. "Created: 91512001. Please correct general notes as shown."
R. Acknowledged: Done.
130. "Created: 1112312001. Please list the Developer and Owner of this project. (repeat) "
R. Acknowledged: Done.
131. "Created: 1112312001. Please lighten the vicinity map so that it is legible/reproducible. "
R. Acknowledged: Done.
132. "Created: 1112312001. Please show the indemnification statement separately from the
signature block and include only on the cover sheet. "
R. Acknowledged: The indemnification statement has been separated from the signature block
and is only included on the cover sheet.