Loading...
HomeMy WebLinkAboutMASON ST. NORTH, MAJOR AMEND. - FDP - 4-97C - CORRESPONDENCE - (20)22. "[4/27/04] Repeat comment. Previous comment: Provide fire flow calculations for this project as well as the existing fire f low required for Martinez PUD. " R. See engineering Responses by Shear Engineering 149. "[427/04] Show all proposed water and sewer services on the overall utility plans (including proposed irrigation taps). " R. See engineering Responses by Shear Engineering 180. "[427/04] Electric lines may not pass between the curb stops and meter pits. Maintain a 4' minimum separation between curb stop/meter pit and electric mains. " R. See engineering Responses by Shear Engineering 181. "[427/04] Please correct the master utility plan notes to reflect the information provided on the master utility plan. See site, landscape and utility plans for other comments. " R. See engineering Responses by Shear Engineering Sincerely, Ronnie Pelusio Wolff -Lyon Architects cc: Jim Leach; Wonderland Hill Development Company Mickey Willis; Paradigm Realty Brian Shear; Shear Engineering Mike Lang; Sear Brown Group Katie Moore; City of Fort Collins Engineering Wes Lamarque; City of Fort Collins Stormwater Utility Jeff Hill; City of Fort Collins Water Wastewater Craig Foreman; City of Fort Collins Parks and Rec. Ron Gonzales; Poudre Fire Authority 190. "Created: 413012004. Please discuss in the text of the report how the water quality pond operates with the existing outlet structure. " R. See engineering Responses by Shear Engineering Transportation Planning Issue Contact: Tom Reiff Topic: General 179. "[4/27/04] Project looks good to go! No comments. " R. See engineering Responses by Shear Engineering Water Wastewater Issue Contact: Roger Topic: Utility Plans 162. "[4/27104] Repeat comment: If hydrant restrained, show restrained length on the plans and provide restrained length calculations. The thrust block on the fire hydrant on Mason Court will not have undistributed earth behind it; therefore, restrain all joints between hydrant and the 12x12x8 tee on the east side of Mason Court. Can hydrant be placed on east side of Mason Court?" R. See engineering Responses by Shear Engineering Water Wastewater Issue Contact: Jeff Hill Topic: Landscape Plan 18. "[4/27/041 Repeat comment. Previous Comment: Show all water and sewer lines on the landscape plans and provide the required landscape/utility separation distances. " R. Water and sewer lines are shown on the landscape plans and the appropriate landscape utility separations have been followed. Topic: Utility Plans 19. "[4/27/041 Repeat comment. Previous comment: Maintain 10 feet of separation between water mains and their associated appurtenances and all other underground utilities. " R. See engineering Responses by Shear Engineering 21. "[4/27/04] Repeat comment. Previous comment: Clearly define all abandonment's and relocations of existing water/sewer lines (include note to coordinate abandonment's with city utilities). " R. See engineering Responses by Shear Engineering A meeting may be warranted. Please provide an emergency overflow swale for the Howes Street Outfall at Cherry Street and provide calculations to show that no buildings will be inundated. " R. See engineering Responses by Shear Engineering 113. "[41301041 Please explain where the identifiers came from. They are not in our inventory. Please provide identifier for benchmarks. (repeat comment)" R. See engineering Responses by Shear Engineering Topic: Drainage 184. "Created: 41302004. The previously abandoned 48-inch storm sewer will need to be certified as if it were a new storm drain. This will be done with the rest of the drainage certification for the site. An inspection of the pipe before plan approval is recommended to be sure that the pipe is still in good condition. City camera crews may be able to assist you in accomplishing this. " R. See engineering Responses by Shear Engineering 185. "Created: 41302004. The drainage report needs to reference the current Old Town Drainage Master Plan. Any updates within the new master plan need to be incorporated into the current design for the site. " R. See engineering Responses by Shear Engineering 186. "Created: 41302004. Please add a water quality summary table to the water quality pond grading plan. " R. See engineering Responses by Shear Engineering 187. "Created.• 41302004. Please design and show the outfall for the existing 48-inch storm sewer that will be put back into service. The outlet needs to direct the flow to the water quality pond. R. See engineering Responses by Shear Engineering 188. "Created: 41302004. Please see comments about flow turning around west building on the plans and in the report. There does not seem to be enough capacity in the drive far the flow. " R. See engineering Responses by Shear Engineering 189. "Created: 41302004. Please revise water quality volume calculation. See drainage report. " R. See engineering Responses by Shear Engineering R. A note has been added to both the site and landscape plans, which states "Any building outline shown over an easement meets the restrictions stated in the plat." 156. "[4/26104] Repeat: Please use phantom lines for existing features so that a differentiation can be made between what is existing and what is proposed. " R. Understood: The existing and proposed line weights have been adjusted. All curbs are shown dark for the purpose of graphic clarity as requested in the city checklist. 173. "[4/26104] Please review the current scanning requirements in LCUASS Appendix E for plans and revise font sizes/shading/etc. accordingly. Please call Technical Services at 221-6605 if you have questions. " R. All text has been updated to meet the current scanning requirements in LCUASS Appendix E. All text is 2mm or greater in size. Police Issue Contact: ,Joseph Gerdom Topic: General 183. "[4/28/04] Lighting requirement for parking is 1.Ofc. " R. See engineering Responses by Shear Engineering Topic: Landscape Plan 182. "[4128104] Have there been any changes to original (8113101) landscape plan? Could affect lighting and security. " R. The current landscape plan does not affect previous lighting and security solutions. Stormwater Utility Issue Contact: Wes Lamaraue 15. "[4130104] Please also provide a drainage easement (alignment in this case due to property being owned by the City) for the full extent of the water quality pond within the park. " R. See engineering Responses by Shear Engineering 90. "[4130104] Please provide more information regarding the Howes Street Outfall overflow. If the inlets were completely plugged and the total 491 cfs were to spill, where would the flow go and what would the water elevation be? If the buildings F.F. elevation were slightly higher than the crest on Cherry Street, which they are close now, than this issue might be a lot simpler to resolve. Flood proofing the buildings is also another option. Also, please provide a statement on the plans stating how the City will be held harmless in the event any flooding does occur within the development. This area was never planned to have structures located on it and the drainage easement has been reduced to 40 feet. R. Understood: The existing and proposed line weights have been adjusted. All curbs are shown dark for the purpose of graphic clarity as requested in the city checklist. 61. "[04126/041 The easements shown still do not meet requirements. Drivers at driveways/intersections should be able to look left and right and see vehicles at the distance required in LCUASS. Please revise. Original comment: Please calculate sight distance easements needed using figure 7-16 (LCUASS) and show on the plat and utility plans and site and landscape plans. " R. See engineering Responses by Shear Engineering 62. "[04126/041 Under -walk drains were added to all driveways except the driveway on the northwest of the court, and it has the most water draining over the sidewalk. Please revise. Original comment: Drainage is not allowed over public sidewalks (7.7.4 and 9.4.11 A & B, LCUASS). Please use under -walk pans as shown in detail 7-31. " R. See engineering Responses by Shear Engineering 135. "[0426/04] The north bike lane stripe is missing, and more information regarding striping should be shown to address the addition of the median and changes to the left turn lane west of the median. Original comment: Please show striping on Cherry Street. (repeat). " R. See engineering Responses by Shear Engineering Topic: Sheet 6 138. "[0426/04] Street cuts need to be made to the edge of the bike lane, the edge of a car lane, or the middle of a car lane. Where is the proposed cut in relation to any of these? Original comment: Please show the street cut to be made on Cherry. " R. See engineering Responses by Shear Engineering Topic: Site Plan 36. "[41261041 Repeat: Please see plan for additional comments. " R. Noted. 41. "[426/041 Repeat: Please show all ramps." R. All ramps have been shown and are labeled. 128. "[426/041 Repeat: Please note that for the certain portion of building A that crosses over the electric easement, that the easement has been vacated above a certain elevation and that portion of the building is permissible there. " 4 R. See engineering Responses by Shear Engineering Topic: Plat 46. "[04/26/04] Repeat: These easements do not match what is shown on the site plan. Please coordinate. " R. Acknowledged: The easements are consistent throughout the plan set. 47. "[04/26/04] Repeat: Please see plat for additional comments." R. See engineering Responses by Shear Engineering 119. "[0426/04] Repeat: Please re -word this limitation as redlined. Original comment: Please include a legal description of the height limitation on the Light and Power easement as it passes underneath the building. " R. See engineering Responses by Shear Engineering. 121. "[041261041 I believe the RR signature line on the plat was not required only if new easements crossing the RR easement were removed from the plat. Original comment: Please provide a line for the Railroad to sign on. " R. See engineering Responses by Shear Engineering 170. "[04/26/04] Please include the triangular area of what was formerly Parks' property within this plat. This was a condition of approval of the project and must be met. " R. See engineering Responses by Shear Engineering 171. "[04/26/04] Additional language is needed regarding Tract A's maintenance and ownership. I thought this had been worked out years ago, but cannot find a copy of what had been agreed upon. Please contact Parks/Real Estate/City Attorney (Carrie Daggett) regarding this topic. R. See engineering Responses by Shear Engineering 172. "[0426/04] Please provide signature lines for the gas company and light and power." R. See engineering Responses by Shear Engineering Topic: Sheet 3 56. "[0426/04] There are still existing items being shown with dark line weights making them look to be proposed instead of existing (i.e. the sidewalk on Cherry). Please revise. Original comment: Please use phantom lines for existing features/buildings adjacent to site. " .3 39. "[0426/04] Your engineer needs to calculate the sight distance easements required per LCUASS, then these easements should be shown on all plans, including the restriction language on the plat and the landscape plan. The little cars and lines shown on the plans meet no standard that I can find in LCUASS. Original comment: Further sight distance easement areas should be identified for the next submittal. Please note that landscaping in these areas needs to meet the restrictions as well. See LCUASS Drawing 7-16 for calculation of sight distance easements. The 110' shown is inadequate. " R. Acknowledged: These site distance easements have been calculated by Shear Engineering Corporation and were coordinated with Wolff -Lyon Architects. 122. "[04/26/04] The building outlines/envelopes should include all arcades and second -floor balconies/overhangs/eaves/etc, and should match on both the site and landscape plans. They still don't appear to match. Original comment: The building outlines/footprints don't seem to match from the Site plan to the landscape plan. " R. The building outlines/envelopes have been updated to include all arcades and second -floor balconies/overhangs/eaves. The outlines/envelopes currently match on both the site and landscape plans. Topic: Median 174. "[04126104] Why is the median placed off -center in the street? Looking at the striping on the street, it appears to be evenly spaced, as it should be, and the median should be placed in the middle of the street, not shifted south. Please double-check the striping shown on the plan, and provide for corrections if needed. Where is the north bike lane? How will the striping need to be changed to provide for the median and the changes in the left turn lane west of the median?" R. See engineering Responses by Shear Engineering 175. "[0426/04] The sections are mislabeled. A -A is really B-B and vice versa. " R. See engineering Responses by Shear Engineering 176. "[0426/04] The opening in the median should be 8' wide with curbs on each side. The median hardscape should be designed per LCUASS 8-05. What are the radii of the median noses? If they do not meet standards (which they don't appear to), then please revise. " R. See engineering Responses by Shear Engineering 177. "[0426/04] Please provide a minimum 4' long flat pad in the middle of the refuge per standards. " R. See engineering Responses by Shear Engineering 178. "[0426/04] There are several locations where the lip is labeled as the flowline and vice versa. Please revise. " 141. "[04126104] Standards have reverted to the use of D-10 from the stormwater manual for under - walk drains. Please use this detail (copy attached to plans). Original comment: Please provide the under -walk drain detail from LCUASS. " R. See engineering Responses by Shear Engineering 152. "[04/26/04] The utility plan checklist should be re -checked and resubmitted with every round. Original comment: Please refer to the redlined utility plan checklist for further comments. " R. See engineering Responses by Shear Engineering Topic: Grading 75. "[0426/04] In speaking with Craig Foreman of Parks Planning, he requires another onsite meeting with the engineer, having the extents of the drainage improvements staked out, in order to determine whether what is proposed is acceptable. He also corrected my previous statement regarding the need for an easement on parks property, and that an easement (rather than simply legals and sketches for a Notice of Facility Location) is needed and must go to City Council for approval. Original comment: Offsite grading/other work performed on Parks' land requires their approval. Please provide a letter from the Parks department stating their approval of what is shown on their property. " R. See engineering Responses by Shear Engineering 139. "[04126/04] It is unclear how tall the retaining walls will be. Please label top of wall elevations. If retaining walls are >6' high, building permits are required for them. Please apply for these through Building and Zoning. Original comment: Please provide a detail of the retaining wall. " R. See engineering Responses by Shear Engineering Topic: Landscape Plan 37. "[04126104] Repeat: Please match with other plans/plat. " R. Coordinated. 38. "[0426/04] The sight distance easement restriction language needs to be added to the landscape plan, and any landscaping not meeting requirements in these easements needs to be revised. Original comments: Landscaping in median in bulb of cul-de-sac needs to meet Sight distance easement restrictions. Please see the attached form for restrictions and include these restrictions on both the landscape plan and the plat. R. The site distance easement restriction language has been added to the landscape plan and any landscaping not meeting the requirements or otherwise agreed upon with the city has been revised. Landscaping in the median bulb of the cul-de-sac shall meet the site distance restrictions. June 14, 2004 Project No: 1558-02-01 City of Fort Collins Planning P.O. Box 580 Ft. Collins, Colorado 80524 Attn: Steve Olt Re: Responses to Staff Project Review Comments Dated 05/05/04 Mason Street North; Ft. Collins, Colorado Previously Lot 12 and Tract A, Martinez P.U.D. Dear Mr. Olt, Project comments in regards to the Site Plans, and Landscape Plans have been addressed with this resubmittal. The responses follow the numbering order presented in the summaries. Engineerine Issue Contact: Katie Moore Topic: Cover sheet 169. "[04/26/041 Please correct the private drive cross-section to show that the whole width of the parking area is in a public access easement. " R. See engineering Responses by Shear Engineering Topic: General 54, "[04/26/04] Repeat: All sheets: Please see sheet for any additional comments." R. Acknowledged. 74. "[04126/04] Please provide copies of completed RR agreements to the City prior to Mylars. Original comment: Any work down within the RR ROW/easement requires approval by the railroad. Please provide a letter of intent from the Railroad regarding these improvements (grading, landscaping, pedestrian crossing, etc.). R. Acknowledged: These completed agreements will be provided upon availability or worked out with the City Attorney's office prior to mylars. 111 777 PEARL ST SUITE 210,13OULDER. COLORADO 80302 TEL303,"72788 FAX303,"7,2M 0 ARCHITECTURE, URBAN DESIGN, PLANNING, DEVELOPMENT CONSULTING