Loading...
HomeMy WebLinkAboutPROVINCETOWNE P.U.D., FILING NO. 2, FIRST REPLAT - PDP - 73-82W - CORRESPONDENCE - (8)FORT COLLINS-LOVELAND WATER DISTRICT / T � 1I0 SOUTH FORT COLLINS SANrrATION DISTRICT Y November 13, 2002 Mr. Steve Olt City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: #73-82W Provincetowne PUD, 2"d Filing Replat of Condo Blocks 1, 2, &3 Dear Mr. Olt, The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned request and submit the following comments. The total number of proposed units cannot exceed the total number of units that were approved April 2001. A separate water and sanitary sewer tap is required for each building. A drawing is to be submitted for approval that identifies the water meter pit locations. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, Mr. T W.FarriII Systems Engineer RECEIVED "V 1 4 2002 CURRENT PLANNING xc: Mr. Michael D. DiTullio, District Manager Manhard Consulting 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186 This completes staff comments at this time. Additional comments may be forthcoming. This development request is subject to the 90-day revision re -submittal (from the date of this comment letter) as set forth in Section 2.2.11(A) of the Land Use Code. A copy of a Revision Routing Sheet, indicating the number of copies of the revised subdivision plat to re- submit, is attached to this comment letter. Be sure and return all of your red -lined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6341. Yours Truly, Steve Olt, City Planner Page 3 5 (9/30/02) Label all the existing easements. 11 (9/30/02) See additional comments on the plans. 13 (9/30/02) Need to identify and label the new building envelope size and make it clear that the areas being vacated are to be a part of the building envelope. (11/25/02) Can even remove the old building envelope lines and dimensions that are not needed. 17 (11/25/02) Add the following note to the plans to vacate the easements dedicated by the -first plat. All easements shown on Condo Blocks 1, 2, and 3 of Provincetowne PUD, Filing No. 2 are vacated by this plat. 18 (11/25/02) What does Note #2 (Sheet 1 of 6) mean? When were those easements vacated and how was that done? 19 (11/30/02) Need to provide reception numbers for the adjacent easements that are shown and identified as being dedicated by separate document. This would be the county reception number. The reception number that you are showing on the plans is a City filing number (P- 124 2245) and not a County reception number. It needs to be removed from the plans. 20 (11/30/02) Sheet 2 of the set is not needed. Because it is more of a reference sheet, do not include it in the final set to be recorded. 21 (11/25/02) Need to meet with or talk with Technical Services regarding the plat and what needs to be done. They offer the following comments: 1. The 'Reception" # (P-124 2245) is NOT the Larimer County Receptions #, it is an internal City recording reference #. Please remove it from the subdivision plat. 2. The outer boundary of each block being replatted must be monumented. 3. We need to discuss how to show the changes to the building envelopes, etc. 4. All of sheet 2 is not needed - it is confusing. 5. There still appear to be many problems with the replat. Department: Natural Resources Issue Contact: Doug Moore Topic: General 12 Show and label wetland delineation on replat. Page 2 �o CitVof Fort Collins Manhard Consulting Ltd. c/o David Miller, P.L.S. 8232 E. Park Meadows Dr. Littleton, CO. 80124 STAFF PROJECT REVIEW Date: 12/2/2002 Staff has reviewed your submittal for PROVINCETOWNE PUD, 2ND FILING, REPLAT, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General 16 Len Hilderbrand of Xcel Energy (Public Service Company) offered the following comments: a. Public Service Company (PSCO) has conflicts in several areas where easement vacations are being requested. PSCO has existing gas mains in two locations, Buildings 4 & 30. b. The customer will need to provide PSCO with a drawing showing exact locations of gas mains and buildings in easements asking for vacations of those easements. C. Any relocation of gas mains will be at the developer's expense. 1212102 - These comments have been left in this comment letter only because the City has not received any new comments from Xcel Energy after a re -submittal was made. It is understood that the applicant has contacted Len Hilderbrand directly and addressed his concerns. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General 3 (9/30/02) Need to provide dimensions for all the easements shown and for the property boundary. 4 (9/30/02) It needs to be clear as to what the property boundary of this plat is. The streets can not be included in the replat. Have net ineluded all e f Conde Bleek t o this plat. (11/25/02) The boundary needs to defined. Need pins and monuments. Page i