DATE: July 18, 2001 TO: Technical Services
PROJECT: #26-97A Pedersen Auto Plaza Expansion - Major
Amendment
All comments must be received by Steve Olt in Current Planning
no later than the staff review meeting:
August 8, 2001 50
❑ No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
/, /,E�/�L DoEs NoT CGoSE, ,BaaAl>14-4� CLOVES
Z, IF %/Yl 4 ON F Lv1,
-r
�T► C..c. Na eps A LOT /V u vn n e �L w SQ1. �oTr4cx tT,
�T /S CoNFos iNp u1t-rl-4 eta o�47-
Z 9 T
F- 120KTNT ID,2�t ous PLAT) SNow� .
IDAWK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIOMSignature:_
_L-Kt _ Site _ Drainage Report _ OBier
Utility _ Redline Utility — Landscape
9 Issue Contact. Jeff Hill
Maintain the required landscape/utility separation distances on the landscape
plans.
13 Issue Contact. Roger Buffington
Any connections to the 18-inch sanitary sewer must be made at a manhole.
Zoning
Issue Contact: Gary Lopez
Will the parking be adequate. The body shop alone could have 46 veh. spaces
for customers/staff (not incl. display/storage of inventory). Recent violation of
storing inventory off the site prompts this question?
2 Issue Contact: Gary Lopez
Will trash/rubbish be stored within bldg? No trash enclosures shown.
3 Issue Contact: Gary Lopez
Detached bldg., will that be built now? No elevations shown. If built later,
minor amend. required for footprint and elevations at that time.
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
el� QL�
STEVE OLT
City Planner
2of2
JZ'A"ft STAFF PROJECT REVIEW
Cihof rori CaLLins
LOCKWOOD ARCHITECTS Date: 8/14/01
DANA W LOCKWOOD
420 S HOWES, STE 101 B
FT COLLINS CO 80521
Staff has reviewed your submittal for PEDERSEN AUTO PLAZA SUBDIVISION #26-97, and
we offer the following comments: eme ►%mk
ISSUES:
Natural Resources
12
Issue Contact. Doug Moore
Single Trash Hauler -
We request that a single trash hauler be used for both Existing Business
and the Proposed Business Expansion.
Water Wastewater
4 Issue Contact: Jeff Hill
Water and sewer services must remain perpendicular to the mains when
possible.
5 Issue Contact: Jeff Hill.
Place curb stop and meter pit adjacent to the street.
6 Issue Contact: Jeff Hill
Field locate, show and label all existing water/sewer mains, services and their
associated appurtenances.
7 Issue Contact: Jeff Hill
Our records indicate that there are 2 existing cathodic protection test stations
within this project vicinity. Show and label these on the plans and include a
note to protect in place. Also include a note to coordinate any relocation or
adjustment with the City utilities at 221-6700.
8 Issue Contact. Jeff Hill
Include the following detail in the utility plan set: typical water/sewer services,
meter pit, sand/oil interceptor, manhole adjustment and waterline bedding.
1 of 2
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
STEVE OLT
City Planner
6 of 6
22 Issue Contact: Wes Lamarque
In Basin P-mod, the spillway is designed to carry the 1007year flow to the
detention pond, while the storm sewer is designed to carry the 10-year flow.
This is acceptable, however it is required to have the swale carry the 100-year
flow times 1.33 for freeboard. The ovetopping elevation is around 49.8 just
northwest of the proposed building. Please show that the 100-year flow X 1.33
can pass without flooding the new proposed building, which has a F.F.
elevation of 40.50. This should be just a matter of ducumentation in the report.
23 Issue Contact: Wes Lamarque
Water Quality Outlet Structure:
Please use City of Fort Collins standard outlet structure rather than drilling the
orifice holes through the concrete. See USDCM, Vol. 3, Typical Structural BMP
Details section, Figure 6-a
25 Issue Contact: Wes Lamarque
Please consider tailwater affects for the existing storm sewer in Mason Street.
There will defenitely be some tailwater depth and even though there is no
current documentation, a simple analysis can be done with the flow rates
known for the ponds upstream draining into the pipe, and the flow to the
retrofited inlet.
26 Issue Contact: Wes Lamarque
Offsite Detention Pond Modifications:
Please provide a letter of recognition from the property owners to the north that
the ponds on their site will be modified. Also, please provide documentaion that
the new 100-year water surface elvations will be within the current drainage .
easements. This can be done with an exhibit in the report showing the existing
WSEL, new WSEL and current drainage easements.
27 Issue Contact: Wes Lamarque
Please look into the possibility of adding the WQCV to the quantity detention.
Please see redline comment on page 4 of report.
28 Issue Contact: Wes Lamarque
Please see additional redline comments in the plans and report.
Transportation Planning
24
Issue Contact., Kathleen Reavis
Ped connection to Mason was provided. Ped xings on site should match pattern
& color from first phase.
5 of 6
12 Issue Contact: Sheri Wamhoff
Do not indicate that work is to be done by others. The developer is responsible
for all work shown on these plans. You can have agreements with someone
else to do the work, but everything shown on the plans will need to be done
with this project.
13 Issue Contact: Sheri Wamhoff
Missing some sidewalk and crosswalks on the utility plans that are shown on
the site plan.
14 Issue Contact: Sheri Wamhoff
Need to indicate that the street patch is to be in accordance with City standards
with exact limits to be determined by the City inspector.
15 Issue Contact: Sheri Wamhoff
Label the 7 foot high fence on the utility plans.
16 Issue Contact: Sheri Wamhoff
What does the detention pond handrail sit on? Are there to be poured
columns? The notes on the plans indicate that the retaining wall does not
extend across this area and I assume it will not be bolted down to the dirt.
Need more info here.
17 Issue Contact: Sheri Wamhoff
It appears that off -site drainage and construction easemetns will be needed
with this project.
18 Issue Contact: Sheri Wamhoff
Make changes to the ped ramp detail as shown.
19 Issue Contact. Sheri Wamhoff
Provide detail 7-20A and 22-1.
20 Issue Contact: Sheri Wamhoff
See plans for additional comments.
Storcnwater Utility
21
Issue Contact: Wes Lamarque
Detention pond:
The release rates for detention pond A differ between the report and plans.
Please check calculations and revise: Also, cross section/ spillway locations
are shown in the pond area but are not clearly labeled.
4 of 6
2 Issue Contact: Sheri Wamhoff
Use detail 7-29B for the driveway cut. Identify t = 8 inches min, identify the
radius and width of the drive as well on this detail. The drive radii should be 20
feet per 8.2.9.A Table 8-2. Provide this detail.
3 Issue Contact: Sheri Wamhoff
Showing two lots and labeling as such, but have a note that the lot line goes
away with the plat. Where is the division between the two lots then?
4 Issue Contact: Sheri Wamhoff
Need to show the retaining walls on the site and landscape plans. Also need to
show where the steel handrail is to be located.
5 Issue Contact: Sheri Wamhoff
The drainage easements are not correctly shown on the site and landscape
plans.
6 Issue Contact: Sheri Wamhoff
The building envelope can not extend over the easements.
7 Issue Contact: Sheri Wamhoff
Make changes to the plat language as shown.
Note #2 on the plat. Doesn't make sense as written. I am guessing that the
intent of this note is that the easements shown on the prior plats should be
vacated. Here is an example of a note on another plat that has been filed:
THE EASEMENTS SHOWN ON LOT 2 OF HIGHLAND AUTOS P.U.D. AND
LOT 1 PEDERSON AUTO PLAZA SUBDIVISION ARE TO BE VACATED
WITH THIS PLAT AND REPLACED WITH EASEMENTS AS SHOWN
HEREON.
8 Issue Contact: Sheri Wamhoff
Don't need the sight distance easement language, as there is not a sight
distance easement on this plat.
9 Issue Contact: Sheri Wamhoff
Label the street width and easement widths.
10 Issue Contact: Sheri Wamhoff
Make changes as shown or add information as needed to the general notes.
11 Issue Contact: Sheri Wamhoff
Indicate that the plat is to be included in this set after the cover sheet.
3 of 6
36 Issue Contact: Steve Olt
Engineering has asked why there is a steel retaining handrail?
37 Issue Contact: Steve Olt
Engineering has indciated that the building envelope extends into an easement.
This is not permitted.
38 Issue Contact. Steve Olt
Off -site drainage and construction easements are needed. They must be
provided, reviewed, and accepted by the City prior to scheduling this item for
public hearing.
39 Issue Contact: Steve Olt
Stormwater has indicated that the detention pond needs freeboard.
40 Issue Contact Steve Olt
Stormwater has indicated that the proposed water quality outlet structure is not
consistent with what the City uses.
41 Issue Contact: Steve Olt
Stormwater has indicated that letters of intent from the affected property
owners for the necessary off -site improvements must be provided to the City.
42 Issue Contact: Steve Olt
Will the expansion of this facility generate new employees?
43 Issue Contact., Steve Olt
The landscaping to be used for screening of parking and vehicle display areas
along Mason Street is either too short (less than 30") or does not extend far
enough to provide 70% screening (see the red -lined Landscape Plan).
44 Issue Contact: Steve Olt
Please contact the City's Transportation Planning Department to discuss the
timing for construction of the previously approved trail access from Mason
Street to the Mason Street Multi -modal Corridor (soon to be under
construction).
Engineering
1 Issue Contact: Sheri Wamhoff
Need to provide a detail of the textured and painted x-walks that are shown on
the site plan.
2of6
STAFF PROJECT REVIEW
City of Fort Collins
Lockwood Architects Date: 8/14/01
Dana Lockwood
420 S Howes
Fort Collins, CO 80521
Staff has reviewed your submittal for PEDERSON AUTO PLAZA -MAJOR AMENDMENT, #26-
97A, and we offer the following comments: ,PratecE-
ISSUES:
Current Planning
29
Issue Contact: Steve Olt
AT&T Broadband asks that the applicant please contact their Easement
Coordinator, Reneta Santoro, at 419-3106.
30 Issue Contact: Steve Olt
Mike Spurgin of the Post Office indicated that they have no comments
regarding this development proposal. _
31 Issue Contact. Steve Olt
Len Hilderbrand of Public Service indicated that they have no comments
regarding this development proposal.
32 Issue Contact: Steve Olt
City staff has asked the question: What is the proposed use for the "future"
building? The answer should be included on the Site Plan.
33 Issue Contact: Steve Olt
Technical Services has a problem with the subdivision plat. It is unclear
whether it is 1 or 2 lots?
34 Issue Contact. Steve Olt
Engineering does not really want the textured and painted pedestrian crossing
in the Mason Street right-of-way. However, Transportation Planning would like
this to remain to match the existing crosswalk on the original site.
35 Issue Contact. Steve Olt
The retaining walls for the detention pond should be shown on the Site and
Landscape Plans.
1 of 6
Use Code) that begins on the date of the comment letter
prepared by the project planner in the Current Planning
Department. In this case the date is 8/ 14/01. The
outstanding issues must be resolved so that the item can be
scheduled for public hearing or revisions re -submitted with
the 90 day period.
You may contact me at 221-6341 if you have questions about
these comments or would like to schedule a meeting to
discuss them.
Sinc rely,
teve Olt
Project Planner
xc: Northern Engineering
King Surveyors Inc.
Project File #26-97A
Commr 'ty Planning and Environmental
Current Planning
City of Fort Collins
August 14, 2001.
Lockwood Architects
c/o Dana Lockwood
4803 Innovation Drive
Fort Collins, CO. 80525
Dear Dana,
rvices
Staff has completed a review of your revisions for the
Pedersen Auto Plaza Expansion - Major Amendment that
were submitted to the City on July 18, 2001. Copies of two
STAFF PROJECT REVIEW comment letters are attached. The
letters are from our new Development Management System
(DMS). The reason for two different letters is because some
staff persons entered their comments in the original Pedersen
Auto Plaza Subdivision file before they realized that this major
amendment is a new submittal and file. We are still working
on some formatting modifications to. the letters (which really
does not affect you).
The most significant outstanding issues seem.to be the
detention pond design and the need for off -site easements.
Another full round of review may or may not be necessary;
however, the stated issues must be resolved before the item
can be scheduled for a public hearing. It may be possible to
resolve the issues by talking with the most affected
departments directly.
There could be additional comments and red -lined plans
forthcoming. Also, this development proposal is still subject to