HomeMy WebLinkAboutRIGDEN FARM, 12TH FILING - PDP - 56-98AN - CORRESPONDENCE - (9)Response: Acknowledged.
There has been concern expressed about the apparent lack of information or "final"
decisions provided by City staff at the Preliminary Design Review meeting on August 23111
will be coordinating a meeting with you, your clients, and City staff (Engineering,
Stormwater, Water/Wastewater, Poudre Fire Authority, and Transportation Planning) to
further discuss issues associated with this proposed development and provide further
direction before you invest additional time and expense to prepare Project Development
Plans for submittal to the City.
Response: We have met with departments individually to resolve the issues.
Page 9
[8/27/06] Provide a fire hydrant connecting to the existing S-inch water stub off Kansas.
It appears that there is space for a hydrant to the north or south of the drive. The
arrangement of curb stops and meter pits for the three services connecting to this line
makes maintenance/replacement of the senices difficult. We would like to work with you
on revising this during utility plan review.
Response: This portion of the plan has been revised as discussed with City staff. The
revised layout. does not require a fire hydrant in this location.
Number: 24 Created: 8 / 27 / 2006
[8/27/061 Provide sizing calculations for the water services. The larger buildings may need
2-inch services. (Plant investment fees and water rights for residential are based on
number of units and lot area NOT size of service.)
Response: The site plan has been revised to show eight buildings for eight separate taps.
The 1.5" tap size is adequate for these revised building sizes.
Number: 25 Created: 8 / 27 / 2006
[8/27/06] Are any irrigation taps planned?
Response: No.
Number: 26 Created: 8 / 27 / 2006
[8/27/061 City Code (Section 26-94 and 26-256) requires that each building has separate
water/sewer services. On the revise plan sheet that was received on 8/25/06, it appears
that units 48-51 are separate from units 52-62 and will need separate services. In
addition, the sewer service for units 16-24 must be a separate service line to the MH east of
Iowa.
Response: Acknowledged
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 9 Created: 8 / 23 / 2006
[8/23/06] The property is located in the MMN zone and is subject to a Type 1 review. The
number of off-street parking spaces required is based on the number of bedrooms per unit.
1.5 spaces for every 1 bedroom unit, 1.75 spaces for every 2 bedroom unit, and 2 spaces for
every 3 bedroom unit.
Response: We propose a 2 car garage for each unit. All units are either 2 or 3 bedroom
units. Additional guest and overflow parking is provided on -street.
The following comment was received from Ron Gonzales of the Poudre Fire Authority on
August 28, 2006:
"I recently had a brief meeting with the Hearne Brothers regarding a fire dept.
access issue. We were successful resolving the issue so that we're able to gain
access from two directions for dwelling units facing the interior court.
They were going to speak with you (Steve Olt, Current Planning) and perhaps. R.
Buffington (Water/Wastewater) to check how this safety measure might impact the
balance of the project."
Page 8
Kansas Dr. Or if need be have a separate pipe along Kansas to drain the
center of the project.
A possible way to address plugging of the grate on the sump inlet would be
to have a second inlet into the pipe that has more of a vertical open throat
like a type R inlet so it isn't as likely to get plugged by debris like a grate. A
possible location for this would be the back wall of the guest parking area
since the pipe runs through there anyway. The stairs may have to be on one
side or the other to make the inlet easier to build. (Referring to the updated
site plan with pipe in center of 12 ft. guest parking area)
Another suggestion is to build in some redundancy by adding additional area
inlets in the private drive. The only down side to that is additional grates
could also plug easier than an open throat inlet.
Response: The drainage pipes have all been sized to provide emergency conveyance. See
the drainage report.
2. Another concern is running the pipe through the wall which is essentially part of
the foundation wall of the building.
A suggestion is to sleeve the pipe which ,vould have to be a water tight pipe
like ductile iron or PVC water pipe since it is so close to the building
foundations. Just for future maintenance the sleeve should run from
driveway to driveway and completely under the building.
In addition to the maintenance concern is the possibility of a beam break as
the pipe goes through the wall. Maybe with the open throat inlet there
would be a box that could serve as protection of the pipe as it went through
the wall.
Response: Acknowledged.
Number: 30 Created: 8 / 29 / 2006
[8/29/061 Rigden Farm Overall Drainage Plan basin delineation: At the PDR there was
discussion on the drainage sub -basins that were given to the applicant when the property
was purchased. The original Filing One report shows a basin 582 that has a basin line on
the south side of pond 212. In the latest update for Filing Six some basins were combined
differently but on this site the basin line for basin 58 still has a line on the south side of
pond 212. In fact it shows a future street on the south side of pond 212, most of which is
to drain into the pond. So for this particular site pond 212 is designed to take a small
portion of it at the high imperviousness of a street. As far as what the applicant was given
by the seller I do not know the source of that information. Other than that I can only
speculate that the information may have been misinterpreted. I will make a "pdf' file
showing the basins from both reports and send them electronically to the applicant's
engineer. If there is a basin transfer of drainage the modeling will be required to document
system capacity or needed revisions.
Response: The.proposed drainage basin boundaries are in close agreement with those in
the overall drainage plan. See the drainage report.
Department: Water -Wastewater
Topic: Water/Wastewater
Number: 23
Issue Contact: Roger Buffington
Created: 8 / 27 / 2006
Page 7
engineer will need to verify that the imperviousness is the same or less than the
imperviousness used in the overall drainage report for Rigden Farm. The report indicates
90% imperviousness. The pond along the north side of the site is to have a volume of 0.8
ac-ft. in case there is any grading in the pond area. Water quality treatment was included
in the overall drainage plan.
Response: Acknowledged. This is addressed in the drainage report.
Number: 3 Created: 8/ 22 / 2006
[8/22/061 If the pond to the north is partially on this site an easement for the existing
pond one will be needed as part of the final plan approval if there isn't already one. The
maintenance of the channel is the responsibility of the property owner unless there are
other agreements with the Rigden Farm developer.
Response: Acknowledged. The existing detention pond to the north does not extend into
this site. Also, we understand the property north of us is planning to re -grade the pond all
the wati to our property line. We anticipate that the neighbor will provide a hand rail
adjacent to our walk if their grading requires such.
Number: 4 Created: 8 / 22 / 2006
[8/22/061 The applicant asked if units 16 - 18 can drain to the streets in front of the unit.
It appears that is the intent of the overall design so that is fine.
Response: Acknowledged.
Number: 28 Created: 8 / 28 / 2006
[8/28/061 During the PDR the applicant asked for documentation on why the garages
cannot be flooded. Sec. 26-492 "Declaration of Purpose" of the City code includes
protection of property. Sec. 26-541 "Property Owners to provide stormwater facilities" and
Sec. 26-544 Stormwater facilities required for subdivisions" also speak to the issue. In
addition the Storm Drainage Design Criteria and Construction Standards give more
detailed design information such as the clogging factors.
Response: Our design does provide stormwater facilities that prevent flooding with the
priman: system. See the drainage report.
Number: 29 Created: 8 / 28 / 2006
[8/28/061 Emergency overflow for the sump inlet in the private: The following area couple
concerns and suggestions to address each one:
1. The primary concern is to have an outfall in addition to the area inlet to divert the
flow* and prevent it from entering any buildings if the inlet is plugged. It is not the
possible plugging of the pipe that is the main concern. It is mainly plugging of the
area inlet. If this can be addressed the concept shown on the site plan could be
approved.
I think the first thing that needs to be considered is what is the volume of
runoff draining to the inlet if it were plugged from the beginning of a 100
year storm? It may be possible to grade the private drive such that the water
will pond only in the drive especially if the contributing area can be
minimized.
In conjunction with that a way to minimize the drainage area contributing to
the sump inlets is to possibly drain the center of the project (Units 38-64) to
Page 6
Number: 6 Created: 8/23/2006
[8/23/06] ACCESS: A fire lane is required. This fire lane shall be visible by painting and
signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for
approval prior to installation. In addition to the design criteria already contained in
relevant standards and policies, any new, fire lane must meet the following general
requirements:
u Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable
of supporting fire apparatus weights. Compacted road base shall be used only for
temporary fire lanes or at construction sites.
u Have appropriate maintenance agreements that are legally binding and enforceable.
1-1 Be designated on the plat as an Emergency Access Easement.
❑ Maintain the required minimum width of 30 feet throughout the length of the fire
lane.
If a fire lane cannot be provided, the buildings shall be fire sprinklered.
Response: Acknowledged.
Number: 7 Created: 8 / 23 / 2006
[8/23/061 ADDRESSING: Address numerals shall be visible from the street fronting the
property, and posted with a minimum of six-inch (6) numerals on a contrasting
background. (Bronze numerals on brown brick are not acceptable.) For this project, PFA
also requires the address to be mounted at the rear (garage side) of each individual unit.
Addressing shall be consistent with the system for Brooklyn Park - Phase 1.
Response: Acknowledged.
Number: 8 Created: 8 / 23 / 2006
18/23/061 TURNING RADII: Minimum inside turning radius is 25 feet, minimum outside
turning radius is 50 feet.
Response: Acknowledged.
Number: 22 Created: 8 / 25 / 2006
[8/25/061.
Topic: Zoning
Number: 10 Created: 8 / 23 / 2006
[8/23/061 MONUMENT SIGN: A monument sign shall be erected at the drive cuts on
Kansas Drive, displaying the units addressed off Kansas.
Response: Acknowledged.
Department: Stormwater Issue Contact: Glen Schlueter
Topic: Stormwater
Created: 8 / 22 / 2006
Number: 1
[8/22/061 This site is in the Foothills drainage basin. The citywide new development fee is
$3,070.00/acre which it is subject to the runoff coefficient reduction. This fee is to be paid
at the time the building permit is issued.
Response: Acknowledged.
Number: 2 Created: 8 / 22 / 2006
[8/22/06]A drainage and erosion control report and construction plans are required and
they must be prepared by a Professional Engineer registered in Colorado. The design
Page 5
[8/25/061 Until existing conditions (including unbuilt approved driveway locations) are
shown for a minimum of 150' from the property boundaries, the driveway locations cannot
be approved. Proposed driveways must line up with those proposed across the street.
Response: There are 110 existing or approved driveway locations across either street. from
our proposed driveway locations. Pioneer School is directly east. across hansas Drive, and
has no driveway access points on hansas Drive. An undeveloped (and unapproved) parcel
is d.irectlh' west across Iowa Drive from the site, so there are no access drive locations
across Iowa Drive.
Number: 17 Created: 8 / 25 / 2006
18/25/061 See Figure 19-6 for parking setback requirements. The traffic volumes
discussed in the TIS will be necessary to use the table and determine the required setback
to the first garage door from the street. It will probably be either 40' or 50'
Response: Our closest garage doors are 32 feet from the flowline of the streets. Based on
our traffic numbers, 40 feet is required. Please see the attached variance request to this
standard from Matt Delich.
Number: 18 Created: 8 / 25 / 2006
[8/25/06] No structures of any kind are allowed within easements. See Comment 14.
Response: See response to comment 14 above.
Number: 19 Created: 8 / 25 / 2006
[8/25/061 A utility coordination is suggested prior to first submittal. Please contact me so
that I can set one up for you when you're ready with the new layout.
Response: We will be contacting you to set this up.
Number: 20 Created: 8 / 25 / 2006
[8/25/06] Grading must be flat to nearly flat for a minimum of T behind the sidewalk. All
grading affecting public rover can not exceed 4:1 slopes.
Response: Acknowledged.
Number: 21 Created: 8 / 25 / 2006
[8/25/06] Please see LCUASS and Appendix E4 for other submittal requirements. I can
email the checklist to you to make it easier if you like. We have the items required prior to
hearing highlighted so you know what must be shown on the plans with the first submittal.
The check list must be completed and submitted with the first round of review as well.
Email me at sjoy@fcgov.com and I'll send it back.
Response: Checklist is submitted with this application.
Department: PFA Issue Contact: Carie Dann
Topic: FIRE
Number: 5 Created: 8 / 23 / 2006
[8/23/06] WATER SUPPLY: Fire hydrants, where required, must be the type approved by
the water district having jurisdiction and the Fire Department. Hydrant spacing and water
flow must meet minimum requirements based on type of occupancy. Spacing and flow
requirements include 1,500 gpm at 20 psi residual pressure, spaced not further than 300
feet to the building, on 600-foot centers thereafter.
Response: Acknowledged.
Page 4
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 11 Created: 8/25/2006
18/25/06] The first driveway off Kansas is much too close to Custer and presents a safety
issue. Our minimum driveway setback is 175' from CL to CL and it appears that you have
provided for only 100'. No variance will be granted due to safety and traffic concerns.
Response: Kansas drive is a residential local street.. The: minimum corner clearance for the
sas
driveway is 100 feet for local streets, so vve meet the standard for the driveway on Kanaer
Drive. Iowa Drive is a commercial local street, which requires the minimum 175' corner
clearance separation. Matt Delich has analyzed the safety and traffic concerns of reducing
this minimum separation to 100 feet in this case, and has concluded a lesser separation
can be achieved safely. Please see the attached variance request from Matt. Delich.
Number: 12 Created: 8 / 2 5 / 2006
[8/25/061 Diagonal Parking off Kansas: This will not be permitted and no variance will be
granted. Please design the street section in accordance with 7-9F.
Response: We have removed on -street diagonal parking from our proposed layout.
Number: 13 Created: 8 / 25 / 2006
[8/25/061 Skewed -Driveway off Kansas: A 75 degree skew has been proposed and does
not meet our minimum requirement of 90 degrees, plus or minus 10 degrees for a
minimum of 25'. A variance request will not be considered to this standard as it appears
the site will easily accommodate that requirement. In other words, there are no site
constraints that would prevent a safer, straighter driveway from being constructed to
standard for the first 25'.
Response: OK. We have redesigned this to address this comment. Please review the
revision and let us know if this works.
Number: 14 Created: 8 / 25 / 2006
18/25/061 Attached Sidewalks: A variance will not be granted as there are no site
constraints preventing this project from designing the typical street section to standard.
Please design all street frontage in accordance with 7-9F and 7-5F. Please keep in mind as
you are adjusting your layout that no structures of any kind, including stairs, retaining
walls (versi-lock or other), footings and foundations, are allowed within the utility
easement. See Figure 16-1 for other requirements regarding minimum setbacks for other
objects and materials.
Response: Sidewalks are now detached. Street frontage has been designed in accordance
with LCUASS. Only sidewalks graded to allow access to the buildings are in easements.
(They are steps in a sidewalk not stairs).
Number: 15 Created: 8 / 25 / 2006
[8/25/061 Please design driveways in accordance with 706 or if the TIS shows more than
350 trips a day, then design the driveway in accordance with 707 per 9.3.2.A. Since the
driveways will become part of emergency access drive, PFA may require 25' curb returns to
meet their minimum inside turning radii requirements instead of our 20' requirement'.
PFA's safety minimums would take precedence. The maximum grade from the row (back of
walk) is 8% for a minimum of 20' per 9.3.3.B.
Response: We've designed the driveways in compliance with 706.
Number: 16
Created: 8 / 25 / 2006
Page 3
A
C. Please see additional Stormwater comments in this letter, below, beginning on Page
S.
Response: AcknovvIedged.
Transportation Planning
a. Transportation Planning will not support the proposed attached sidewalks on bwa
and Kansas Drives. Should these sidewalks be allowed to be attached then the
sidewalks must be a minimum of 6.5' wide.
Response: The sidewalks have now been detached, as requested.
b. If the proposed diagonal parking on Kansas Drive is allowed then the sidewalk in
front of those spaces must be a minimum of 6' wide.
Response: Eric Bracke has explained that he will not support diagonal parking on the
public streets, so we have removed it from our proposed layout.
Poudre Fire Authority (PFA)
a. PFA needs exterior accesses (man doors) to the living areas from the garage sides of
the buildings. These doors need to be separate from the garage doors.
Response: We've coordinated this issue with Carie Dann and Ron Gonzales, and detached
the buildings, and removed the L-shaped building configuration; so those units can be
accessed from the fire lane easier. This has eliminated the need for man doors according to
PFA.
Planning
a. With the layout as proposed at Preliminary Design Review, the sidewalks along the
north side of the property and the interior courtyard between buildings must be
designed and constructed to satisfy the "major walkway spine" definition and
requirements as set forth in the Land Use Code.
Response: We have refined the site layout so that the priman7 entrance of all dwelling units
is within 200 feet of a street sidewalk.
b. All buildings must be set back from the surrounding street rights -of -way a
minimum of 1S'.
Response: MMN zone doesn't have a minimum setback in accordance with 4.5(E)(2)(c) of
the LUC. It's our understanding that we only need to stay out of any utility easements.
C. This property, being in the MMN - Medium Density Mixed -Use Neighborhood Zoning
District, must maintain a minimum average density of 12 dwelling units per net
acre of residential land. There is no maximum allowable residential density, in this
district. The proposed 64 dwelling units on the 2.6 acres results in a density of 24.6
dwelling units per acre.
Response: Acknowledged.
Page 2
Responses
to
Preliminary Design Review Comments
Rigden Farm, 141" Filing
Brooklyn Park Rowhouses,
Phase 2, P.D.P.
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 27 Created: 8/28/2006
[8/28/061 The following comments were expressed at the PDR meeting on August 23,
2006:
Engineering
a. Regarding the proposed sidewalk along the north side of the property, adjacent to
the existing detention pond, there must be a minimum T wide flat area from the
north edge of the walk to the top of the pond slope.
Response: Acknowledged.
b. The private driveways to this facility from Kansas Drive must maintain a minimum
12' separation, edge to edge.
Response: Acknowledged.
Water/Wastewater
a. . There are existing utilities all around this site.
Response: Acknowledged.
b. The more services to this site the more utility coordination issues there are.
Response: Acknowledged, we'd like to have a utility coordination meeting.
Stormwater
a. The drainage facility to the north is an existing detention pond, not a drainage
channel; therefore, it cannot be piped.
Response: Acknowledged.
b. There are some grading issues associated with this site.
Response: Acknowledged, see the submitted grading plan.
Page 1