HomeMy WebLinkAboutRIGDEN FARM, 12TH FILING - FDP - 56-98AQ - CORRESPONDENCE - (3)iRigden Farm 12'" Filing, Brooklyn Rowhouses Ph 2
Administrative Hearing
Findings, Conclusions, and Decision
February 12, 2007
Page 5 of 5
DECISION
The Rigden Farm, 12th Filing, Brooklyn Park Rowhouses, Phase 2, Project
Development Plan, #56-98AN, is hereby approved by the Hearing Officer subject to the
following condition:
At the time of Final Plan, the Applicant shall provide exterior front entry light fixtures with
glazing of sufficient opacity to reduce glare consistent with the requirements of Section
3.2.4(D).
Dated this 13th day of February, 2007 per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code. `^
6meron Gloss
urrent Planning
1
Number: 97 Created: 3 / 20 / 2007
[3/20/071 Please revise the utility plan title block to remove "preliminary".
Please provide a redundant overflow system in the outlet to direct runoff
back into storm sewer in case of plugging.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 26 Created: 12/ 19/2006
[3/ 19/07] Curb stops must be located out of driveway areas. Schedule
meeting to work out the curb stop/meter pit locations. It may be necessary
to move Fire Hydrant to the west a bit and provide a small pocket easement
off the drive to provide space for meter pits.
[12/ 19/06] Move curb stops and meter pits on 1.5-inch water services for
the three southeast buildings to the north near the drive. Curb stops must
be within a utility easement.
Be sure and return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
A)em�
Steve Olt
City Planner
cc: Susan Joy
Longmeadow Holdings, LLC
Illumination Planning, Ltd.
Current Planning file #56-98AQ
Page 9
Number: 100 Created: 3/ 21 / 2007
[3/21/07] 2-HOUR FIRE SEPARATION: Per the agreement between PFA
and the applicant, two-hour fire separation walls are required between each
unit. Two-hour fire separation shall extend the entire height/length of the
walls, from grade to sub -roof.
Number: 101 Created: 3/ 21 / 2007
[3/21/07] FIRE SAFETY DURING CONSTRUCTION: The project shall
comply with applicable standards contained in IFC Chapter 14 - Fire Safety
During Construction and Demolition.
Department: Transportation Planning Issue Contact: David Averill
Topic: Site Plan
Number: 91 Created: 3/ 19/2007
[3/ 19/071 If the bike /ped path is to be widened to 10' for fire access, then
we will need a break -away bollard installed so as to keep private vehicle
traffic off of the trail. I've talked with PFA staff and this is alright with them.
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Details
Number: 96 Created: 3 / 20 / 2007
[3/20/07] Please revise the hinged rack detail to make it lockable.
Topic: Drainage report
Number: 110 Created: 3 / 23 / 2007
[3/23/07] Please provide calculations in the report as to the amount of flow
assumed by JR Engineering's overall drainage plan for the Rigden farm area
going to the north and south and compare these to actual flows from this
site.
Topic: Erosion Control Plan
Number: 109 Created: 3 / 23 / 2007
[3/23/07] Please add standard City of Fort Collins erosion control notes.
Topic: Grading
Number: 94 Created: 3 / 20/ 2007
[3/20/07] Some grading is shown on the property to the north, a letter
from that property owner agreeing to such work is needed.
Topic: Utility Plans
Number: 95 Created: 3/ 20/ 2007
[3/20/071 Please provide a detail of how the storm sewer will be tied into
the existing inlet in Custer Drive.
Page 8
Number: 79 Created: 3 / 6 / 2007
[3/6/07] Please provide stationing or dimension for all driveway
intersections.
Topic: Utility Plans - Utility Plans
Number: 67 Created: 3/ 6/ 2007
[3/6/07] This might be a little difficult to make clear, but need to show the
row being vacated and the proposed row. Right now the plans still show the
old row. Please note that "ROW to be vacated by separate document:.
Number: 68 Created: 3 / 6 / 2007
[3/6/07] Some scanning issues here, not many. I've highlighted them all in
pink so you can fix them real easy. Thanks!
Number: 74 Created: 3 / 6 / 2007
[3/6/07] Please provide a detail on how you propose to tie into the back of
the inlet with the private -storm sewer.
Department: Light & Power Issue Contact: Monica Moore
Topic: Utility Plans - Utility Plans
Number: 93 Created: 3 / 20 / 2007
[3/20/071 Previous comments still apply.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 42 Created: 12 / 20 / 2006
[3/21/07] Required signage, curb paint, access and pavement continuity
shall be installed prior to the issuance of a certificate of occupancy during
final inspection.
[12/20/06] EMERGENCY ACCESS EASEMENT: Both drive aisles (private
drives), in their entirety, shall be dedicated on the plat as an emergency
access easement (fire lane), with a minimum width of 30 feet. The fire lanes
shall be visible by painting and signage, and maintained unobstructed at all
times. The homeowners association shall be responsible for maintaining the
fire lane. Contract Carie Dann for more information, 416.2869. 97UFC
901.2.2.1; 901.3; 901.4.2; 902.2.1
Number: 99 Created: 3/ 21 / 2007
[3/21/071 EMERGENCY USE OF THE TRAIL: Regarding Dave Averill's
comment #91, PFA is requiring lift -out concrete bollards - one bollard at
each end of the trail (two bollards total). The bollards shall meet the
requirements specified in International Fire Code Section 312 - Vehicle
Impact Protection. Also, the entire length of the trail/emergency access is
required to be capable of supporting 40 tons (fire apparatus weight), on this
property and the adjoining property, since the trail provides fire apparatus
access, and apparatus may need to gain access from either end of the trail.
Page 7
Topic: Utility Plans -Grading
Number: 18 Created: 12/ 18/2006
[3/5/07] [12/ 18/06] Need to dimension all sidewalk widths and parkways,
utility easements, EA easements, etc. You can provide a horizontal control
sheet if you like (not required) - that way the plans will be legible and scan
well.
Number: 19 Created: 12/ 18/2006
[3/5/07] Please label all slope ratios in all locations.
[12/ 18/06] Grading must be flat to nearly flat for a minimum of 2' behind
the sidewalk. Grades can not exceed 4:1 where affecting public row. Some
slopes are not meeting that requirement and some slopes are not labeled.
Number: 69 Created: 3 / 6 / 2007
[3/6/07] Same comment from the utility sheet - Some scanning issues
here, not many. I've highlighted them all in pink so you can fix them real
easy. Thanks!
Number: 71 Created: 3 / 6/ 2007
[3/6/07] The proposed 10' sidewalk that is tying into New Dawn will be
hard to install to the property line as the angle creates this narrow little
sliver. This will be a maintenance problem later on when the other property
tries to match into it. You'll need to coordinate with this property owner
anyway because they are not required to install a structural sidewalk for
their project while yours does. New Dawn is only responsible for the 10'
wide concrete sidewalk while Brooklyn needs to construct the structural
sidewalk for the entire length. Your development may want to build the
sidewalk in its entirety and then file a repay against New Dawn for the
regular sidewalk portion. Or you could work this out with them directly.
Think about it and then call me.
Number: 72 Created: 3 / 6 / 2007
[3/6/07] Offsite grading has been proposed. Rather than providing an
actual easement, Stormwater has agreed that a letter from New Dawn
approving the grading changes is fine. OR, New Dawn needs to show your
proposed grading on their plan sets as I've requested several times and that
will avoid the need for any letter at all.
Number: 76 Created: 3 / 6/ 2007
[3/6/07] Please provide spot elevations for all lot corners.
Number: 77 Created: 3/6/2007
[3/6/07] Please provide the statement: The top of the foundation elevations
shown are the minimum elevations required for protection from the 100-
year storm.
Page 6
Topic: Utility Plans - Cover
Number: 64 Created: 3 / 6 / 2007
[3/6/07] Only need to provide the current month and year in the project
date on the cover sheet.
Topic: Utility Plans - Detail Sheet 8
Number: 73 Created: 3 / 6 / 2007
[3/6/071 Detail S3 is showing the 10' sidewalk to be 3000psi only, no
reinforcing. This sidewalk was supposed to be a structural sidewalk
capable of withstanding 40ton to accommodate the emergency access
vehicles.
Number: 106 Created: 3 / 22 / 2007
[3/22/07] Troy - I gave the red -lines back too fast ... I don't remember if I
finished checking these sheets. I can do it with the next submittal and if
we're missing anything, you can change things without another round if this
is the only thing stopping us from mylars.
Topic: Utility Plans - Drainage 8s Erosion Control
Number: 78 Created: 3 / 6 / 2007
[3/6/07] Please see Stormwater for the appropriate erosion control and
revegetation notes. These can be placed either on the General Notes sheet
OR the erosion control sheet.
Topic: Utility Plans - General
Number: 65 Created: 3 / 6 / 2007
[3/6/07] The city signature block needs two more lines in it, one for
Natural Resources and a blank one, all sheets.
Number: 70 Created: 3 / 6/ 2007
[3/6/07] The proposed driveway and sidewalk line weights are very thin
and light - it makes it hard to distinguish them from the existing. Please
"beef' them up a little, thanks.
Number: 80 Created: 3 / 6/ 2007
[3/6/07] Great first Final Compliance submittal!! Thank you very much for
your hard work - I appreciate the effort you put into it.
Number: 82 Created: 3/6/2007
[3/6/07] Please show the bollards in the utility plan set so that the
contractors will be sure to install them. Thank you.
Topic: Utility Plans - General Notes
Number: 75 Created: 3 / 6/ 2007
[3/6/07] Please reference the current soils investigation report.
Page 5
Topic: Plat
Number: 10 Created: 12/ 18/2006
[3/5/07] Please provide a legal description and an exhibit for the area of
row you wish to vacate and I can get those ready to take to Council.
[12/ 18/06] ROW can not be vacated by plat, only by council. We will need
an exhibit and legal description for the area to be vacated with the Final
Compliance submittal.
Number:.66 Created: 3 / 6 / 2007
[3/6/07] Eliminate the word "public" from the access easement.
Number: 88 Created: 3 / 6 / 2007
[3/6/07] The 12' access easement on the north side needs to be an access
and emergency access easement.
Number: 102 Created: 3 / 22 / 2007
[3/22/07] From Technical Services: Boundary and legal close.
Number: 103
[3/22/071 From Technical Services:
along Kansas Drive.
Number: 104
[3/22/07] From Technical Services:
Collins Council #XXXXX.
Created: 3 / 22 / 2007
Missing boundary and easement info
Created: 3/22/2007
Vacation note: By resolution of Fort
Number: 105 Created: 3 / 22 / 2007
[3/22/07] From Technical Services: Question: Should the emergency
access easements also be defined as Public (Private) Access and 20'
emergency access?
Topic: Site Plan
Number: 85 Created: 3 / 6 / 2007
[3/6/07] Please use engineering scale and not architectural.
Number: 86 Created: 3 / 6 / 2007
[3/6/07] The easements do not match the plat.
Number: 87 Created: 3 / 6/ 2007
[3/6/07] Please correct all overlapped labeling.
Number: 89 Created: 3 / 6 / 2007
[3/6/07] Please show the trash containers shown on the landscape plans.
Page 4
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 9 Created: 12/ 18/2006
[3/5/07] The project title does not match on all plan sets.
[ 12 / 18 / 061 Please title all plan sets to match the title on the plat (the title
on the plat is correct, the rest are wrong). Also, the plat says 12th filing and
everything else says 14th filing - which one is correct?
Number: 11 Created: 12 / 18/ 2006
[3/5/07] Please show the proposed New Dawn improvements to the north
and how your improvements are tying into them.
[12/ 18/06] Need to show existing features (sidewalks, driveways, ped
ramps, etc) within 150' of the project limits. Please show all existing and
proposed developments within these limits. You may call the engineers or
site planners involved with the other projects to have them email you the
auto -cad files (they are required to do the same of your project).
Number: 16 Created: 12/ 18/2006
[3/5/07] [12/ 18/06] Need to show existing and proposed for a minimum of
150' of the project limits. Please coordinate with New Dawn and the rest to
show how all of your projects are tying into each other.
Number: 20 Created: 12/ 18/2006
[3/5/07] Please dimension the parkways and sidewalks so that I can
determine that the standard is being met. This is a basic requirement of all
plan sets.
[12/ 18/06] Please design sidewalk widths, parkway widths, etc in
accordance with 7-6F, 7-9F and 7-5F.
Number: 81 Created: 3 / 6 / 2007
[3/6/07] Easements need to match the plat.
Topic: Landscape Plan
Number: 83
[3/6/07] Show all bollards.
Number: 84
[3/6/07] See redlines.
Number: 90
[3/6/07] Please label the trash racks.
Created: 3 / 6 / 2007
Created: 3 / 6 / 2007
Created: 3/6/2007
Page 3
This condition references the appropriate site lighting section in the City's
Land Use Code (LUC). The applicable Final Plans (Elevations, Lighting 8s
Photometric) do not show any exterior front entry lighting. Is this the intent
of the Applicant/Developer? If there is to be lighting in these locations then
it must be presented now to enable City staff to review it against the LUC
and condition of PDP approval. Note 1 on the Lighting 8s Photometric Plan
states:
"Luminairs mounted at unit entries to be limited to 60 watts where not
shielded. Final selection to be determined by Owner 8s Architect.
Switched front entry lighting not shown."
This note does not satisfy the language of the condition of PDP approval.
City staff will not approve the Rigden Farm 12th Filing, Brooklyn Park
Rowhouses, Phase 2 - Final Plans until the exterior front entry light fixtures
can be adequately reviewed against the LUC and condition of PDP approval.
Number: 113 Created: 3 / 23 / 2007
[3/23/071 This is Rigden Farm, 12th Filing (not 14th). Please change title to
reflect this. Also, remove the reference to Phase 2, PDP from the sheet titles.
Topic: Site Plan
Number: 31 Created: 12 / 19 / 2006
[3/20/071 The widths of the walks are now shown but the sidewalks along
Custer Drive, Iowa Drive, and Kansas Drive are not labeled as such.
[12/ 19/06] No sidewalks are labeled, with widths of walks.
Number: 33 Created: 12/ 19/2006
[3/20/071 Please label the current uses existing, approved, or proposed on
the sites to the north, west, and east (see red -lined Site Plan).
[12/ 19/06] No context of what is on the adjacent properties to the north,
west, and east is provided on the Site Plan.
Topic: Utility Plans - General
Number: 107 Created: 3 / 23 / 2007
[3/23/071 Don Kapperman of Comcast Cable indicated that it looks like
there is a 9' wide utility easement on the east side of Iowa Drive that is
behind the sidewalk. This would be more than enough to place Comcast
facilities in to feed the project. Due to the City requirements, any above -
grade pedestals need to be 2' behind the sidewalks.
Page 2
6aSTAFF PROJECT REVIEW
Cityaf FoA Collins
M. Torgerson Architects Date: 03/23/2007
c/o Troy Jones
204 Walnut Street, Suite D
Fort Collins CO. 80524
Staff has reviewed your submittal for RIGDEN FARM, 12TH FILING,
BROOKLYN PARK ROWHOUSES - FINAL PLANS, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 114 Created: 3 / 23 / 2007
[3/23/07] On the Site Plans, Landscape Plan, and Building Elevations,
please remove the reference to Phase 2 in the titles.
Topic: Landscape Plan
Number: 98 Created: 3 / 21 / 2007
[3/21/071 Please see the comments and marked -up Landscape Plan from
Tim Buchanan, the City Forester.
Number: 108 Created: 3 / 23 / 2007
[3/23/071 Is the.landscaping proposed at the ends of the buildings facing
the streets adequate to properly screen the utility boxes and meters?
Number: 111 Created: 3 / 23 / 2007
[3/23/07] Additional street trees are needed along Iowa Drive and Kansas
Drive, near the corners of the development. Please see the red -lined
Landscape Plan.
Number: 112 Created: 3 / 23 / 2007
[3/23/07] The standard "Landscape Assurance" note must be added to the
Landscape Plan. See red -lined plan.
Topic: Lighting Plan
Number: 92 Created: 3/ 20/ 2007
[3/20/071 There was a condition of Project Development Plan (PDP)
approval, dated February 13, 2007, that stated:
"At the time of Final Plan, the Applicant shall provide exterior front
entry light fixtures with glazing of sufficient opacity to reduce glare
consistent with the requirements of Section 3.2.4(D)."