Loading...
HomeMy WebLinkAboutRIGDEN FARM, 14TH FILING - FDP - 56-98AS - CORRESPONDENCE - (3)Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 81 Created: 4/ 10/2007 [4/ 10/07] Correct sizes of valves on fire lines as noted in red -lined plans. Number: 82 Created: 4/ 10/2007 [4/ 10/07] There is are electric and cable conflicts with the fire hydrant near Lot 3. Number: 83 Created: 4/ 10/ 2007 [4/ 10/07] Add the City details for water main lowerings. Number: 84 Created: 4 / 11 / 2007 [4/ 11/07] Clarify phasing. If it does not apply to utilities, make that very clear. The development plans are in a very good condition. The comments expressed in this letter could be addressed with direct contact with appropriate City staff, if needed, and then mylars could be prepared and submitted. Be sure and return all red -lined plans when you re -submit paper copies (see Revision Routing Sheet, attached) or submit mylars. • A copy of a letter received from Lisa Thieme of the Larimer County Assessor's office is attached to this comment letter. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Aftsw_ Steve Olt City Planner cc: Susan Joy Interwest Consulting Group Current Planning file #56-98AS Page 5 drive aisles, it shall be protected by approved bollards. Please run turning templates (semi -tractor trailer trucks) to ensure clearance. The four -foot distance from the curb that was mentioned at Staff Review today is not the standard PFA uses. Finally, fire hydrants are required to have 42 inches of clearance (circumference) around the hydrant, which applies to light poles, vegetation (other than ground cover), etc. [ 1 / 10/ 07] FIRE HYDRANTS: Due to the proximity of the two fire hydrants in the parking lot to vehicle traffic, the hydrants shall be protected by a suitable number and location of protective bollards. Number: 85 Created: 4 / 11 / 2007 [4/ 11/07] KNOX BOX REQUIRED: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 97UFC 902.4; PFA BUREAU POLICY 88-20 Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Plat Number: 87 Created: 4/ 13/2007 [4/ 13/07] The plat vacates the existing 80-foot drainage easement across the site. There is a note on the plat showing a new -foot easement to be dedicated on Lot 9. Please clarify that this new 5-foot easement will be rededicated by this plat. Topic: Utility Plans Number: 80 Created: 4/ 10/2007 [4/ 10/07] Will the existing storm drainage junction box need to be adjusted at the rim in order to meet the new grading? The existing rim elevation is 27.13 while the new rim elevation is 29.40. Please provide an adjustment detail. How will the inlet within the future development phase be protected in the interim phase. Protection needs to be mainly vegetative. Please extend the mulching/ seeding time line for Phase 2 on erosion control construction sequence table. Please add a detail for the proposed sidewalk chases. Silt fence delineation is hard to find since it is overlapping other labels. Please clarify. Page 4 Number: 77 Created: 4 / 9 / 2007 [4/9/07] Detail Sheets - Please label all on -site details as "on site". Thanks. Number: 78 Created: 4 / 9 / 2007 [4/9/07] Detail Sheet - I will e-mail you the most current pedestrian ramp detail so that you can replace details 1606 and 1607 with it. Department: Light & Power Issue Contact: Monica Moore Topic: Utility Plans Number: 79 Created: 4 / 9 / 2007 [4/9/07] Transformer location for Lot 7 must be within 10-feet of a paved surface accessible by an electric line truck. Department: PFA Issue Contact: Carte Dann Topic: Fire Number: 30 Created: 1 / 10/ 2007 [4/ 11/07] Per our discussion, the FDCs will be building -mounted and located on the street side of the structures (externally, not internally, on the parking lot side). [1/10/07] FDC LOCATION: Please call me so we can discuss locations of the automatic sprinkler fire department connections. Number: 31 Created: 1 / 10/2007 [4/ 11 / 07] Because all the buildings have fire sprinklers; every point of the first -floor exterior walls are within 150 of a public street; and the FDCs will be located on the public -street sides of the buildings, PFA will not require an Emergency Access Easement. [1/ 10/07] EMERGENCY ACCESS EASEMENT: Willa blanket EAE be workable, or should it be revised to specific drive aisles? The fire lane shall be visible by painting and signage, and maintained unobstructed at all times. The fire lane must meet the following general requirements: ❑ Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. ❑ Have appropriate maintenance agreements that are legally ❑ Maintain the required minimum width of 20 feet throughout the length of the fire lane. 97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1 Number: 32 Created: 1 / 10/2007 [4/11/07] External to the site, there are 7 fire hydrants on Iowa, Illinois, Limon and Custer, so no fire hydrants will be required to be added on the public -street side of the buildings. Internally, in the parking lot, we will require only one fire hydrant. This fire hydrant needs to be located on a suitable traffic island where it will not be exposed to damage from vehicular traffic. If the hydrant is located within a 25-foot inside turning radius of the Page 3 Number: 76 Created: 4 / 9 / 2007 [4/9/07] Please provide a barricade after Phase I construction is complete that would block off the driveway access to Phase II. This way people won't be trying to cut across the site (and they will). Topic: Landscape plan Number: 69 [4/9/07] Please show phasing. Topic: Plat Number: 86 [4/ 12/07] From Technical Services: Created: 4/9/2007 Created: 4 / 12 / 2007 1. Boundary and legal close. One bearing does not match in C 1 curve. 2. Basis of bearings monument descriptions of N 1 /4 corner do not match the plat. Topic: Site Number: 70 Created: 4 / 9 / 2007 [4/9/07] Please show phasing. Topic: Utility Plans Number: 71 Created: 4 / 9 / 2007 [4/9/07] Remove all reference to Preliminary Plan, not for construction prior to mylar. Number: 72 Created: 4 / 9 / 2007 [4/9/07] Sheet 3 - Please add a few more notes or labels clarifying the installation/phasing of the sidewalks and onsite utilities. I just want to make sure there won't be any confusion later as we write the DA, DCP and then eventually go to construction. Thanks so much, Bob! Number: 73 Created: 4 / 9 / 2007 [4/9/07] Sheet 4 - See red -lines regarding Note 2. Good note ... would you mind duplicating it under line 48, too? Thanks!! Number: 74 Created: 4 / 9 / 2007 [4/9/07] Sheet 9 and typical - the little @ signs will turn into blobs when scanned. Could you reduce the pen width perhaps? It should scan fine then. Number: 75 Created: 4 / 9 / 2007 [4/9/07] Sheet 11 - Will need to phase this sheet too if the storm inlet isn't getting installed with Phase 1. Page 2 STAFF PROJECT REVIEW City of Fort Collins Don Tiller Date: 04/ 18/2007 LADCO PROPERTIES, LLC 1201 Chickadee Court Fort Collins, CO 80525 Staff has reviewed your submittal for RIGDEN FARM, 14TH FILING, THE CENTER AT RIGDEN FARM - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Site Number: 88 Created: 4/ 18/2007 [4/ 18/07] There was a bike rack previously shown just to the west of the building on Lot 2, along Illinois Drive. This rack has apparently been eliminated. It really should remain to provide accessible bike parking for the buildings on Lots 1 & 2. Nothing (landscaping, utilities) would appear to preclude this bike rack. Number: 89 Created: 4/ 18/2007 [4/ 18/07] The 2 crosswalks in the northerly 8' wide walk (just south of Lots 2 & 10) should be constructed of concrete. This is the public walkway between developments in Rigden Farm. Number: 90 Created: 4/ 18/2007 [4/ 18/07] It would be beneficial to show better line (weight) differentiation between the lot lines, the buildings, and sidewalks on the Site & Landscape Plans. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 68 Created: 4 / 9 / 2007 [4/9/07] Please add a note to all of the plan sets stating that the City and Utility companies approved the location of the trash enclosures within the blanket utility easement. A good place for this note on the utility plan set would be under line 48 of the General Notes. You can word this note any way you wish, just want to make sure that you won't have trouble later at the time of building permit. Chad - do you think it would be appropriate to put this note on the plat as well? Page 1