Loading...
HomeMy WebLinkAboutRIGDEN FARM, TENTH FILING - PDP - 56-98AB - CORRESPONDENCE -Current Planning DATE: March 30, 2005 REVISION COMMENT SHEET TO: Comcast RECEIVED APR 0 t, 7005 PROJECT: #56-98AB Rigden Farm, 10" Filing, Sp&f U t NING Senior Housing PDP All comments must be received by Steve Olt no later than the staff review meeting: April 13, 2005 Note -.Please identify your redlines for future reference ❑ No Problems Problems or Concerns (see below or attached) Comcast Cable will require a completed contract with our Commercial Accounts Executive, Reneta Santroro, before we can build to this complex. Also as we discussed in the meeting we will need to have 2- inch conduits run through the building to communication rooms so that the length of the service lines are 125 feet or less. Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS >lat Site _Drainage Report _Other _Utility Redline Utility -XL,andscape City of Fort Collins Topic: Utility Plans Number: 32 Created: 2/25/2005 [4/12/05] Water mains within the city of Fort Collins Service area are to be constructed with Ductile Iron Pipe. Clearly define this on the plan set. [2/25/05] Water services may not be PVC from the main to a point 5 feet downstream of the meter pit. Number: 38 Created: 2/25/2005 [4/12/05] [2/25/05] Show all water and sewer lines on the landscape plans. Include the standard general notes on the landscape plans pertaining to landscape/utility separation distance and utility locates prior to planting Page 2 Project Comments Sheet City of Fort Collins Selected Departments Department: Water Wastewater Date: April 13, 2005 Project: RIGDEN FARM SPECTRUM SENIOR HOUSING, YfTH FILING All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 13, 2005 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General Number: 64 Created: 4/12/2005 [4/12/05] Maintain 4 feet minimum separation between the curb stop/meter pits and all building envelopes. Number: 65 Created: 4/12/2005 (4/12/05] Extend sanitary sewer main to the north in order to provide separate sanitary sewer service for each unit. Provide a utility easement for this extenion Number: 66 Created: 4/12/2005 [4/12/05] See site, landscape and utility plans for other comments. Issue Contact: Roger Buffington Topic: Utility Plans Number: 30 Created: 2/25/2005 [4/13/05] Water services have been changed. Sewer servcices to duplex and triplex units must be revised as previously noted (i.e. separate service for each unit from unit to public sewer main. [2/25/05] Provide separate water/sewer services for each unit in the duplexes and the triplex. The water services may be split at the normal curb stop location with individual curb stops and meter pits installed for each unit at that point (use the City detail). The sewer services for each unit must be separate to the public sewer main. Issue Contact: Jeff Hill ' Signature U Da e CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility :X Landscape Page 1 REVISION COMMENT SHEET Current Planning DATE: March 30, 2005 TO: Technical Services PROJECT: #56-98AB Rigden Farm, loth Filing, Spectrum Senior Housing PDP All comments must be received by Steve Olt no later than the staff review meeting: April 13, 2005 Note -.Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) LEGA po Avor4to-56. ,SA In T- Gumm TJ AS F�;_ 13 N6cD LCGZ�NO As To (j NAT lJa� E A L-) rrA2�'S Name (please print) CH . Cy HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site _Drainage Report _Other Utility _Redline Utility _Landscape fto City of Fort Collins ,1 Topic: Plat Number: 19 Created: 2/22/2005 [4/12/05] Please make sure all proposed storm drainage lines are placed within a drainage easement, as of right now not all of them have been shown to be within one. [2/22/05] Please place the proposed storm line near the entrance on Kansas Drive within a drainage easement. Page 2 Project Comments Sheet Ell City of Fort Collins Selected Departments Department: Stormwater Utility Date: April 12, 2005 p Project: RIGDEN FARM SPECTRUM SENIOR HOUSING, .?fTH FILING All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 13, 2005 Note - Please identify your redlines for future reference Issue Contact: Basil Hamdan Topic: Construction Timing Number: 17 Created: 2/22/2005 [4/12/05] Stubbed out facilities need to be coordinated with the construction of the surrounding streets. [2/22/05] Please coordinate the construction of facilities that serve this development with he construction of Iowa Drive, it is recommended that stub outs be done for this project by the contractor building the Iowa Drive storm sewer in order to minimize future street cuts. Topic: Drainage Number: 15 Created: 2/22/2005 [4/12/05] Please include a section in the narrative part of the report regarding what flows were directed to what basin, and how these relate to the flows assumed by the Rigden Farms 6th Filing model. [2/22/05] The report calculates percent of imperviousness for this site. However no comparison is made to what percentages were used in the modeling of Rigden Farm Filing 6 which is the most up to date model for this area. Please provide tables in text of report what was assumed in the Filing 6 model and discuss how this site fits within those modeling criteria. Check for flows from this site and compare to flows accounted for in the Rigden Filing 6 drainage model. Topic: Hearing Number: 63 Created: 4/12/2005 [4/12/05] Remaining sorm drainage issues are considered resolved from a preliminary level, and this item is OK for a hearing from our standpoint. Signat I ke Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1 Project Comments Sheet City of Fort Collins Selected Departments Department: Engineering Date: April 15, 2005 Project: RIGDEN FARM, �H FILING, SPECTRUM SENIOR HOUSING PDP All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 13, 2005 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 68 Created: 4/15/2005 [4/15/05] The coordination with JR Engineering to have utilities installed and ensure street cuts are minimized/prevented on Limon and Iowa Drive is appreciated. Please also verify/coordinate the curb and gutter installation to ensure that curb and gutter does not have to be removed (with possible street cuts resulting) in order to have the access ramps poured with this project. Number: 69 Created: 4/15/2005 [4/15/05] No objection to proceeding with a public hearing. A full routing will be needed at time of final plan submittal. D to (,CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat ✓ Site Drainage Report Other Utility Redline Utility Landscape Page 1