DATE: March 30, 2005
REVISION
COMMENT SHEET
TO: Comcast
RECEIVED
APR 0 t, 7005
PROJECT: #56-98AB Rigden Farm, 10" Filing, Sp&f U t NING
Senior Housing PDP
All comments must be received by Steve Olt no later than the staff
review meeting:
April 13, 2005
Note -.Please identify your redlines for future reference
❑ No Problems
Problems or Concerns (see below or attached)
Comcast Cable will require a completed contract with our Commercial Accounts
Executive, Reneta Santroro, before we can build to this complex.
Also as we discussed in the meeting we will need to have 2- inch conduits run through
the building to communication rooms so that the length of the service lines are 125 feet or
less.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
>lat Site _Drainage Report _Other
_Utility Redline Utility -XL,andscape City of Fort Collins
Topic: Utility Plans
Number: 32 Created: 2/25/2005
[4/12/05] Water mains within the city of Fort Collins Service area are to be constructed with
Ductile Iron Pipe. Clearly define this on the plan set.
[2/25/05] Water services may not be PVC from the main to a point 5 feet downstream of the
meter pit.
Number: 38 Created: 2/25/2005
[4/12/05]
[2/25/05] Show all water and sewer lines on the landscape plans. Include the standard
general notes on the landscape plans pertaining to landscape/utility separation distance and
utility locates prior to planting
Page 2
Project Comments Sheet
City of Fort Collins Selected Departments
Department: Water Wastewater
Date: April 13, 2005
Project: RIGDEN FARM SPECTRUM SENIOR HOUSING, YfTH FILING
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
April 13, 2005
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 64 Created: 4/12/2005
[4/12/05] Maintain 4 feet minimum separation between the curb stop/meter pits and all
building envelopes.
Number: 65 Created: 4/12/2005
(4/12/05] Extend sanitary sewer main to the north in order to provide separate sanitary
sewer service for each unit. Provide a utility easement for this extenion
Number: 66 Created: 4/12/2005
[4/12/05] See site, landscape and utility plans for other comments.
Issue Contact: Roger Buffington
Topic: Utility Plans
Number: 30 Created: 2/25/2005
[4/13/05] Water services have been changed. Sewer servcices to duplex and triplex units
must be revised as previously noted (i.e. separate service for each unit from unit to public
sewer main.
[2/25/05] Provide separate water/sewer services for each unit in the duplexes and the
triplex. The water services may be split at the normal curb stop location with individual curb
stops and meter pits installed for each unit at that point (use the City detail). The sewer
services for each unit must be separate to the public sewer main.
Issue Contact: Jeff Hill '
Signature U Da e
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility :X Landscape
Page 1
REVISION
COMMENT SHEET
Current Planning
DATE: March 30, 2005 TO: Technical Services
PROJECT: #56-98AB Rigden Farm, loth Filing, Spectrum
Senior Housing PDP
All comments must be received by Steve Olt no later than the staff
review meeting:
April 13, 2005
Note -.Please identify your redlines for future reference
❑ No Problems
❑ Problems or Concerns (see below or attached)
LEGA po Avor4to-56.
,SA In T- Gumm TJ AS F�;_ 13
N6cD
LCGZ�NO
As To (j
NAT lJa�
E A L-)
rrA2�'S
Name (please print)
CH . Cy
HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
Utility _Redline Utility _Landscape
fto
City of Fort Collins
,1
Topic: Plat
Number: 19
Created: 2/22/2005
[4/12/05] Please make sure all proposed storm drainage lines are placed within a drainage
easement, as of right now not all of them have been shown to be within one.
[2/22/05] Please place the proposed storm line near the entrance on Kansas Drive within a
drainage easement.
Page 2
Project Comments Sheet
Ell
City of Fort Collins Selected Departments
Department: Stormwater Utility
Date: April 12, 2005 p
Project: RIGDEN FARM SPECTRUM SENIOR HOUSING, .?fTH FILING
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
April 13, 2005
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Construction Timing
Number: 17 Created: 2/22/2005
[4/12/05] Stubbed out facilities need to be coordinated with the construction of the
surrounding streets.
[2/22/05] Please coordinate the construction of facilities that serve this development with he
construction of Iowa Drive, it is recommended that stub outs be done for this project by the
contractor building the Iowa Drive storm sewer in order to minimize future street cuts.
Topic: Drainage
Number: 15 Created: 2/22/2005
[4/12/05] Please include a section in the narrative part of the report regarding what flows
were directed to what basin, and how these relate to the flows assumed by the Rigden
Farms 6th Filing model.
[2/22/05] The report calculates percent of imperviousness for this site. However no
comparison is made to what percentages were used in the modeling of Rigden Farm Filing 6
which is the most up to date model for this area. Please provide tables in text of report what
was assumed in the Filing 6 model and discuss how this site fits within those modeling
criteria. Check for flows from this site and compare to flows accounted for in the Rigden
Filing 6 drainage model.
Topic: Hearing
Number: 63 Created: 4/12/2005
[4/12/05] Remaining sorm drainage issues are considered resolved from a preliminary level,
and this item is OK for a hearing from our standpoint.
Signat I ke Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
Project Comments Sheet
City of Fort Collins Selected Departments
Department: Engineering
Date: April 15, 2005
Project:
RIGDEN FARM, �H FILING, SPECTRUM SENIOR HOUSING PDP
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
April 13, 2005
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 68 Created: 4/15/2005
[4/15/05] The coordination with JR Engineering to have utilities installed and ensure street
cuts are minimized/prevented on Limon and Iowa Drive is appreciated. Please also
verify/coordinate the curb and gutter installation to ensure that curb and gutter does not
have to be removed (with possible street cuts resulting) in order to have the access ramps
poured with this project.
Number: 69 Created: 4/15/2005
[4/15/05] No objection to proceeding with a public hearing. A full routing will be needed at
time of final plan submittal.