HomeMy WebLinkAboutEAST RIDGE C-STORE - PDP - 33-98G - CORRESPONDENCE - (3)COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES
Fort Collins Neighborhood & Building Services
City of Fort Coll i,,, 281 N. College Ave., P.O. Box 580; Fort Collins, CO 80522-0580; Voice: 970 2216760 FAX: 970 224 6134
Codes and Standards
City of Fort Collins adopted codes applicable to all construction.
Residential - Includes single family, duplex and property -line townhomes
2003 International Residential Code with local Amendments
2005 Fort Collins Residential Energy Code (IRC chapter 11 amended entirely)
Accessibility -State Law CRS 9-5 (4 or more units in one building or more than 7 units in one
project) designed per ICC/ANSI Al17.1-1998
Wind Load: 100- MPH 3 Second Gust Exposure to be determined site specific
Roof Dead Load: 15 PSF min.
Snow Load Live Load: 30 PSF min.
Ground Snow Load 30 PSF
Frost Depth 30 inches
Seismic Design Category B
Commercial & Multi -family
1997 Uniform Building Code with local Amendments,
2003 International Mechanical Code w/Amendments
2003 International Fuel Gas Code w/Amendments
2003 International Plumbing Code
2005 National Electrical Code
Fort Collins Nonresidential Energy Code, an amended version of ASHRAE/IES 90.1-1989
Fort Collins Multi -family residential energy code, 1995 Model Energy Code with amendments
Accessible and Usable Buildings and Facilities, ICC/ANSI Al 17.1-1998, State Law CRS 9-5
Wind Load: 100-MPH Exposure B or 90-MPH Exposure C
Roof Dead Load: 15 PSF min.
Snow Load Live Load: 30 PSF min.
Ground Snow Load 30 PSF
Frost Depth 30 inches
Seismic Zone 1
Pre -submittal Code Review Meeting Required
For All New Commercial 8t Multi -family prior to submitting for building permit
To schedule a Pre-submittial Code Review Meeting, call 416-2741.
For questions regarding City of Fort Collins Zoning, call 416-2745.
For questions regarding Contractor Licensing rules call Delynn Coldiron at 221-6767.
11,14 5/�/0,6
6a.PROJECT
City of Fort Collins COMMENT SHEET
Current Planning
DATE: March 21, 2007
TO: Building Inspection
PROJECT PLANNER: STEVE OLT
#33-98G EAST RIDGE C-STORE PDP TYPE - II
Please return all comments to the project planner no later than the staff
review meeting:
April 11, 2007
Note -.Please identify Your redlines for future reference
❑ No Problems
❑ Problems or Concerns (see below, attached, or DMS)
FLU' --SE ND ?-CT/KCttEL�> Tli tE f�fPL1GP4SLE
GC7 5 STP�rslpv ' The r:;k)lL'PN CG Pf�T't�TN1�tT
ITT E T-kA>✓ F-E0\j ► F—e FP--F'— SU&M l TT&-L
MEETI>\fG WITH OU12-- P*_0',0'-TME"T
[7�I C/T— L-ri= -L-sl1
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape City of Fort Collins
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Ave
Steve Olt
City Planner
cc: Susan Joy
TST Engineers
Illumination Planning, Ltd.
Current Planning file #33-98G
Page 7
Number: 25 Created: 4 / 11 / 2007
[4/ 11/07] ADDRESS NUMERALS: Address numerals shall be visible from
the street fronting the property, and posted with a minimum of six-inch (6)
numerals on a contrasting background. (Bronze numerals on brown brick
are not acceptable). 97UFC 901.4.4
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: General
Number: 22 Created: 4/ 10/2007
[4/ 10/07] No comments.
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 1 Created: 4 / 6 / 2007
[4/6/07] Provide dimensions on buildings and canopy on the Site Plan.
Number: 2 Created: 4 / 6 / 2007
[4/6/07] Remove ground sign location from Site Plan, as there is a separate
approval/permit required for signage.
Number: 3 Created: 4/6/2007
[4/6/07] Indicate ramped areas on sidewalk.
Number: 4 Created: 4 / 6 / 2007
[4/6/07] Landscape Plan needs to contain language that no CO/TCO will
be issued without landscape completion or security for 125% of remaining
landscaping to be completed in form of bond, letter of credit, or escrow.
This represents staff (and outside reviewing agencies) review and comments
at this time. Additional comments and red -lined plans may be forthcoming.
• Darwin Williams of the ELCO Water District indicated that their
comments have been made on red -lined utility plans that have been
returned directly to the developer's engineer.
There are several issues that must be resolved before this item can go the
Planning and Zoning Board for a decision; therefore, another round of staff
review is determined to be necessary. This proposal is subject to the 90-
day revision re -submittal requirement (from the date of this comment
letter, being April 17, 2007) as set forth in Section 2.2.11(A) of the
Land Use Code. Be sure and return all red -lined nlans when you re -submit.
The number of copies of each document to re -submit is shown on the
attached Revision Routing Sheet.
Page 6
Topic: Utility Plans - General Notes
Number: 14 Created: 4/ 10/2007
[4/ 10/07] There seems to be some missing general notes as only 39 out of
48 are shown.
Number: 17 Created: 4/ 10/2007
[4/ 10/07] Please provide the notes as shown in Appendix E2 in addition to
El.
Topic: Utility Plans -Grading
Number: 16 Created: 4/ 10/2007
[4/ 10/07] Remove Note 1 on this and all other sheets. This plan set needs
to be "stand alone".
Number: 18 Created: 4/ 10/2007
[4/ 10/07] Please provide the statement: The top of foundation elevations
shown are the minimum elevations required for protection from the 100-
year storm.
Number: 20 Created: 4/ 10/2007
[4/ 10/07] There is too much drainage shown over the sidewalk at the
driveways. The grading needs to be in accordance with 707 - in other
words, the HP is at the row. Everything behind the row needs to drain back
into the site, everything at the row towards the street needs to drain back to
the street. See table 8-1 for curb return radii requirements.
Topic: Utility Plans - Utility
Number: 19 Created: 4/ 10/2007
[4/ 10/07] Please label and dimension all row and easements.
Department: PFA Issue Contact: Carte Dann
Topic: Fire
Number: 23 Created: 4 / 11 / 2007
[4/ 11/07] FUEL TANK REQUIREMENTS: Poudre Fire Authority requires
cut sheets to be submitted for the fueling system (tanks, pipes, etc.). Also,
permits are required for UST installation, and PFA shall complete on -site
inspections during tank, pipe and dispenser installation.
Number: 24 Created: 4/ 11 / 2007
[4/ 11 /07] CANOPY CLEARANCE: Minimum clearance under the canopy for
emergency apparatus is 14 feet.
Page 5 -
then show as existing on this plan set OR show as proposed with this
development and show all appropriate street cuts. Keep in mind that any
street cut within 5 years of installation or rehab requires triple street cut
fees.
Number: 8 Created: 4 / 9 / 2007
[4/9/07] This project can not complete the DA or receive an approved set of
mylars until the East Ridge improvements have been completed. If this
project needs to go sooner, than it will be responsible for constructing all
street frontage plus the offsite design as required by LCUASS, chapter 7.
Number: 9 Created: 4 / 9 / 2007
[4/9/07] Please see Appendix E6 for scanning requirements. I've
highlighted problem areas in pink on the plan sets to give you an idea of
what they're looking for.
Number: 10 Created: 4 / 9 / 2007
[4/9/07] There is a street light shown in the middle of the drive aisle off
Vicot Way on the Site Plan but it is NOT shown on any other plan set. Do
you really want the light in the middle like that?
Number: 11 Created: 4 / 9 / 2007
[4/9/07] The driveway exiting the car wash will encourage people to pull
head on into oncoming traffic. Suggest realigning it a little to make it more
of a stop condition - see red -lines.
Number: 12 Created: 4 / 9 / 2007
[4/9/07] There is a private irrigation line shown running down the middle
of a public alley. This is not allowed in public row and will need to be
realigned onto private property.
Number: 13 Created: 4 / 9 / 2007
[4/9/07] Please design and construct driveways in accordance with 707.
Number: 21 Created: 4/ 10/2007
[4/ 10/07] Remove all reference to Preliminary, not for construction, etc.
Topic: Plat
Number: 28
[4/ 12/07] From Technical Services:
Created: 4/ 12/2007
Minor Scanning issues, see redlines.
Topic: Utility Plans - Cover Sheet
Number: 15 Created: 4/ 10/2007
[4/ 10/07] Legend - Please use greyscale for existing and black for
proposed.
Page 4
Number: 31 Created: 4/ 17/2007
[4/ 17/07] The minimum building height for non-residential buildings in
the LMN - Low Density Mixed -Use Neighborhood District is 1.5 stories. This
should be noted on the Site Plan and demonstrated on the Building
Elevations.
Number: 33 Created: 4/ 17/2007
[4/ 17/07] The topography lines could be removed from the PDP Site Plan
(not necessary) and must be removed from the Final Site Plan.
Number: 34 Created: 4 / 17 / 2007
[4/ 17/07] There appears to be a light pole in the middle of the entry drive
at the northeast corner of the site on the Site Plan.
Number: 35 Created: 4/ 17/2007
[4/ 17/07] Please "fade out" the storm sewer lines on the Site Plan. They are
too dominant and distracting to other information.
Number: 40 Created: 4/ 17/2007
[4/ 17/07] The right-in/right-out access, with pork chop, to the site from
Sykes Drive as shown will not adequately control the traffic movement in
this location.
Number: 41 Created: 4/ 17/2007
[4/ 17/07] With a car parked at the proposed vacuum location it would
appear that traffic movement and flow in this area would be very awkward.
It could become a real "pinch point" if a car is fueling on the north side of
the northerly set of pumps.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 5 Created: 4/9/2007
[4/9/07] Project title needs to be consistent on all plan sets.
Number: 6 Created: 4 / 9 / 2007
[4/9/07] The driveway off Sykes does not conform to the spacing
requirements as shown on Table 7-3 and will not be allowed. Please take
both accesses off Vicot Way and submit the appropriate variance request if
driveway spacing is not met there either.
Number: 7 Created: 4 / 9 / 2007
[4/9/07] All plan sets need to be designed as if East Ridge has been built
out so show everything that is to be built by East Ridge as existing
(greyscale) and black for everything that this project is proposing to be built.
Will need to provide stub outs for all utilities on the East Ridge plans and
Page 3
Topic: Landscape Plan
Number: 36 Created: 4/ 17/2007
[4/ 17/07] The standard Landscape Assurance note (install or secure with
125% of value of materials and labor ...) must be added to the Landscape
Plan.
Number: 37 Created: 4/ 17/2007
[4/ 17/07] On the Landscape Plan, for clarity, there is a label for the
Existing Irrigation Lateral that would be better located down in the area of
Sykes Drive (see red -lined plan).
Number: 38 Created: 4/ 17/2007
[4/17/07] Technically speaking, Section 3.2.l(D)(3) Minimum Species
Diversity of the LUC would allow a maximum of 50% of any one species of
tree in the development plan. In this case that would be 50% of 17 trees, or
8.5 (rounded down to 8, as the City does) Ash or Honeylocust. Is there an
acceptable alternative to 1 or 2 of the Ash trees?
Topic: Lighting Plan
Number: 39 Created: 4/ 17/2007
[4/ 17/07] Sections 3.2.4(C) & (D) of the LUC sets forth the allowable
lighting levels for a development, including around and under a canopy.
Maximum under -canopy area lighting (initial installation) is 26.0 foot-
candles; and, maximum under -canopy area lighting (average maintained) is
20.0 foot-candles. There are several spots shown on the Lighting &
Photometric Plan under the canopy that exceed 26.0 foot-candles, whether
they are initial installation or average maintained. Many of the spots, if they
are average maintained levels, are too high. Please clarify. Also, there are
many spot foot-candle levels shown just outside the canopy lines that
exceed the maximum allowed on -site lighting levels of 10 foot-candles. The
under -canopy lights must be fully recessed into the structure's "ceiling",
assuring that the lights will be down -directional.
Topic: Site Plan
Number: 30 Created: 4/ 17/2007
[4/ 17/07] The convenience store building does not satisfy the "build -to"
line requirement, relative to Vicot Way and Sykes Drive, as set forth in
Section 3.5.3(B)(2)(b) of the LUC. Therefore, a request for a modification of
this standard must be submitted immediately for City staff and Planning &
Zoning Board review. The Board will be the ultimate decision maker. The
applicant's request and justification must be supported by the criteria set
forth in Section 2.8.2(H) of the LUC.
Page 2
fi STAFF PROJECT REVIEW
City of Fort Collins
Jim Sell Design, Inc Date: 04/ 17/2007
c/o Matt Blakely
153 West Mountain Avenue
Fort Collins, CO 80528
Staff has reviewed your submittal for EAST RIDGE C-STORE, PDP - TYPE
2, and we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Pete Wray
Topic: Fire
Number: 26 Created: 4/ 12/2007
[4/ 12/07] Confirm location and separation of convenience retail w/fuel
sales is at least 3/4 mile from any other such use, per Land Use Code (LUC)
Section 4.5(3)(c)(1).
Number: 27 Created: 4/ 12/2007
[4/ 12/07] Proposed use is consistent with East Ridge ODP and East
Mulberry Corridor Plan for LMN land use incorporating a neighborhood
center to show at least two uses from list in LUC Section 4.5(B)(2)(c)3.
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations Plan
Number: 32 Created: 4/ 17/2007
[4/ 17/07] The Conceptual Architectural Elevations Plan as provided with
the Project Development Plan (PDP) submittal is sufficient at this phase of
development review. However, with the Final Compliance submittal the
building elevations must be more defined for this particular site and the
plan must show heights, materials, and "general" colors to be used. The
canopy over the gas tanks must be designed with a shallow -pitched roof,
false mansard or parapet that matches the building.
Topic: General
Number: 29 Created: 4/ 17/2007
[4/ 17/07] The applicant must demonstrate how this neighborhood center
satisfies Section 4.5(B) (3) (C) 1 of the LUC. It proposes a convenience retail
store w/fuel sales and a car wash. Looking at Sections 4.5(13)(2)(c)3 and
4.5(B) (3) (c) 1, requiring at least 2 uses defined in these sections, it appears
that the proposed convenience retail store w/fuel sales use is the only (one)
use out of the permitted uses in a neighborhood center. A car wash is not
listed in either section.