HomeMy WebLinkAboutSTORYBOOK 2ND FILING - PDP - 49-98B - DECISION - FINDINGS, CONCLUSIONS & DECISIONi
N
Storybook 2nd PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 31, 2005
Page 5 of 5
F.Section 3.6.4 — Transportation Level of Service
Based on the Applicant's Transportation Impact Study (TIS) nearby intersections
will not be impacted in any significant manner by the traffic generated by the
Project and that the resulting increase in traffic will fall well within the adopted
Level of Service (LOS) standards at the intersections.
There was no evidence introduced at the hearing to contradict the Staff Report;
therefore, the Hearing Officer finds that the Project Development Plan is in
conformance with the applicable requirements found in Article 3 of the Land Use
Code except the Model Variety requirements as noted above.
SUMMARY OF CONCLUSIONS
A. The Storybook, 2"d Filing, Project Development Plan is subject to administrative
review and the requirements of the Land Use Code (LUC).
B. The Storybook, 2"d Filing, Project Development Plan satisfies the development
standards of the LMN zoning district.
C. The Storybook, 2"d Filing, Project Development Plan complies with all applicable
General Development Standards contained in Article 3 of the Land Use Code,
except for Section 3.5.1(C) where a condition of approval has been added in
order to satisfy this standard.
DECISION
The Storybook, 2"d Filing Project Development Plan, #49-98B
is hereby approved by the Hearing Officer subject to the following condition:
The Applicant shall vary the building materials to greater distinguish between the three
housing types. The Applicant shall submit revised building elevations showing such
building material changes for the review, and subject to the approval, of the Current
Planning Department in conjunction with the Final Plan.
Dated this 7th day of April 2005, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
meron Glosv- -
rrent Planning Director
Storybook 2nd PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 31, 2005
Page 4 of 5
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
A. Section 3.3.1 [B] — Lots
The proposed lots comply with the design standards in that they have vehicular
access to a public street. The subdivision design does not impact the layout of
roads, driveways, utilities, drainage facilities and other services necessary to
serve the Project.
B. Section 3.3.1 [C] (1) - Public Sites, Reservations, and Dedications
The plat indicates the proper dedication for street rights -of -way for internal local
streets, and drainage, utility, and access easements needed to serve the Project.
C. Section 3.5.1 [B] — Architectural Character
Section 3.5.1 of the LUC requires that new developments be compatible with the
established character of the area. Pursuant to this section, the proposed
buildings will be similar in mass, bulk and scale with single family and multi -family
buildings in the immediate area.
D. Section 3.5.2 [C] — Housing Model Variety
Any development of fewer than one hundred (100) single-family and two-family
dwelling units must provide at least three different types of housing models. In
order to distinguish between each model type, buildings must employ at least
three characteristics, including different floor plans, exterior materials, roof lines,
garage placement, placement of the footprint on the lot, and/or building face.
While the applicant has provided some variation in building massing, primarily
through use of different roof forms, minor variations in fenestration and
architectural details, the use of a brick base and upper lap siding treatment on all
units creates housing types that are virtually indistinguishable.
In order to comply with this standard, the Hearing Officer has placed a condition
on the project approval, requiring that the applicant provide a greater variety of
building materials to distinguish between the building models, while still being
complementary to the existing 1st Filing Storybook PDP.
E. Section 3.5.2 [D] — Building Setbacks
The Plan complies with the 15 foot minimum setback required from non -arterial
streets.
Storybook 2nd PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 31, 2005
Page 3 of 5
FACTS AND FINDINGS
1. Site Context/Background Information
N: LMN-Undeveloped (Poudre R-1 School District)
S: LMN-Undeveloped (Poudre R-1 School District)
E: LMN-Undeveloped
W: LMN-Residential (Storybook)
The property was annexed in August, 1983 as part of the Country Club East
Annexation, and part of the East Vine Drive 7th Annexation.
On August 11, 1999, the Director of Planning approved the Storybook PDP (Type
1) development request for 66 dwelling units (4 single-family detached and 62
two-family dwellings) on 16.6 acres.
On January 14, 2005, the Administrative Hearing Officer approved, with one
condition, a request for modifications of standards set forth in Subsection
3.6.3(D) and Subsection 3.6.3(F) of the LUC.
2. Compliance with Article 4 and the LMN Zoning District Standards:
The Project complies with the applicable standards found under Article Four of
the Land Use Code. The applicant's request complies with the following
standards:
Section 4.4(D) — Land Use Standards
The Project Development Plan complies with all applicable requirements of
Article 4 and the LMN zone district. The Staff Report summarizes the PDP's
compliance with these standards and no specific evidence was presented to
contradict or otherwise refute the compliance with Article 4 or the LMN District
Standards. In particular, the proposed detached single family and attached two-
family dwelling units are permitted within the LMN zone district subject to an
administrative review.
The PDP, with a gross residential of 5.5 dwelling units per acre, and net
residential density of 6.3 dwelling units per acre, complies with the minimum net
density and maximum gross density prescribed for the zoning district.
Storybook 2nd PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 31, 2005
Page 2 of 5
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 6:00 p.m. on March 31, 2005 in the Advance Planning
Department Conference Room, 281 N. College Avenue, Fort Collins, Colorado. This
hearing was continued from the original published date of March 24, 2005.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of the public hearing. The LUC, the City's Comprehensive
Plan (City Plan), and the formally promulgated policies of the City are all considered
part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Steve Olt, City Planner
Pete Wray
From the Applicant:
Ken Forbes
Jack Blake
From the Public:
Gary Mackey, 6804 Aaron Dr.
Written Comments:
None.
City of Fort Collins
Comm, ty Planning and Environmenta: 2rvices
Current Planning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE:
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
March 24, 2005 continued to March 31,
2005
Storybook, 2"d Filing PDP
Stewart & Associates
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO 80521
Nebarado Construction, Inc.
c/o Jack Blake
6804 Aaron Drive
Fort Collins, CO 80524
Cameron Gloss
Current Planning Director
The Applicant has submitted a request to construct 76 single-family detached and two-
family dwelling units (patio homes and duplexes) on 13.9 acres. The buildings will be
up to 29 feet in height and each dwelling unit will contain two bedrooms. Access will be
provided from Little John Lane via Mountain Vista Drive. The property is located on the
north side of Mountain Vista Drive (E. County Road 50, just east of the existing
Storybook development.
SUMMARY OF HEARING OFFICER DECISION: Conditional Approval
ZONING DISTRICT: LMN — Low Density Mixed -Use Neighborhood
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020