HomeMy WebLinkAboutLOTS 17 & 18, BLOCK 4, EVERGREEN PARK (SCOTTS AUTO RECOVERY) - PDP - 15-02 - CORRESPONDENCE -i a
Please provide a water quality outlet structure with the well screen/metal plate option rather than the
riser pipe option. Also, please provide an outlet structure detail on the plans, along with a sidewalk
chase detail and any other drainage feature details applicable to this site.
We, wAa t,( �0.i'6✓ a.+/,+�/ r�rµcti�rG � a 3/L�(�V�L .• r t6 ti I'•(qG f0C444wL(
Q4-- 4" G%4le•
Please provide a drainage easement for the limits of the detention pond.
6ufci,"e-j +keetit.-i f 41 rApawrtfG )mAwY ~-~--
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Site Plan
Per code, locations where detached sidewalks exist directional access ramps are required at
intersections. l�.vc �� ^ILr AeGter.wl..✓.L JTILe Qccers V--OV /J •k 1/ tt fA[ C.+y
4C—bo»If- +kc rw.p U).#4%i.4 4 yfe".
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility plan
&4-3—
If fire hydrant is not being relocated then remove thrust block detail from detail sheets.
See site, landscape and utilityplans for other comments.The, h?dri- it no+ kei-1 rc. lle-+e
7�c �4►...ri blo..t DLIFi!� I w.0 tak.., of�l.
If you have any questions regarding these comments or the scheduled hearing date and time, please
feel free to call me at 221-6341.
YoursTruly,
Steel o ��
City Planner
Page 2
City o(Fort Colline
Stewart & Associates
c/o Dick Rutherford
103 South Meldrum Street
Fort Collins, CO. 80521
STAFF PROJECT REVIEW
Date: 1/10/2003
Staff has reviewed your submittal for EVERGREEN PARK, SCOTT'S AUTO RECOVERY PDP-
TYPE 1 (LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
22
Based on the comments received from City staff and outside reviewing agencies, and the condition of
the revised plans, this development request may be scheduled for an administrative public hearing. A
hearing officer has been identified and a date of Wednesday, January 22, 2003 is set. The time
for the item to be heard is 5:00 p.m. in conference rooms C & D at 281 North College Avenue.
These final comments are for the purpose of making sure that all issues are resolved and changes
completed by the hearing date. Please have 3 folded copies of all final documents to me no later than
Friday, January 17`'. A rendered copy of the Site and/or Landscape Plans would be most helpful to
show at the public hearing.
Department: Engineering
Topic: Utilityplan
4(f
Issue Contact: Dave Stringer
No issues, need to accept right of way addition by separate document with hearing officer
administratively.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
.1/
Light & Power Development Charges will apply at such time as electric service is required to this
site. Contact Doug Martine at 224-6152 if any questions.
Department: PFA Issue Contact: Michael Chavez
Topic: Utilityplan
ds--
After reviewing PFA has no comments.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
19—
Please provide a larger outlet pipe with an orifice plate to control the release rate. The 30-foot long 3-
inch diameter pipe will most likely clog within a short period of time.
Loe- ad-da-4 10r', P.PG 4 a 3.5" OPI^IN-' i..
Page 1