Loading...
HomeMy WebLinkAboutLOTS 17 & 18, BLOCK 4, EVERGREEN PARK (SCOTTS AUTO RECOVERY) - PDP - 15-02 - CORRESPONDENCE -i a Please provide a water quality outlet structure with the well screen/metal plate option rather than the riser pipe option. Also, please provide an outlet structure detail on the plans, along with a sidewalk chase detail and any other drainage feature details applicable to this site. We, wAa t,( �0.i'6✓ a.+/,+�/ r�rµcti�rG � a 3/L�(�V�L .• r t6 ti I'•(qG f0C444wL( Q4-- 4" G%4le• Please provide a drainage easement for the limits of the detention pond. 6ufci,"e-j +keetit.-i f 41 rApawrtfG )mAwY ~-~-- Department: Transportation Planning Issue Contact: Tom Reiff Topic: Site Plan Per code, locations where detached sidewalks exist directional access ramps are required at intersections. l�.vc �� ^ILr AeGter.wl..✓.L JTILe Qccers V--OV /J •k 1/ tt fA[ C.+y 4C—bo»If- +kc rw.p U).#4%i.4 4 yfe". Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility plan &4-3— If fire hydrant is not being relocated then remove thrust block detail from detail sheets. See site, landscape and utilityplans for other comments.The, h?dri- it no+ kei-1 rc. lle-+e 7�c �4►...ri blo..t DLIFi!� I w.0 tak.., of�l. If you have any questions regarding these comments or the scheduled hearing date and time, please feel free to call me at 221-6341. YoursTruly, Steel o �� City Planner Page 2 City o(Fort Colline Stewart & Associates c/o Dick Rutherford 103 South Meldrum Street Fort Collins, CO. 80521 STAFF PROJECT REVIEW Date: 1/10/2003 Staff has reviewed your submittal for EVERGREEN PARK, SCOTT'S AUTO RECOVERY PDP- TYPE 1 (LUC), and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General 22 Based on the comments received from City staff and outside reviewing agencies, and the condition of the revised plans, this development request may be scheduled for an administrative public hearing. A hearing officer has been identified and a date of Wednesday, January 22, 2003 is set. The time for the item to be heard is 5:00 p.m. in conference rooms C & D at 281 North College Avenue. These final comments are for the purpose of making sure that all issues are resolved and changes completed by the hearing date. Please have 3 folded copies of all final documents to me no later than Friday, January 17`'. A rendered copy of the Site and/or Landscape Plans would be most helpful to show at the public hearing. Department: Engineering Topic: Utilityplan 4(f Issue Contact: Dave Stringer No issues, need to accept right of way addition by separate document with hearing officer administratively. Department: Light & Power Issue Contact: Doug Martine Topic: Electric .1/ Light & Power Development Charges will apply at such time as electric service is required to this site. Contact Doug Martine at 224-6152 if any questions. Department: PFA Issue Contact: Michael Chavez Topic: Utilityplan ds-- After reviewing PFA has no comments. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage 19— Please provide a larger outlet pipe with an orifice plate to control the release rate. The 30-foot long 3- inch diameter pipe will most likely clog within a short period of time. Loe- ad-da-4 10r', P.PG 4 a 3.5" OPI^IN-' i.. Page 1