[4/10/06] A meeting with the FCLWD is strongly suggested to discuss water service.
Response: The developer has had several conversations with the District about water
service. They have agreed to serve the site.
Number: 19 Created: 4/10/2006
[4/10/06] Sewer will be a challenge. Some preliminary surveying may be needed to
identify the best direction for the area.
Response: After investigating the various sewer alternatives and meeting with City staff,
a route has been selected towards the south. A new sewer carrier pipe will be installed
in the abandoned horizontal elliptical pipe under Harmony Road, and connected to an
existing manhole on the First National Bank property. The bank has indicated a
willingness to provide the necessary easements as shown on the Preliminary Utility
Plan. We've contacted several casing spacer manufacturers concerning custom
spacers for the application. It appears that custom spacers for both the sewer and storm
are feasible.
This alternative offers the most cost-effective solution, while providing gravity flow for the
project and avoiding the risks associated with a new bore under either Harmony or
Timberline.
12
Draining to the west in the ROW to the drainage outfall system in Golden Meadows
seems to be the best option, although it isn't exactly a short distance across the property
and railroad to the west.
The other option still being explored is the irrigation pipe for the Dixon Canyon Lateral
that used to cross Harmony Rd. to the south. So far, all indications are that it is
abandoned and ends somewhere under Harmony. Since the Preliminary Design Review
meeting, the applicant's consultant and City staff have field investigated the pipe and
possible crossing points of the pipe. None were found. The City inspector for the
Harmony/Timberline intersection improvements and the ditch company superintendent
think the pipe is abandoned and ends under Harmony Rd. The only way to confirm this
is to check it out with a TV camera, which is being scheduled.
Response: As per our subsequent discussions, a storm route to the south is being
proposed. A 15-inch SDR35 carrier pipe will be installed in the existing abandoned
irrigation pipe to carry flow to the First National Bank property. The bank has indicated a
willingness to provide.the necessary drainage easement as shown on the Preliminary
Utility Plan.
5. The Warren Lake Reservoir Company will need to approve the construction plans.
They are also the company to contact concerning official abandonment of the Dixon
Canyon Lateral. The culvert crossing of the lateral for access into the property to the
east may no longer be needed since the lateral is not used for irrigation water. It
appears that very little water drains into it now, which is good if it ends under Harmony
Rd. There is a small portion of Harmony Rd. curb and gutter that drains into it and
maybe a little water from the property to the east as well as some from this site. John
Moen is the Superintendent (482-3309) and the Attorney is Gene Fischer (482-4710) for
the Warren Lake Reservoir Company.
Response: John Moen has confirmed that a small portion of the ditch and the irrigation
pipe under Harmony has been abandoned. The small amount of off -site flow being
collected by the abandoned irrigation pipe will be routed toward the existing borrow ditch
along Harmony Road.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/WW
Number: 16 Created: 4/10/2006
[4/10/06] Existing mains include: 16-inch water main in Timberline, 36-inch water
transmission main on south side of Harmony, 27-inch sanitary sewer on west side on
railroad north of site, 8-inch sewer in Harmony Village (south of Harmony Rd), 8-inch
sewer in Harmony School Shops (east of Timberline).
Response: Acknowledged.
Number: 17 Created: 4/10/2006
[4/10/06] This area originally developed in the county. Water service to the properties
along Harmony and to the two subdivisions to the north (west of Timberline) is provided
by the FCLWD. Many of these same properties have on site septic systems for
wastewater treatment.
Response: As discussed, the project will be obtaining water service from the Fort
Collins/Loveland Water District.
it
[4/10/06] AUTOMATIC SPRINKLERS: Because of our access concerns, both office
buildings must be equipped with monitored automatic fire sprinklers and the
accompanying Knox Box (on each structure).
Response: Acknowledged. We intend for all buildings on the site to be equipped with
automatic sprinklers.
Number: 13 Created: 4/10/2006
[4110/06] WATER SUPPLY: The fire hydrant to the east of the property is unusable for
Paws of the Rockies, because the proposed clinic/grooming sites would block us from
being able to stretch supply hose from the hydrant. Commercial structures must be
within 300 feet of a fire hydrant, and hydrants must be capable of delivering 1,500
gallons of water per minute at 20 psi residual pressure.
Response: An 8-inch water loop, with an additional fire hydrant, is proposed through the
site. In addition, the buildings will be sprinklered.
Number: 14 Created: 4/10/2006
[4/10/06] HMIA: The applicant must submit a hazardous materials impact analysis to the
Fire Department and Planning Department. Contact PFA for more information.
Response: Acknowledged.
Number: 15 Created: 4/10/2006
(4/10/06] ADDRESSING: Will each building be given an individual, numeric address, or
will it be campus addressing, with a single numeric and then lettered buildings? If
numerals and letters, lettering should be done in a clockwise fashion, if possible,
beginning with the first building we access.
Response: We intend to give each building an individual numeric address.
Department: Stonnwater-Water-Wastewater Issue Contact: Glen Schlueter
Topic: General
Number: 23 Created: 4/10/2006
[4/10/06) Stormwater Comments:
1. This site is in the Fox Meadows drainage basin. The city-wide new development fee
is $3,070.00 /acre which is subject to the runoff coefficient reduction. This fee is to be
paid at the time the building permit is issued.
Response: Acknowledged.
2. A drainage and erosion control report and construction plans are required and they
must be prepared by a Professional Engineer registered in Colorado.
Response: A drainage and erosion control report and construction plans have been
included with this submittal.
3. Onsite detention is required with a 2-year historic release rate for water quantity.
Extended detention is required for water quality treatment.
Response: Acknowledged.
4. The drainage outfall for this site is an issue that may be difficult to solve. Draining to
the north through private properties to the Timberline Wetland could be expensive,
considering how far it is and the easements needed to get to the wetland. Draining to
the east isn't an option since it is uphill. Draining to the south would require boring of
Harmony Rd. and evaluation of adding runoff to the drainage system in Harmony Village.
10
Number: 37 Created: 4/12/2006
[4/12/06] The following natural habitats and features buffers will apply (unless
determined otherwise after review of the Ecological Characterization Study). LUC 3.4.1
(E):
Isolated patch of native upland forest - 50 feet
- This isolated patch is identified on the City Natural Habitats and Features Inventory
Map and consists of the two Cottonwoods that are being evaluated for removal.
" Irrigation Ditches that serve as wildlife movement corridors - 50 feet
- During the site visit several signs (tracks, scat, burrowing) of wildlife movement
occurring along the irrigation ditch were present.
Location of possible fox den - 50 feet (this den has not been positiveiy identified as a
fox den. A determination pending study). *" NRD is still investigating what species is
currently using this den.
Response: It was determined during a follow-up meeting with Tim Buchanan and a
private arborist (Jordan's Tree Service) that the two cottonwood trees should be
removed due to the rot in the trunks of the trees, and the safety issue associated
therewith, therefore there is no "upland forest" from which to buffer. See our submitted
ecological characterization study and buffer zone reduction request regarding wildlife
movement and fox dens.
Number: 38 Created: 4/12/2006
[4/12/06] Buffer zones will be required to be re -vegetated with Fort Collins native plants
species. A plant guide may be found at http://fcgov.com/naturalareas/native-plants.php.
LUC 3.4.1 (E) (1) (g)
Response: Acknowledged. Please see our landscape plan.
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 11 Created: 4/10/2006
14/10/06) EMERGENCY ACCESS: The site plan as shown does not satisfy emergency
access needs. Because the east -west drive aisle exceeds 150 feet, we require either a
turnaround that's 100 feet in diameter or a hammerhead. We would not use the drive
aisle that is shown to access properties to the east, due to the narrowness and
overhanging trees; also, the culvert is only CMP, which would not hold a 40-ton fire
vehicle. The applicant asked if the gravel road on the east side of the property could be
improved and used for access; we would consider that but will need to see drawings
before commenting.
Response: Troy Jones followed up on this issue via telephone conversation with Carie
Dann. We -agreed on a solution where:
• all portions of our 24-foot wide drive aisle within 150 feet of driveway length from
Timberline is dedicated as an emergency access easement and called out as a
fire lane,
• buildings are no taller than 2 stories, and
• all buildings are fire sprinklered.
Number: 12 Created: 4/10/2006
9
Number: 9 Created: 4/7/2006
[4f7106] We require a C-1 Form and a one -line diagram for all proposed buildings. We
will need to coordinate a transformer location within 10' of a driveable surface.
Response: Acknowledged.
Department: Natural Resources
Topic: General
Number: 32
Issue Contact: Doug Moore
Created: 4/12/2006
[4/12/06] 1 conducted a visit to the proposed site on April 6, 2006 and determined that
the following comments will apply to the proposed development project. I met briefly
with Troy Jones on April 7, 2006 to go over these issues. Please contact me to further
discuss options available within the Fort Collins Land Use Code (LUC) that may be used
to resolve some of these issues.
Response: Acknowledged.
Number: 33 Created: 4/12/2006
[4/12/06] This project must comply with subsection 3.2.5 Trash and Recycling
Enclosures (Fort Collins Land Use Code). Please consult the City of Fort Collins Design
Considerations Guidance Document available online at
http://www.fcgov.com/recycling/pdf/enclosure- guidelines0804.pdf to determine the size
and appropriate design needed for this project.
Response: Two appropriate trash and recycling enclosures have been provided as
required. Please see the site plan.
Number: 34 Created: 4/12/2006
14/12106] Please contact Tim Buchanan (City Forester) at 221-6360, to determine the
health of the existing trees on site. If it is determined that these trees will be required to
be removed do to public health and safety issues, the Natural Resources Department
will work with the applicant to determine what mitigation will be needed to replace the
loss of existing habitat provided by the trees.
Response: We met with Tim Buchanan and a private arborist, who determined that the
trees should be removed. No mitigation is required, since the trees are not healthy
enough to merit replacement. See the submitted report from Jordan's Tree Service.
Number: 35 Created: 4/12/2006
[4/12/06) When a private certified arborist conducts the aerial inspection needed by the
City Forester, the arborist will need to be both sensitive and cautious about any possible
nesting activity. Pruning should not occur at this time due to the nesting season and
issues related to the U.S. Migratory Species Act. Even though I did not find evidence on
the ground of migratory species (such as owls) the visible nesting cavities are conducive
to these types of species.
Response: We will coordinate the timing of tree removal with Tim Buchanan.
Number: 36
Created: 4/12/2006
[4/12/06] An Ecological Characterization Study will be required. Please have the
consultant conducting this study contact me to set up a meeting on site prior to starting
the study. Fort Collins Land Use Code (LUC)3.4.1 (D) (1)
Response: An ecological study has been provided with this submittal as required.
for the future connection would have to be worked out and will
probably be dependent on how close the paved surface is brought
to the edge of the property line. The site plan should also
indicate the proposed possible connections so that there is no
question in the future about the intent to provide the cross -
access."
Please see our site plan and plat for details on this connection.
Number: 3 Created: 4/7/2006
[4/7/06] The access to the site will be Right in / Right out only.
Response: Acknowledged.
Number: 4 Created: 4/7/2006
[4/7/06] No detention is allowed in the Right of Way.
Response: Acknowledged. Our detention ponds have been set back out of the Right of
Way.
Number. 5 Created: 4/7/2006
[4/7/06] The sidewalk should be set further back into the 40' buffer area. The absolute
minimum setback from back of curb is 10' (by arterial street standards), and the
Harmony Corridor Plan supports a 30' minimum setback wherever possible.
Response: The sidewalk meanders through the buffer with a 30' setback in most areas
and a minimum setback of 11'. Because we only have a 40' setback and not the 80'
typically required in the Harmony Corridor, we are unable to provide a meandering 8'
sidewalk with an overall minimum 30' setback, but we have accommodated this
comment to the extent reasonably feasible.
Number: 6 Created: 4/7/2006
[417/06] If you would like to set up a utility coordination meeting, please contact Dan
Del-aughter at 221-6605.
Response: Acknowledged.
Topic: Light & Power
Number: 10 Created: 4/7/2006
[4/7/06] We need to see additional dimensions and linework on Harmony Rd. adjacent,
to your site to be sure that it is designed as planned, and to ensure that the proposed
access location will not cause any safety concerns.
Response: Portions of the median, striping and landscaping along Harmony were
surveyed and are shown.
Department: Light & Power Issue Contact: Rob Irish
Topic: Light & Power
Number: 7 Created: 4/7/2006
[417/06] There are existing electric facilities adjacent to the property along Harmony
Road. There is an existing 3 - phase electric vault at the southwest comer of the site.
Any modification or relocation to existing electric facilities will be at the owner's expense.
Response: Acknowledged.
Number: 8 Created: 4/7/2006
[417/06] Electric Capacity Fee and Building Site charges will apply.
Response: Acknowledged.
Response: Acknowledged.
3. A Transportation Impact Study will need to be submitted for this project. Contact
Eric Bracke at (970) 224-6062 to discuss.
Response: A Transportation Impact Study has been included with this proposal.
4. All public improvements must be made according to Larimer County Urban Areas
Street Standards (LCUASS) which can be found on the City's website at:
hftp://fcgov.com/engineedng/street-standards.php.
Response: Acknowledged.
5. Utility plans, a development agreement, a development construction permit (DCP)
and a plat will need to be prepared for this project.
Response: Utility plans and a subdivision plat are included with this submittal as
required. We look forward to working through the DA and DCP after receiving approval.
6. Additional ROW or easements may need to be dedicated to accommodate the
ultimate Harmony cross-section. These can be dedicated with the plat.
Response: All necessary easements are included with the plat.
Number: 1 Created: 4/7/2006
[4/7/06] The ultimate design of Harmony Rd. should be based on the EAST HARMONY
ROAD SOUTH TIMBERLINE ROAD HARMONY HALF ACRES IMPROVEMENT
DISTRICT streets design. Please note that the required 40' setback should be
measured from the ultimate edge of pavement.
Response: Acknowledged.
Number: 2 Created: 4/7/2006
[417/06] Cross access must be provided to both the east and west properties according
to the Harmony Rd. Access Control plan. EgLthe property to the west the only access
available from vour site that would work with the existing conditions is in the front of the
nt. The proposed access to the north would nee, since it is
the existing building.
We are providing cross access to the west property behind our vet facili
fo the south end of the existing building. A follow-up meeting was held
ghter, Kathleen Brac e, an are Dann to discuss this issue. Dan Deli
us an
"Cross- access design:
On the east, it is acceptable to provide a broad access easement
rather than an actual driveway stub to the property line. The
access easement should include enough area so that the connection
could be made either directly east or to the north. It is
acceptable to park within an access easement, and parking would
be allowed in the interim, even where the potential connection
may occur. We would work with you on getting the appropriate
language into the development agreement in order to ensure that
the future connection could be made (restrictions on landscaping
and structural features may be necessary to prevent high costs of
future demolition and construction). The responsibility for cost
6
Number: 29 Created: 4/10/2006
(4/10/06] We will want to see a carefully designed sidewalk system that is 8 feet wide,
meanders along the frontage as far from the right-of-way as is feasible, and that
interconnects with the internal pedestrian system in a logical way. ,
Response: The provided sidewalk system shown in the plan meets all of these criteria.
Number: 31 Created: 4/11/2006
[4/11/06] Kathleen Bracke from Transportation Planning comments as follows:
" 1. Need to provide for future cross -access to site west of this parcel per the Harmony
Road access plan. This access is recommended to be located on the south side of the
existing building, rather than on the north side of this site.
2. Need to provide sidewalk connections to/from the sidewalk along Harmony into their
site.
3. Location of proposed driveway entrance into site is ok, even though not exactly where
shown on the access plan. This location shown is workable."
Response: A follow-up meeting was held with Dan DeLaughter, Kathleen Bracke, and
Carie Dann in which we discussed cross access to the west. Dan Delauter sent us an
email on May 5, 2006 stating:
"Cross- access design:
On the east, it is acceptable to provide a broad access easement
rather than an actual driveway stub to the property line. The
access easement should include enough area so that the connection
could be made either directly east or to the north. It is
acceptable to park within an access easement, and parking would
be allowed in the interim, even where the potential connection
may occur. We would work with you on getting the appropriate
language into the development agreement in order to ensure that
the future connection could be made (restrictions on landscaping
and structural features may be necessary to prevent high costs of
future demolition and construction). The responsibility for
cost for the future connection would have to be worked out and
will probably be dependent on how close the paved surface is
brought to the edge of the property line. The site plan should
also indicate the proposed possible connections so that there is
no question in the future about the intent to provide the cross -
access."
Sidewalk connections have been provided. Please see our site plan and plat.
Department: Engineering Issue Contact: Dan DeLaughter
Topic: General
1. Larimer County Road Impact Fees and a City Street Oversizing Fee will apply.
Fees vary by use. Contact Matt Baker at (970) 224-6605 for an updated estimate of the
fees.
Response: Acknowledged.
2. Engineering has new development review fees that went into effect in January of
2006. For more information, see http://fcgov.com/engineering/dev-review.php
5
Number: 27
Created: 4/10/2006
[4/10/06] Landscaping is encouraged in the detention ponds and can be used to further
screen any parking visible from Harmony.
Response: Acknowledged.
Number: 30 Created: 4/11 /2006
[4/11/06] Tim Buchanan, City Forester comments as follows:
" I conducted a site visit on 4-11-06 to check the two large cottonwoods at the proposed
Paws of the Rockies at 2000 East Harmony Road.
The west tree has a large wound and hollow area on the east side of the tree. I observed
this defect but did not probe it to see the extent of decayed wood. The condition of this
tree was noted to be good in terms of live canopy and amount of bud wood. The east
tree also has a wound and hollow on the east side but smaller in size. The east tree has
a notable amount of dead wood in the crown and is in fair condition.
Structural problems were noted in both trees but from only observing from the ground
there is not enough information to decide on removal or retention. I suggest that the
applicant have a private certified arborist conduct an aerial inspection of the canopy of
the trees with a bucket truck and investigate the extent of decay in the low wounds. City
Forestry staff would like to be present when the aerial evaluation is conducted. After this
information is available the suitability of retention of these two trees can be made.
Also, I did note in a large dead branch in the east tree what appears to be an excavated
wildlife cavity."
Response: We had a follow-up meeting with Tim Buchanan and a private arborist, who
determined that the cottonwoods should be removed. Please see the attached report
from Jordan's Tree Service.
Topic: Lighting Plan
Number: 26 Created: 4/10/2006
[4/10/06] High pressure sodium lights are recommended in the corridor for a uniform
appearance.
Response: Acknowledged.
Topic: Site Plan
Number. 21 Created: 4/10/2006
[4/10/06] You will need to provide a connecting walkway as defined in the Land Use
Code to link street sidewalks with the building entries. if the site layout involves any
buildings north of the drive access, a modification will be required to the connecting
walkway standard, and mitigation measures will be required, such as an enhanced
crosswalk.
Response: Our site layout does involve one building north of the drive access; please
see the modification request included with this submittal.
Number: 28. Created: 4/10/2006
[4/10/06] Will there be any loading or service areas needed? If so, please incorporate
these into the design early on.
Response: No loading or service areas are proposed.
[4/12/061 Similar materials and colors as neighboring developments should be used per
Section 3.5.1 of the Land Use Code. Additionally, the project will be subject to the
building standards of Section 3.5.3 for Mixed -use buildings, including facade and base
and top standards.
Response: Acknowledged.
Number: 44 Created: 4/12/2006
[4/12/06] You will need to submit a lighting plan for this project, showing photometric
plot points and cut sheets for the lighting fixtures chosen. All lighting must meet the
standards contained in Section 3.2.4 of the Land Use Code, including down -directional,
fully shielded fixtures.
Response: A lighting plan has been included with this submittal.
Number: 45 Created: 4/12/2006
[4/12/061 More detailed comments will be made once we have more detailed plans to
review.
Response: Acknowledged. We look forward to further comments.
Number: 46 Created: 4/12/2006
[4/12/06] Contact me if you have any questions about the code requirements or
submittal requirements, which can be found at:
hftp:/tfcgov.com/currentplanning/pdf/project-dev-plan.pdf.
Response: Acknowledged.
Number: 47 Created: 4/12/2006
[4/12106] You will need to set up an appointment to submit your application with Tara
Leman, our Planning Tech in Current Planning at 221-6750. Incomplete submittals will
not be accepted.
Response: Acknowledged.
Number: 22 Created: 4/10/2006
[4/10/06] Please clarify drawings and line weights before submittal.
Response: Acknowledged.
Topic: Architecture Plan
Number. 25 Created: 4/10/2006
[4/10/06) All elevations must be constructed of high quality materials. All mechanical
equipment must be screened.
Response: Acknowledged.
Topic: Landscape Plan
Number: 24 Created: 4/10/2006
[4/10/06] Refer to the Harmony Corridor Plan for specifics on the type of plantings
required in this zone district. As the landscaping is one of the hallmarks of this Corridor,
we will look to this project to meet these standards. Plant types that are emphasized
include oaks, groupings of coniferous trees, large areas of wildflowers and large areas of
daffodils.
Response: Acknowledged. A landscape plan has been included with this submittal and
uses plant types required by the Harmony Corridor Plan.
3
and structural features may be necessary to prevent high costs of
future demolition and construction).. The responsibility for
cost for the future connection would have to be worked out and
will probably be dependent on how close the paved surface is
brought to the edge of the property line. The site plan should
also indicate the proposed possible connections so that there is
no sr=a—in the ru
access.'
Please see our site plan and plat.
4) Not sure. You will need to provide additional information. Please see both Tim
Buchanan and Doug Moore's comments.
Response: A follow-up meeting was held with Tim Buchanan and our own arborist; it has
been determined that the trees should be removed. See the submitted report from
Jordan's Tree Service.
5) No, this does not qualify as a "community shopping center" as defined in the Harmony
Corridor Plan.
Response: Acknowledged.
Please refer to the individual reviewers comments for more detail.
Topic: Standard Comments
Number. 39 Created: 4/12/2006
(4/12/06] The entire Fort Collins Land Use Code (LUC) is available for your review on
the web at http://www.colocode.com/ftcollinsAanduse/begin.htm
Response: Acknowledged.
Number: 40 Created: 4/12/2006
[4/12/06] This development proposal is subject to all applicable standards of the Fort
Collins Land Use Code (LUC), specifically Article 3 General Development Standards,
and Division 4.21 HC-Harmony Corridor District.
Response: Acknowledged.
Number: 41 Created: 4/12/2006
14/12/06] A neighborhood meeting is suggested but not required before submitting your
formal application. If you choose to hold a neighborhood meeting, please contact me to
arrange the meeting.
Response: We conducted a neighborhood meeting June 21, 2006 with Anne Aspen of
the Current Planning Department.
Number: 42 Created: 4/12/2006
[4/12/06] Please refer to Section 3.2.1 Landscaping and Tree Protection of the Land
Use Code (LUC) for landscape planning and design standards. Specifically, you'll need
to provide street trees, foundation plantings and parking lot perimeter and internal
landscaping. The parking stalls facing roads or adjacent uses will need to be screened.
Be aware of any sight distance triangles needed.
Response: A landscape plan has been provided according to the criteria presented in
Section 3.2.1 of the Land Use Code.
Number: 43 Created: 4/12/2006
F-0
2
Preliminary Desian Review Comment Responses —
Paws of the Rockies P.D.P.
City staff offered the following comments based on the sketch plan presented to the
Preliminary Design Review Team on Wednesday, April 5, 2006:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 20 Created: 4/10/2006
[4/10/061 In response to the questions you posed to us, the quick answers are as
follows:
1) Yes, a 40-foot setback is acceptable. This was always envisioned for these shallow
lots. A modification is needed, but it can be concurrent to the PDP and it will have staff
support.
Response: Our plan uses a 40-foot setback; see the modification request included with
this submittal.
2) This issue needs more investigation. See Glen's comments for more information.
Response: This issue has been further investigated; please see our responses to Glen's
comments below.
3) Yes and No: The access to the east is acceptable to Engineering, Transportation
Planning and Planning, but PFA has concerns about it. Please see Carie's comment
#11. Cross access to the west must also be included in your design. Staff has reviewed
this issue and has concluded that cross -access needs to be provided in such a way that
the existing building to the west can be accessed by it, which means that the access
must be located further south. To avoid the effect of a frontage road, staff recommends
that the access be brought behind the vet building, since the kennel portion is not
allowable.
Response: A follow-up meeting was held with Dan DeLaughter, Kathleen Bracke, and
ICarie Dann in which we discussed cross access to the west. Dan Delauter sent us an
email on May 5, 2006 stating:
.AAD�
( "Cross- access design:
On the east, it is acceptable to provide a broad access easement
�u,T fA rather than an actual driveway stub to the property line. The
access easement should include enough area so that the connection
could be made either directly east or to the north. It is
lip acceptable to park within an access easement, and parking would
be allowed in the interim, even where the potential connection
may occur. we would work with you on getting the appropriate
language into the development agreement in order to ensure that
the future connection could be made (restrictions on landscaping