HomeMy WebLinkAboutPAWS OF THE ROCKIES - PDP - 29-06 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (3)JUN-26-2007 09:45P FROM:QED ASSOCIATES 970-416-0601 IU:L:!6 4�4db r.If/ e
Transportation Development Review Fee Date Received/ Paid C 7-
Pa 5 0 +I �0 (�� ��� Total Amount Paid y�: r6
City of Fort Collins Project Name: Yu.- G{�
Project Location: Z003 CC ot..rnn,o Date: ZS 2170
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee structu amount
❑ Overall Development Plan (ODP) S500 each
* Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each
fl Additional round of review S 500 each
D Annexation $20 x_acres =—+$250 =
❑ Minor Amendment S250 each -
❑ Major Amendment S2,500 each `
L1 Re -zone $200 each
❑ Modification to band Use Code S200 each
❑ Wireless Telecommunication Equipment (WTE) $65 each
❑ Road Projects acres (of roadway) X $250 =
❑ Vacation of Eascment(s) •" $ of vacations _ X S400 =
❑ Vacation of Right(s)-of--Way `•' # of vacations _ X $800 =
r1 Dedication ofEasement(s) and/orRight(s)-of•Way "'
# of dedications _ X S250 =
+'• This fee does not include the cost of filing fees. Filing fees shall be
determined at the time of final document submittal and will be required prior
to filing.
XProject Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family $160 per unit
# of units X $160 =
Multifamily or other residential units $115 per unit
# of units X.$115 =
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
(trt'�O sq ft X $0.25 =�
Size of the development (area being platted or if not being
platted size of parcel accompanying all development r 1'
improvements) $250 per acre )too acres X $ 250 = J
Project fee $2,000 each
Total of above amounts � .10 1 7 T' So
If this fee amount exceeds S30,000 then the fee amount shall be adjusted with
the following formula:
S30,000 + %, (the amount over 30,000
The maximum fee for any residential ONLY project shall be S500 per
residential unit. This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shall be the lesser of this amount
or the above calculated amount.
# of residential units X $500 =
Reduction for affordable housing - a copy of the City letter certifying/
authorizing the affordable housing shall be provided with this application.
Amount of reduction to be applied
Total owed for PDP $ IM7?
Land Use Information:
Total number of single family detached units:
Total number of multifamily/other residential units: O
Total number of certified affordable dwelling units (a copy
of the letter/ authorization is required): O
Non residential building square footage: 1 O sq ft
Gross Acreuge: _I - C. Cc acres
General Information:
Owners Name(s): PA w S Q{ -F Ra Ckle5
V'un.
l 90 S.D,
Streetaddress:
U vt J-:t G 2.
City/State/Zip: F-&� Col tt M 5 L G 9o.9Z,-
Telephone:1c2.ro -15%1;?Fax: ZZ3- ygR(o
Applicants/ Consultants Firm Name: M T
Contact: TVNf
Street address: '- i,4_Jot j ttiIrt
,
City/State/ Zip: 1 I'a7 p 052y
Telephone:
Certification: nM
By signing this permit I acknowledge that I am acting 'V
with the knowledge, consent, and authority of the
owners of the property (including all owners having
legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
associated with the property which is the subject of
this application) without whose consent and authority
the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for
purposes of inspection. T
Name (please print): w Uov-e
Signature:
Telephone:
cc: Christie White, Engineering (
Development Review Engineering