HomeMy WebLinkAboutPAWS OF THE ROCKIES - PDP - 29-06 - CORRESPONDENCE - (13)Number: 18 Created: 4/10/2006
[4/10/06] A meeting with the FCLWD is strongly suggested to discuss water service.
Number: 19 Created: 4/10/2006
[4/10/06] Sewer will be a challenge. Some preliminary surveying may be needed to identify
the best direction for the area.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Anne H. Aspen
City Planner
Page 8
letters, lettering should be done in a clockwise fashion, if possible, beginning with the first
building we access.
Department: Stormwater-Water-Wastewater Issue Contact: Glen Schlueter
Topic: General
Number: 23 Created: 4/10/2006
[4/10/06] Stormwater Comments:
1. This site is in the Fox Meadows drainage basin. The city-wide new development fee is
$3,070.00 /acre which is subject to the runoff coefficient reduction. This fee is to be paid at
the time the building permit is issued.
2. A drainage and erosion control report and construction plans are required and they must
be prepared by a Professional Engineer registered in Colorado.
3. Onsite detention is required with a 2-year historic release rate for water quantity.
Extended detention is required for water quality treatment.
4. The drainage ouffall for this site is an issue that may be difficult to solve. Draining to the
north through private properties to the Timberline Wetland could be expensive, considering
how far it is and the easements needed to get to the wetland. Draining to the east isn't an
option since it is uphill. Draining to the south would require boring of Harmony Rd. and
evaluation of adding runoff to the drainage system in Harmony Village. Draining to the west
in the ROW to the drainage ouffall system in Golden Meadows seems to be the best option,
although it isn't exactly a short distance across the property and railroad to the west.
The other option still being explored is the irrigation pipe for the Dixon Canyon Lateral that
used to cross Harmony Rd. to the south. So far, all indications are that it is abandoned and
ends somewhere under Harmony. Since the Preliminary Design Review meeting, the
applicant's consultant and City staff have field investigated the pipe and possible crossing
points of the pipe. None were found. The City inspector for the Harmony/Timberline
intersection improvements and the ditch company superintendent think the pipe is
abandoned and ends under Harmony Rd. The only way to confirm this is to check it out with
a TV camera, which is being scheduled.
5. The Warren Lake Reservoir Company will need to approve the construction plans. They
are also the company to contact concerning official abandonment of the Dixon Canyon
Lateral. The culvert crossing of the lateral for access into the property to the east may no
longer be needed since the lateral is not used for irrigation water. It appears that very little
water drains into it now, which is good if it ends under Harmony Rd. There is a small portion
of Harmony Rd. curb and gutter that drains into it and maybe a little water from the property
to the east as well as some from this site. John Moen is the Superintendent (482-3309) and
the Attorney is Gene Fischer (482-4710) for the Warren Lake Reservoir Company.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterlWW
Number: 16 Created: 4/10/2006
[4/10/06] Existing mains include: 16-inch water main in Timberline, 36-inch water
transmission main on south side of Harmony, 27-inch sanitary sewer on west side on
railroad north of site, 8-inch sewer in Harmony Village (south of Harmony Rd), 8-inch sewer
in Harmony School Shops (east of Timberline).
Number: 17 Created: 4/10/2006
[4/10/06] This area originally developed in the county. Water service to the properties along
Harmony and to the two subdivisions to the north (west of Timberline) is provided by the
FCLWD. Many of these same properties have on site septic systems for wastewater
treatment.
Page 7
Number: 37 Created: 4/12/2006
[4/12/061 The following natural habitats and features buffers will apply (unless determined
otherwise after review of the Ecological Characterization Study). LUC 3.4.1 (E):
" Isolated patch of native upland forest - 50 feet
- This isolated patch is identified on the City Natural Habitats and Features Inventory Map
and consists of the two Cottonwoods that are being evaluated for removal.
` Irrigation Ditches that serve as wildlife movement corridors - 50 feet
- During the site visit several signs (tracks, scat, burrowing) of wildlife movement
occurring along the irrigation ditch were present.
` Location of possible fox den - 50 feet (this den has not been positively identified as a fox
den. A determination pending study). "` NRD is still investigating what species is currently
using this den.
Number: 38 Created: 4/12/2006
[4/12/06] Buffer zones will be required to be re -vegetated with Fort Collins native plants
species. A plant guide may be found at http://fcgov.com/naturalareas/native-plants.php.
LUC 3.4.1 (E) (1) (g)
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 11 Created: 4/10/2006
[4/10/06] EMERGENCY ACCESS: The site plan as shown does not satisfy emergency
access needs. Because the east -west drive aisle exceeds 150 feet, we require either a
turnaround that's 100 feet in diameter or a hammerhead. We would not use the drive aisle
that is shown to access properties to the east, due to the narrowness and overhanging
trees; also, the culvert is only CMP, which would not hold a 40-ton fire vehicle. The applicant
asked if the gravel road on the east side of the property could be improved and used for
access; we would consider that but will need to see drawings before commenting.
Number: 12 Created: 4/10/2006
[4/10/06] AUTOMATIC SPRINKLERS: Because of our access concerns, both office
buildings must be equipped with monitored automatic fire sprinklers and the accompanying
Knox Box (on each structure).
Number: 13 Created: 4/10/2006
[4/10/06] WATER SUPPLY: The fire hydrant to the east of the property is unusable for
Paws of the Rockies, because the proposed clinic/grooming sites would block us from being
able to stretch supply hose from the hydrant. Commercial structures must be within 300 feet
of a fire hydrant, and hydrants must be capable of delivering 1,500 gallons of water per
minute at 20 psi residual pressure.
Number: 14 Created: 4/10/2006
[4/10/06] HMIA: The applicant must submit a hazardous materials impact analysis to the
Fire Department and Planning Department. Contact PFA for more information.
Number: 15 Created: 4/10/2006
[4/10/06] ADDRESSING: Will each building be given an individual, numeric address, or will
it be campus addressing, with a single numeric and then lettered buildings? If numerals and
Page 6
Department: Light & Power Issue Contact: Rob Irish
Topic: Light & Power
Number: 7 Created: 4/7/2006
[4/7/06] There are existing electric facilities adjacent to the property along Harmony Road.
There is an existing 3 - phase electric vault at the southwest comer of the site. Any
modification or relocation to existing electric facilities will be at the owners expense.
Number: 8 Created: 4/7/2006
[4/7/06] Electric Capacity Fee and Building Site charges will apply.
Number: 9 Created: 4/7/2006
[4/7/06] We require a C-1 Form and a one -line diagram for all proposed buildings. We will
need to coordinate a transformer location within 10' of a driveable surface.
Department: Natural Resources
Topic: General
Number: 32
Issue Contact: Doug Moore
Created: 4/12/2006
[4/12/06] 1 conducted a visit to the proposed site on April 6, 2006 and determined that the
following comments will apply to the proposed development project. I met briefly with Troy
Jones on April 7, 2006 to go over these issues. Please contact me to further discuss
options available within the Fort Collins Land Use Code (LUC) that may be used to resolve
some of these issues.
Number: 33 Created: 4/12/2006
[4/12/06) This project must comply with subsection 3.2.5 Trash and Recycling Enclosures
(Fort Collins Land Use Code). Please consult the City of Fort Collins Design Considerations
Guidance Document available online at hftp://www.fcgov.com/recycling/pdf/enclosure-
guidelines0804.pdf to determine the size and appropriate design needed for this project.
Number: 34 Created: 4/12/2006
[4/12/06] Please contact Tim Buchanan (City Forester) at 221-6360, to determine the health
of the existing trees on site. If it is determined that these trees will be required to be
removed do to public health and safety issues, the Natural Resources Department will work
with the applicant to determine what mitigation will be needed to replace the loss of existing
habitat provided by the trees.
Number: 35 Created: 4/12/2006
[4/12/06] When a private certified arborist conducts the aerial inspection needed by the City
Forester, the arborist will need to be both sensitive and cautious about any possible nesting
activity. Pruning should not occur at this time due to the nesting season and issues related
to the U.S. Migratory Species Act. Even though I did not find evidence on the ground of
migratory species (such as owls) the visible nesting cavities are conducive to these types of
species.
Number: 36 Created: 4/12/2006
[4/12/06] An Ecological Characterization Study will be required. Please have the consultant
conducting this study contact me to set up a meeting on site prior to starting the study. Fort
Collins Land Use Code (LUC)3.4.1 (D) (1)
Page 5
" 1. Need to provide for future cross -access to site west of this parcel per the Harmony
Road access plan. This access is recommended to be located on the south side of the
existing building, rather than on the north side of this site.
2. Need to provide sidewalk connections to/from the sidewalk along Harmony into their site.
3. Location of proposed driveway entrance into site is ok, even though not exactly where
shown on the access plan. This location shown is workable."
Department: Engineering Issue Contact: Dan DeLaughter
Topic: General
Number: 1 Created: 4/7/2006
[4/7/06] The ultimate design of Harmony Rd. should be based on the EAST HARMONY
ROAD SOUTH TIMBERLINE ROAD HARMONY HALF ACRES IMPROVEMENT DISTRICT
streets design. Please note that the required 40' setback should be measured from the
ultimate edge of pavement.
Number: 2 Created: 4/7/2006
[4/7/06] Cross access must be provided to both the east and west properties according to
the Harmony Rd. Access Control plan. For the property to the west, the only access
available from your site that would work with the existing conditions is in the front of the
adjacent building. Since we cannot assume that the property will redevelop before the
adjacent private access is closed, this connection must be provided with your development.
The proposed access to the north would not be adequate, since it is blocked by the existing
building.
Number: 3 Created: 4/7/2006
[4/7/06] The access to the site will be Right in / Right out only.
Number: 4 Created: 4/7/2006
[4/7/06] No detention is allowed in the Right of Way.
Number: 5 Created: 4/7/2006
[4/7/06] The sidewalk should be set further back into the 40' buffer area. The absolute
minimum setback from back of curb is 10' (by arterial street standards), and the Harmony
Corridor Plan supports a 30' minimum setback wherever possible.
Number: 6 Created: 4/7/2006
[4/7/06] If you would like to set up a utility coordination meeting, please contact Dan
DeLaughter at 221-6605.
Topic: Light & Power
Number: 10 Created: 4/7/2006
[4/7/06] We need to see additional dimensions and linework on Harmony Rd. adjacent to
your site to be sure that it is designed as planned, and to ensure that the proposed access
location will not cause any safety concerns.
Page 4
Number: 27 Created: 4/10/2006
[4/10/06] Landscaping is encouraged in the detention ponds and can be used to further
screen any parking visible from Harmony.
Number: 30 Created: 4/11/2006
[4/11/06] Tim Buchanan, City Forester comments as follows:
" I conducted a site visit on 4-11-06 to check the two large cottonwoods at the proposed
Paws of the Rockies at 2000 East Harmony Road.
The west tree has a large wound and hollow area on the east side of the tree. I observed
this defect but did not probe it to see the extent of decayed wood. The condition of this tree
was noted to be good in terms of live canopy and amount of bud wood. The east tree also
has a wound and hollow on the east side but smaller in size. The east tree has a notable
amount of dead wood in the crown and is in fair condition.
Structural problems were noted in both trees but from only observing from the ground there
is not enough information to decide on removal or retention. I suggest that the applicant
have a private certified arborist conduct a aerial inspection of the canopy of the trees with a
bucket truck and investigate the extent of decay in the low wounds. City Forestry staff would
like to be present when the aerial evaluation is conducted. After this information is available
the suitability of retention of these two trees can be made.
Also, I did note in a large dead branch in the east tree what appears to be an excavated
wildlife cavity."
Topic: Lighting Plan
Number: 26 Created: 4/10/2006
[4/10/06] High pressure sodium lights are recommended in the corridor for a uniform
appearance.
Topic: Site Plan
Number: 21 Created: 4/10/2006
[4/10/061 You will need to provide a connecting walkway as defined in the Land Use Code
to link street sidewalks with the building entries. If the site layout involves any buildings
north of the drive access, a modification will be required to the connecting walkway
standard, and mitigation measures will be required, such as an enhanced crosswalk.
Number: 28 Created: 4/10/2006
[4/10/06] Will there be any loading or service areas needed? If so, please incorporate
these into the design early on.
Number: 29 Created: 4/10/2006
[4/10/06] We will want to see a carefully designed sidewalk system that is 8 feet wide,
meanders along the frontage as far from the right-of-way as is feasible, and that
interconnects with the internal pedestrian system in a logical way.
Number: 31 Created: 4/11/2006
[4/11/06] Kathleen Bracke from Transportation Planning comments as follows:
Page 3
Number: 42 Created: 4/12/2006
[4/12/06] Please refer to Section 3.2.1 Landscaping and Tree Protection of the Land Use
Code (LUC) for landscape planning and design standards. Specifically, you'll need to
provide street trees, foundation plantings and parking lot perimeter and internal landscaping.
The parking stalls facing roads or adjacent uses will need to be screened. Be aware of any
sight distance triangles needed.
Number: 43 Created: 4/12/2006
[4/12/06] Similar materials and colors as neighboring developments should be used per
Section 3.5.1 of the Land Use Code. Additionally, the project will be subject to the building
standards of Section 3.5.3 for Mixed -use buildings, including fagade and base and top
standards.
Number: 44 Created: 4/12/2006
[4/12/06] You will need to submit a lighting plan for this project, showing photometric plot
points and cut sheets for the lighting fixtures chosen. All lighting must meet the standards
contained in Section 3.2.4 of the Land Use Code, including down -directional, fully shielded
fixtures.
Number: 45 Created: 4/12/2006
[4/12/06] More detailed comments will be made once we have more detailed plans to
review.
Number: 46 Created: 4/12/2006
[4/12/06] Contact me if you have any questions about the code requirements or submittal
requirements, which can be found at: http://fcgov.com/currentplanning/pdf/project-dev-
plan.pdf.
Number: 47 Created: 4/12/2006
[4/12/06] You will need to set up an appointment to submit your application with Tara
Leman, our Planning Tech in Current Planning at 221-6750. Incomplete submittals will not
be accepted.
Number: 22 Created: 4/10/2006
[4/10/06] Please clarify drawings and line weights before submittal.
Topic: Architecture Plan
Number: 25 Created: 4/10/2006
[4/10/06] All elevations must be constructed of high quality materials. All mechanical
equipment must be screened.
Topic: Landscape Plan
Number: 24 Created: 4/10/2006
[4/10/06] Refer to the Harmony Corridor Plan for specifics on the type of plantings required
in this zone district. As the landscaping is one of the hallmarks of this Corridor, we will look
to this project to meet these standards. Plant types that are emphasized include oaks,
groupings of coniferous trees, large areas of wildflowers and large areas of daffodils.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
M TORGERSON ARCHITECTS Date: 04/12/2006
223 N. COLLEGE AVE.
FORT COLLINS, CO 80524
Staff has reviewed your proposal for PAWS OF THE ROCKIES - 2000 EAST HARMONY,
and we offer the following comments based on the sketch plan presented to the Preliminary
Design Review Team on Wednesday, April 5, 2006:
13-*tL#33
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 20 Created: 4/10/2006
[4/10/06] In response to the questions you posed to us, the quick answers are as
follows:
1) Yes, a 40-foot setback is acceptable. This was always envisioned for these shallow
lots. A modification is needed, but it can be concurrent to the PDP and it will have
staff support.
2) This issue needs more investigation. See Glen's comments for more information.
3) Yes and No: The access to the east is acceptable to Engineering, Transportation
Planning and Planning, but PFA has concerns about it. Please see Carie's comment
#11. Cross access to the west must also be included in your design. Staff has
reviewed this issue and has concluded that cross -access needs to be provided in
such a way that the existing building to the west can be accessed by it, which means
that the access must be located further south. To avoid the effect of a frontage road,
staff recommends that the access be brought behind the vet building, since the
kennel portion is not allowable.
4) Not sure. You will need to provide additional information. Please see both Tim
Buchanan and Doug Moore's comments.
5) No, this does not qualify as a "community shopping center" as defined in the
Harmony Corridor Plan.
Please refer to the individual reviewers comments for more detail.
Topic: Standard Comments
Number: 39 Created: 4/12/2006
[4/12/06] The entire Fort Collins Land Use Code (LUC) is available for your review on the
web at http:/twww.colocode.com/ftcollins/landuse/begin.htm
Number: 40 Created: 4/12/2006
[4/12/06] This development proposal is subject to all applicable standards of the Fort Collins
Land Use Code (LUC), specifically Article 3 General Development Standards, and Division
4.21 HC-Harmony Corridor District.
Number: 41
Created: 4/12/2006
[4/12/06] A neighborhood meeting is suggested but not required before submitting your
formal application. If you choose to hold a neighborhood meeting, please contact me to
arrange the meeting.
Page 1