Loading...
HomeMy WebLinkAboutLIBERTY FARMS - PDP - 31-06A - CORRESPONDENCE - TRAFFIC STUDY (3)aSTAFF PROJECT REVIEW City of Fort Collins DON TILLER Date: 09/17/2007 VIGNETTE STUDIOS 144 N MASON ST STE 2 FT COLLINS, CO 80524 Staff has reviewed your submittal for LIBERTY FARMS PDP - TYPE ll, and we offer the following comments: ISSUES: Department: Traffic Operations Issue Contact: Ward Stanford Topic: Traffic Number: 80 Created: 9/15/2007 [9/15/07] Per LCUASS Fig 8-1, a southbound left turn lane must be provided on Timberline. Number: 81 Created: 9/15/2007 [9/15/07] On sheet 2 of the Plat, Dickerson Rd is stated as 57' ROW, but drawn as an 84' ROW. Please correct labeling. Number: 82 Created: 9/15/2007 [9/15/07] What were the growth factors used in the TIS? What other TIS's were used in the evaluation of this project? Number: 83 Created: 9/15/2007 [9/15/07] Why were Lost Time adjustments used? Why was the calc'ed PHF not used in the analysis? Number: 84 Created: 9/15/2007 [9/15/07] Need to provide all LCUASS data for mini -roundabouts, plus full dimensions of interior island, truck apron, inscribed radius, lane widths (circulating and approach), ped crossing widths, splitter island, landscaping in and around Rbt, and any other pertinent design data. Number: 85 Created: 9/15/2007 [9/15/07] The reverse curves used in the northwest corner of the Rbt need to be revised to eliminate the curve C12 (as shown on pg 2 of the Plat). Vehicles do not follow a path such as the curb is shown. They will straighten it out. It becomes excess pavement collecting trash and debris. Number: 86 Created: 9/15/2007 [9/15/07] Please provide fastest path info indicating the expected circulating speed of the Rbt. Page 1