HomeMy WebLinkAboutTALON ESTATES - PDP - 42-05A - CORRESPONDENCE - (11)Number: 13 Created: 1 /3/2007
[ 1 / 3 / 07] WATER SUPPLY: Fire hydrants, where required, must be the type
approved by the water district having jurisdiction and the Fire Department.
Hydrant spacing and water flow must meet minimum requirements based
on type of occupancy. Minimum flow and spacing requirements include:
300 feet to the building, on 600-foot centers thereafter; residential within
Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not
further than 400 feet to the building, on 800-foot centers thereafter.
(Locations on the site plane are sufficient; fire hydrants must be capable of
meeting minimum flow requirements.) These requirements may be modified
if buildings are equipped with automatic fire sprinkler systems.
'/o97UFC 901.2.2.2 T/Ok,) h4s Met 4itS�q,1� ok�,r,^
Number: 14 otdqV44
Created: 1/3/2007
[1/3/07] STREET NAME: Talon Drive cannot be used, because it is too
similar to an existing street name. Also, because this street makes a 90-
degree turn, it is required to become a second, new street with a separate
name. Contact me with prospective street names and I can confirm whether
they're acceptable. X/AMes N a✓r-r3EtA) e {(p uE tb w /-Ere,57c TED 7tt,,a
Department: Transportation Planning Issue Contact: David Averill
Topic: Plat
Number: 5 Created: 1 /2/2007
[1/2/07] What type of improvements is being done to Falcon Dr.? We need
to see a sidewalk connection along (at least) one side of improved Falcon Dr.
out to Taft Hill in order to satisfy pedestrian level of service. This can be
done in a variety of ways: built in concrete in ultimate location (4.5 in
width, with 6 foot parkway - this would eligible for repay from adjacent
property owners down the road) or attached asphalt (minimum 6 feet in
width and no parkway, not eligible for future rep/ay). U1111 eV ool e&o l lv/
Tu.�Spa,4,,.lG, Rkl//5XoW d,-*4� 17-,ee i
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 15 Created: 1 /4/2007
[1/4/07] Please direct the detention pond emergency spillway to the south,
Falcon Drive right-of-way. This is standard and it will also avoid the issue _
of getting a drainage easement from the property owner to the east.oti�
Number: 16 Created: 1 /4/2007
[1/4/07] Please document how basin G flows will turn east into the
drainage swale. Also, the flows on the west side of this street need to have
an outlet with capacity and erosion protection accounted for. These flows
do not need to be detained by this development, however since this road is
proposed to be improved, a concentrated flow now exists at the edge of the
road improvements. Donn sEE
Pale 6
1
Number: 37 Created: 1 / 6/ 2007
[1/6/07] Existing utilities must fall at least 2' behind the back of walk or
they will need to be moved. Please plac a note on the utility sheet to reflect
that requirement. Wi_ 1[ Coord(01 k 4
Number: 38 Created: 1 /6/2007
[1/6/07] Detail Sheets - Label on onsite details as "on site". Replace 1603
with the new ped ramp detail which is available by email: sjoy@fcgov.com.
Sheet C2.1 is showing a concrete retaining wall - where is this being used?
C4.1 is showing a tim )Der retaining wal -which detail is correct? g 1
l30�4 i4Gfi'ttsG p,. Pv-o(ghtcf Gv.O
Number:39 Created: 1/6/2007 a�
[1/6/07] C3.O - Please provide erosion control at the north end of Falcon �4
Drive.
Number: 40 Created: 1 / 6/ 2007
[1/6/07] Plan and Profile sheets - Please show the water line (keep in mind
minimum cover requirements set forth in section 12.2.2. Show and station
all proposed driveways, provide missing slope info & missing VC info, and
for both street widenings - show, label and dimension in accordance with 7-
24. You can provide a detail off to the side if scannability becomes an issue.
(Per Mike Herzig, R1 = 20'-36') 1k,j[ ProvcdG j1t41%5 lul
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 1 Created: 12/26/2006
[ 12 / 26/ 06] The Master Utility Plan Sheet C5-0 indicates that the overhead
electric line belongs to REA. This is a City of Fort Collins electric line.
Contact Al n Rutz at 224-6153 concerning the undergrounding of this line.
w,r� 644a xi.
Number: 2 Created: 12 / 26/ 2006
[ 12 / 26/ 06] Fort Collins Light & Power will install underground electric line
between the curb and sidewalk. W1 hav( 6,y
Crvssi'?ys
Department: PFA ✓ Issue Contact: Carie Dann
Topic: Fire
Number: 12 Created: 1 /3/2007
[1/3/07] CUL-DE-SAC: A dead-end street cannot exceed six -hundred -sixty
(660) feet in length. The turn -around at the end of the street must have an
outside turning radius of fifty (50) feet or more, and an inside turning radius
of twenty-five (25) feet. Short fire lanes are permitted to facilitate a second
point of access when the street is longer than 660 feet. All structures
beyond the 660-foot limit shall be fire sprinklered if a second point of access
cannot be provided; this information shall be included on the plat.
FCLUC 3.6.2(B)(C);3.6.6(I); 97UFC 902.2.2.3
p�pSpP lf�sro., i�lCu!a �a /1�%D�e �^ [ ✓ia tx�rsh�
'1�110 Page 5
i
Number: 28 Created: 1/5/2007
w l` [1/5/07] Line weights on all plan sets should be as follows: Proposed =
p dark, existing = greyscale. Some of the pen widths are a little thick for the
font size and will not scan well.
Number: 30 Created: 1/5/2007
[1/5/07] All plan sets - Label and dimension all row and easements, and
dD label them as existing or proposed. Label all features as existing or
proposed. Provide a complete legend.
Number: 32 Created: 1/5/2007
[1/5/07] See redlines for other comments.
Number: 36 Created: 1 /6/2007
[1/6/07] All existing driveways off Falcon must be rebuilt in accordance
with 706. t fo-re 9 ^cO d +v S{ "4 P 4:P
Topic: Landscape Plans
Number:33 Created: 1/5/2007
[1/5/07] Label and dimension all row and easements.
Topic: Plat
Number: 3 Created: 1 /2/2007
[1/2/07] If the right of way for Falcon Drive is existing, then the property
line is shown incorrectly. If it is being dedicated by this plat, then it should
be labeled as such. CorrPc,ed
Number: 4
[1/2/07] Minor corrections, see redlines
Topic: Site
Number: 29
[1/5/07] Remove contours.
Created: 1 /2/2007
c or(e4Aed
Created: 1/5/2007
Topic: Utility Plans
Number:31 Created: 1/5/2007
[1/5/07] Please provide a city signature block on all sheets. ;;-61LO
Number: 34 Created: 1/5/2007
[1/5/07] All existing driveways along Falcon Drive must be built in
accordance with detail 706. fio q adwad 6
Number: 35 Created: 1 /6/2007
[1/6/07] A drainage pan is shown crossing the corner of Lot 7. A drainage
easement must be provided plus a note on the site plan must state that this
area can not be fenced by the property owner of Lot 7.
LW his 6e e7
�'I-./c�G� fv �� �l�G� V-4;.s
Page 4
A sidewalk connection to Taft Hill is required. Please show how your
proposed improvements tie into the existing._(/,'//
DK' The sidewalk must be designed and constructed for the full length of Lot 7
in order to pull a building permit. �on�
Number: 21 Created: 1 / 5/ 2007
pK-, [1/5/07] Please coordinate all comments under Site, Landscape, Plat and
Utility so that the plan sets match.
Number: 22 Created: 1 / 5/ 2007
[1/5/07] Ped ramps at thf e street widenings are not required or encouraged.
Please remove. ('f-rnot [�
Number: 23 Created: 1 / 5/ 2007
[1/5/07] T-intersections only require one ramp to the "T" versus both sides
t7r— (see redlines and figure 16-2). You can install all the ramps shown if you
wish, but it is not required.
Number: 24 Created: 1 / 5/ 2007
�]L [1/5/07] A retaining wall is show in Tract A, north side of Falcon Drive
within the UE. Please move it a little so that it's out of the utility easement.
[� Number:25 Created: 1/5/2007
b [1/5/07] See Appendix E6 for all scanning requirements.
Number: 26 Created: 1 / 5/ 2007
[1/5/07] Please see Chapter 3 of LCUASS for general requirements of plan
sets. Please complete Appendix E4 (checklist) and include all highlighted
items on the plan sets with the next submittal. Any item left incomplete will
remain an open item. All highlighted items must be complete before going
to hearing. [hill / p6lC OdE/z-
Number: 27 Created: 1 /5/2007
[1/5/07] Offsite improvements are shown east of the Detention Pond and
will require a letter of intent from the affected property owner before going to
hearing. A drainage easement will be required during Final Compliance. In
lieu of a temporary construction easement, a letter from the property owner
authorizing the work will be sufficient. The Ditch company will have to
accept the water shown draining to their ditch at this location and from the
north end of Falcon Drive. Please provide a signature block for the ditch
company on the cover sheet of the utility plans and the appropriate sheets
within the set. A letter of intent from the ditch company is required prior to
hearing with the final documents to be submitted in Final Compliance.
5�, llwu� U /l/ be jtllmmVL Sow � s7'�-
Page 3
Number: 44 Created: 1 /8/2007
�S� [1/8/07] Ed Wendel of the Pleasant Valley & Lake Canal (PV&LC)
indicated that the drainage from this property that goes to Falcon Drive
Q6rer: >0u ends up in the PV&LC at the southeast corner of the property. All of Falcon
,t^N'Y Drive tends to drain into the PV&LC.
r4f"A
Number: 45 Created: 1 /8/2007
[ 1 /8/ 07] Tim Buchanan, the City Forester, is forwarding his comments to
AdC{rrsspJhe Applicant on a marked up Landscape Plan.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 6 Created: 1 / 2 / 2007
[1/2/07] Per Conceptual Review on 4/11/05, this project is responsible for
designing the ditch crossing and for half the costs to construct it. This will
take the form of cash or a non -expiring letter of credit or bond. The
Development Agreement will state that if the bridge has not been
constructed within 10 years, then the developer will either be refunded the
cash or the LOC/Bond will be returned. A preliminary design as well as
500' of offsite preliminary design is required before hearing. Final design as
well as the estimate (for our review and approval) for the bridge is due in
Final Compliance.* ;i �� �a2 tt , Tref►�•�nwq Dec,c�„
A sidewalk connection to Taft is required on the north side of'Falcon in the
ultimate location.. !>voo
Lot 7 can not take access off Falcon Drive without a temporary 100'
turnaround. All access must be taken off Talon Drive and a note stating
D� such is required on the site and utility plans. A note on the plat is required
to such affect and that the city engineer must approve any request for a
driveway off Falcon. (I'm just thinking ahead in case some day the road
goes through and the lot owner wants additional driveway access - this way
they won't have to replat).
Type III barricades are required at all dead-end streets and sidewalks.
Because it appears that a driveway is currently taking access off the dead
end street, only the sidewalk will need a barricade, not the street.
This project is responsible for designing the full street section (including
sidewalks) on both sides of the street but only for constructing up to and
including the curb and gutter on the south and west sides of Falcon.
*Update - only show the sidewalk on the west and south sides of Falcon in
the typical street section but do not have to design it or show it in the
design.
Page 2
MUM!STAFF PROJECT REVIEW
Citv off ort Collins
Stewart 8s Associates, Inc. Date: 01/08/2007
c/o Kevin Forbes, P.E.
103 South Meldrum Street
Fort Collins, CO 80521
Staff has reviewed your submittal for TALON ESTATES, PDP - TYPE 1, and
we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Number: 41 Created: 1 / 8/ 2007
Er_ [1/8/07] Rick Lee of the Building Department indicated that they
currently enforce the 2003 IRC.
Department: Current Planning Issue Contact: Pete Wray
Topic: General
Number: 7 Created: 1/2/2007
. [ 1 / 2 / 07] No comment.
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 42 Created: 1 / 8/ 2007
[1/8/07] Bonnie Ham of the U.S. Post Office indicated that the Developer
must provide one CBU for mail delivery to the 13 residences, at an approved
location. -- is Tnc loc.a-G'� Q our o(Ps�e�,on
Number: 43 Created: 1 / 8/ 2007
[1/8/07] Tim Varrone of the City's GIS Department offered the following
comments:
a. A name change on the proposed street is needed because of duplication.
There is already a Talon Court in the City of Fort Collins limits.
- jJAL&E C jIy4N6Er:>
b. Two street names are needed because the interior street makes a 90
degree turn. There must be separate names for the north - south
portion and the east - west portion of the street.
Page 1