January 21, 2008
Mr. Steve Olt
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80525
RE: Talon Estate PDP
Second Submittal .
Dear Mr. Olt,
The Fort Collins - Loveland Water District has reviewed the above mentioned project and submits the
following comments.
The existing District water services are to be connected to the new Fort Collins water line after
the water line has been put into service. The service line connections need to be shown on the
drawings. The District's existing water line must remain in service until all water services have
been relocated. How and where the 8 inch water line is abandoned needs to be identified.
The District will require the District's standard signature block on the construction sheets that
affect District facilities.
All work on or around District facilities are to be coordinated with.the District.
The property needs to be excluded from the District boundaries. The Petition for Exclusion
packet can be obtained at the District's office
Please do not hesitate to contact me at 226-3104, ext. 104, if you have any questions or require additional
information.
Respectfully,
Mr.erry W. Farrill, P.E.
District Engineer
xc: Mr. Michael D. DiTullio, District Manager
Mr. Kevin Forbes, P.E., Stewart & Associates
pM9C TI
JAN 2 4 2008 D
By
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186
Yours Truly,
Steve Olt,
City's Project Planner
cc: Susan Joy
Nadine Holter
Planning & Zoning file #42-05B
Page 10
Number: 226 Created: 1/24/2008
[1/24/08] The greyscale may be too light to scan. Please see Appendix E6 for
minimum greyscale requirements.
Department: Light & Power Issue Contact: Alan Rutz
Topic: Plat
Number: 214 Created: 1/22/2008
[1/22/08] No additional comments.
Department: Stormwater -Water -Wastewater Issue
Contact: Wes Lamarque
D a Topic: Stormwater
Number: 232 Created: 1/25/2008
[1/25/08] Please see red -lines for remaining comments.
Department: Stormwater -Water -Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 119 Created: 3/27/2007
[1/22/081 On Sheet C5.0, add on to Utility Construction Note 16 to see Sheet
C5.2 for location (stationing) of the insulation.
[10/1/07] Is there still a need for the insulation over the water main at
Station 7+40 to 8+67?
[3/27/07] Revise grading to minimizes cuts on Falcon Drive over 16-inch water
main and thereby, eliminate the need for insulation.
Number: 215 Created: 1/22/2008 /
6,c,�, j [1/22/08] On Sheet C5.3, why is water main extending north from Falcon Drive
shown going deeper from point of tap on the 16-inch?
Be sure and return all red -lined plans with any re -submittal.
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at 221-6341.
u
Page 9
Number: 182
Created:10/5/2007
[1/24/08] Please identify and dimension the transition length (30' min). This J
comment is tied to C6.1, the plan and profile sheet. It appears that the
'b %xAO existing asphalt to the crosspan will need to be removed so that you can hit max ,
grade breaks, flow line requirements, etc.
[10/5/07] Detail 3 - the existing asphalt to the crosspan may need to be
removed and replaced in order to tie the proposed into it correctly. Until more
information is shown on the P&P, the extent of the removals are unclear.
Number: 227
Created:1/24/2008
--bb,,n:::� [1/24/08] Instead of a 10' C&G transition, start the rollover immediately at_
the ramp. Please note to remove existing C&G if it currently is in place.
Number: 237 Created: 1/25/2008
[1/25/08] Spot elevations are missing, please provide. The HP at the end of
Falcon drive needs to be at the end of the new construction so that drainage
p flows are contained within this development. Please remove the 10' C&G,
transition and start the rollover at the ramp. Will review the intersection
details in detail after the P&P sheets are corrected and the missing spots are
provided.
Topic: Utility Plans - Cover
Number: 220
Created:1/24/2008
[1/24/08] Several variances for this project were granted and need to be
listed under line 48 of the General Notes. Please state the Lorimer County
DbA--'t�' Urban Area Street Standards section and standard and then state what the
variance was granted for. Please include items such as the attached walk, wider '
parkway widths, minimum cover over structures in the road., manhole in the walk
and the inlet that was allowed to stay versus adding two type R's. I think I have
everything covered - can you think of anything else?
Topic: Utility Plans - Details
Number: 225 Created: 1/24/2008
[1/24/08] Please remove figure 7-27 as it is only a detail used for design "'� requirements, not construction. Your intersection details are providing this
information.
Page 8
this size will cost approximately $90-110k, plus another $15k in design costs,
based on projects recently built in the city.
[10/5/07] This development is responsible for escrowing the cost of the
sidewalk to the end of the property, the sidewalk curb chase and half the cost
of constructing the bridge. An estimate will be required for our review and
approval and that amount will be placed in the Development Agreement due at
first building permit.
Number: 164 Created: 10/5/2007
-D,s zo [1/24/08] Please identify crown transition length for the crosspan, label cross
slope of the crosspan (.5% minimum).
[10/5/07] Previous comments from other P&P sheets apply here.
Number: 236 Created: 1/25/2008
[1/25/08] Note 15 - please correct the misspelling.
Topic: Utility Plans - 6.4���� ,
Number: 223 Created: 1/24/2008
(Sbcr_ & (1/24/08] Minimum VC requirements are not being met ... will need a variance
where not hitting 75'.
Topic: Utility Plans - 6.5
Number: 181
Created:l0/5/2007
b� [1/24/081
[10/5/07] Missing info - see red -lines. See 7.4.1.8 for all requirements.
Topic: Utility Plans - 6.6
Number: 166
Created:l0/5/2007
[1/24/08] Repeat (please dimension).
[10/5/07] Need to show and dimension the crown transition length in the
intersection details.
Number: 167
Created:10/5/2007
[1/24/08] Repeat.
[10/5/07] Please show/dimension the transition length either side of the
midblock crosspan(s) (typical).
Page 7
Number: 155
Created:l0/4/2007
[1/24/08] Repent
[10/4/07] Maximum grade breaks have been exceeded. See 7.4.1.8. (typical,
applies to all plan and profile sheets where exceeded).
Number: 157
Created:l0/4/2007
[1/24/08] Maximum grade breaks have been exceeded ... you might have to
throw a VC in here to make it work right. A variance will be needed if using less
than a 75' VC. Need to meet minimum FL grades around the curb returns while
not exceeding max grade breaks.
[10/4/07] Profiles must be carried out to the CL of the crosspan. Once this
info is shown, we'll be able to determine whether or not the proposed ties into
existing while meeting standards or if you'll have to remove and replace the .
existing to tie everything in.
Number: 158
Created:l0/4/2007
[1/24/08] Please label the cross slope on the crosspans so we can make sure
you're hitting .5% minimum.
[10/4/07] Minimum of .5% cross slope required on all crosspans (typical).
Number: 235 Created: 1/25/2008
[1/25/08] See redlines for comments that apply to all P&P sheets. Driveways
are labeled with "match existing grade"; however, the HP must be at the
Property Line as we do not want drainage from the street flowing into the
private properties. Perhaps adding an additional note to this affect plus the
fact that drive approaches may need to be reworked to achieve this.
Topic: Utility Plans - 6.3
Number: 162 Created: 10/5/2007
[1/24/08] The estimate for the bridge and the sidewalk has been received andiV�'`
denied. The sidewalk estimate needs to include the cost of the removals,plus
35' of sidewalk plus the chase. The bridge estimate needs to be for a 4 sided
pd��ag box culvert minimum built to a local street section with attached 6' walks and
parapet walls (see figure 1108). Please include removals, excavation & backf ill
(everything necessary to construct the bridge) plus a 25% contingency if the
developer wishes to put up the cash. If he chooses to put up a bond or letter or
credit instead, please include a 50% contingency. We estimate that a bridge of
Page 6
Topic: Utility Plans - 3.0
Number: 218 Created: 1/24/2008
[1/24/08] Please label the asphalt patch at the north end of Falcon Drive or
add a note to see C6.6 or add the patch symbol to the legend, whichever one
you like best works for me.
Number: 219 Created: 1/24/2008
Cwrr'LTK [1/24/08] Scanning issue highlighted in pink.
Topic: Utility Plans - 4.3
Number: 221 Created: 1/24/2008
6,,,E [1/24/08] Scanning issues with this sheet. The pen width is too thick for the V,/
smaller font and it won't scan clearly.
Topic: Utility Plans - 5.1
Number:222 Created: 1/24/2008 /
(1/24/08] Cross section at 2+00 is showing a detached walk ... should be ✓
attached.
Topic: Utility Plans - 6.0
Number: 233 Created: 1/25/2008
[1/25/08] Note 13 - this note conflicts with the information shown on the P&P
sheets. The P&P sheets are showing to keep the existing pavement and this
hie- sheet is showing to remove. It appears that the P&P sheets need to remove the
existing asphalt to make the grades work so this note will work. Just noted this
to coordinate it in the future.
Number: 234 Created: 1/25/2008 /
[1/25/08] Note 14 - I couldn't find where this was used on any of the sheets. ✓
Has something been left off or is this note unnecessary?
Topic: Utility Plans - 6.1
Number: 154 Created: 10/4/2007
[1/24/08] Repeat
6d {,,4.,4 [10/4/07] See 7.4.1.B.4 for VC requirements and 7-17, 7-18 for minimum curve
length requirements. Need to identify all grade breaks and slopes. See 7.4.1.E
for other requirements. (typical comment, applies to all plan and profile sheets
where these requirements aren't met).
Page 5
Topic: Landscape Plans
Number: 190 Created: 10/5/2007
(1/24/08] The Landscape Plans need to match the Utility and Site Plans. In py-,-
-p6piJ other words, need to show Falcon Drive all the way out to South Taft Hill Road.
[10/5/07] Please see the comment under General regarding the sidewalk
placement on the north side of Falcon Drive.
Pxk5:-J Number: 217 Created: 1/24/2008�1�
(1/24/08] Please label Tract A.
Topic: Plat /
614 Number:238 Created:1/25/2008
[1/25/08] From Technical Services - Boundary and legal close, no issues.
Topic: Site
Number: 186
Created: 10/5/2007
[1/24/08] I think I understand what you're trying to convey here ... perhaps
Dom using two different line weights (one for the property boundary and one for the
ROW) will help clarify the plans.
[10/5/07] Please remove the portion of the row line shown through the
intersections. See red -lines.
Number: 216 Created: 1/24/2008
Dot$e) [1/24/08] See comments under Steve Olt in Planning for Tract labeling issues.
Needs to match the plat (which is calling out Tract A with different easements
than the Site Plan is).
Topic: Soils Report
Number: 170 Created: 10/5/2007
[1/24/08] Thank you for submitting the additional soils investigation report.
Based on the recommendations of the report, please provide evidence from the
D,z Colorado Department of Public Health and Environment that the levels found
within the site are acceptable for the proposed development.
[10/5/07] As a condition of approval, this development was to provide evidence
of a soils report evaluating the presence of soil contaminants on the subject
property. This information was not received within the submitted soils report
or by separate document.
M
Page 4
Number: 208 Created: 1/10/2008
[1/10/08] At the end of the note on the bottom of the Landscape Plan about �g
the landscaping on the south side of Falcon Drive, please add: ...by the Property
bddi Owner to the South... (being the Klines). This will help avoid any confusion about
who the "responsible" property owner is, possibly mistaken to being the
property owner of Talon Estates.
Number: 210 Created: 1/10/2008,
Ve,rJ'P [1/10/08] Please label Tract A in a couple of places on the Landscape Plan. See
the red -lined plan.
Topic: Plot
Number: 213 Created: 1/16/2008
[1/16/08] The reference to Tract A being a utility, pedestrian access and J
drainage easement and wildlife buffer zone refers to note 5. It actually should
be note 6 (see red -lined plat).
Topic: Site
Number: 209 Created: 1/10/2008
S [1/10/08] Per the subdivision plat, Tract A is a Utility, Pedestrian Access and /
OjIS Drainage Easement; and, a Wildlife Buffer Zone. Please label Tract A as such on - V
3 the Site Plan and revise GENERAL NOTE #3 to reflect this, per the red -lined
plan.
Number: 212 Created: 1/16/2008
[1/16/08] On the Site Plan, please eliminate the reference to "w/ 7' parkway"
near the intersection of South Taft Hill Road and Falcon Drive (see red -lined
plan). The sidewalk is attached for about 200' along Falcon Drive in that
location. Parkways are generally considered to be landscaped areas between
detached sidewalks and curbs.
Department: Engineering Issue Contact: Susan Joy
Topic: General /
Number:224 Created:1/24/2008 ✓
(1/24/08] Please see red -lines for other comments.
Page 3
Number: 230 Created: 1/24/2008
6K [1/24/08] It may be necessary to have the Pleasant Valley & Lake Canal
Company sign the Utility Plans and Subdivision Plat.
Topic: Landscape Plans
Number: 204
Created:1/10/2008
[1/10/08] The current revised Landscape Plan has a date of 11/14/07. It is in.
�1y response to a Landscape Plan dated 09/04/07 that was with the original Final
Plan submittal. Was a red -lined Landscape Plan (by Current Planning) with the f0l
09/04/07 date included in the packet sent to the Applicant with the Staff
comment letter dated 10/05/07? If it was, why was that red -lined plan not
returned with the current revisions?
Number: 205
Created:1/10/2008
[1/10/08] The word Association is misspelled in NOTES #4 on the Landscape 9
(�Sfr Plan. Also, please revise the note to read: All landscaping in the public right-of-
way (ROW) and the common open area, Tract A, shall be maintained by the
Home Owners Association. Please see the red -lined plan.
Number: 206 Created: 1/10/2008
[1/10/08] Please capitalize the word City in NOTES #14 on the Landscape Plan. rv�
This will make the reference to the City Forester consistent with all the other
references. Please see the red -lined plan.
Number: 207
Created:1/10/2008
[1/10/08] There are now 14 Shademaster Honeylocust trees shown on the
Landscape Plan, which is nice. On all previous plans there were 12 Honeylocust.
The 2 new ones are down near the south end of Broadwing Road. The only issue 1141-
�r�� with this is that Section 3.2.1(D)(3) - Minimum Species Diversity of the Land
Use Code limits the number of any one species of tree on the plan to 15% if
there are 60 or more trees. In this case there are 84 trees on the plan and 15%
of that would be 12 trees. Please change out 2 of the Honeylocust to 1 more
American Linden and 1 more Hackberry; or, show 2 more Pine trees (Austrian
and/or Ponderosa) instead of 2 Honeylocust. However, Pine trees are not
appropriate in the parkway in a street ROW.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Stewart & Associates, Inc.
c/o Kevin Forbes, P.E.
103 South Meldrum Street
Fort Collins, CO 80521
Date: 1/28/2008
Staff has reviewed your submittal for TALON ESTATES - FINAL PLANS,
and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: 6eneroi
Issue Contact: Steve Olt
Number: 211 Created: 1/16/2008 /
[1/16/08] Edward Wendel of the Pleasant Valley & Lake Canal Company has
indicated that they have no concerns or problems with the revised Talon
Estates plans.
Number: 228 Created: 1/24/2008
[1/24/08] At the City staff review meeting on January 23, 2008 it was
determined that another "formal" 3 week round of review, resulting in another /
staff review meeting, is not necessary. However, Susan Joy of Engineering is
Ok needing to see paper copies of the Site Plan, Landscape Plan, Utility Plans, and
Subdivision Plat for review before she will request mylars of the plans. Please
work out this re -submittal with Susan (221-6605 or s_ioy@fcgov.com).
Number: 229 Created: 1/24/2008
[1/24/08] From a Planning Department perspective, once all of the issues are
addressed and revisions made to the plans per our comments and red -lined
ak plans, we are ready to have you submit mylars of the Site Plan, Landscape Plan, /
and Subdivision Plat. The qualification is, of course, that you have satisfied the
other departments' concerns, as well, with respect to these documents.
Engineering, Stormwater, Water / Wastewater, and Natural Resources review,
approve, and record the Utility Plans.
Page 1