[8/11/10] On the Landscape Plan (or Site Plan) please provide a detail for the retaining
walls shown at the southeast corner of the development. Also, please show the retaining
walls on the Site Plan. ( c- " s,.,pe, 7k4„
Number: 256 Created: 8/11 /2010
[8/11/10] NOTE 4 states: "All landscaping in the public right-of-way and in the common
open space Tract 'A' shall be maintained by the Home Owners Association." The note
should also indicate who will install the landscaping in these areas.
Topic: Plat
Number: 257 Created: 8/11 /2010
[8/11/10] In NOTE 9 please change the word suppression to sprinkler.
Uo Me -
Topic: Site
Number: 249 Created: 8/11 /2010
[8/11/10] Why & how have the parkways between back of curb and sidewalk, around and
through the development, been decreased in width? I do not see any changes in right-of-
way width, street width, sidewalk width, or acreages of properties.
Crs
Number: 253 Created: 8/11 /2010
[8/11/10] Under UTILITIES, please correct the spelling for Xcel Energy (not Excel), the
utility providing gas to the development.
CA, !re".,r
Number: 254 Created: 8/11 /2010
[8/11/10] Please change GENERAL NOTE 4 to read: Tract A is a utility, pedestrian
access, and drainage easement; and a wildlife buffer zone. It will be maintained by the
Home Owners Association.
R a,pea
Number: 255 Created: 8/11 /2010
[8/11/10] In GENERAL NOTE 8 please change the word suppression to sprinkler.
Page 2
Project Comments Sheet
City of Fort Collins Selected Departments
Department: Current Planning
Date: August 11, 2010
Project: TALON ESTATES PDP - TYPE 1 AND FINAL PLANS
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 11, 2010
Note - Please identify your redlines for future reference
Issue Contact: Steve Olt
Topic: General
Number: 174 Created: 10/5/2007
[8/11/10] Has this issue been addressed and resolved?
[10/5/07] The hearing officer placed a condition on the approval of the Project Development
Plan (PDP) that states:
"The Applicant shall submit evidence of a soils report in conjunction with the Final
Plan evaluating the presence of soil contaminants on the subject property."
The soils report submitted with the Final Plan does not appear to address this condition of
PDP approval. A revised soils report, clearly addressing the condition, must be submitted for
review. S.i,LT `kkapor-"t-ruQs S,�n..lfPd �•^a�R��r b7 ".Z. 5t�fi� 4 Cdiarac�a
a-- d �ia., J S,-E•-s"rj
Topic: Landscape Plans
Number: 173 Created: 10/5/2007
[8/11/10] What is the answer to this question?
[10/5/07] Has a streetlight plan been provided by City Light & Power so that the street tree
placement can be verified to meet the separation requirements?
Number: 204 Created: 1 /10/2008
[8/11/10] What is the answer to this question?
(1/10/08] The current revised Landscape Plan has a date of 11/14/07. It is in response to a
Landscape Plan dated 09/04/07 that was with the original Final Plan submittal. Was a red -
lined Landscape Plan (by Current Planning) with the 09/04/07 date included in the packet
sent to the Applicant with the Staff comment letter dated 10/05/07? If it was, why was that
red -lined plan not returned with the current revisions? At_t (2e.�gc"? —K4 Lie
A�t 14, eltlS I D to
CHECKM
IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility � Landscape
Page 1
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Steve Olt
City Planner
Page 5
Topic: Utility Plans -General
Number: 244 Created: 8/10/2010
[8/10/10] Change construction note number 11 on sheets 6.0 through 6.6 so that the correct
detail (D10, 11, 12, or 13) is referred to.
b6$4z,
Department: Light & Power Issue Contact: Alan Rutz
Topic: Utility Plans - 2.2
Number: 248 Created: 8/10/2010
[8/10/10] No additional comments. C(;
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number:252 g Created:8/11/2010
Please change note eon the platy and note Zon the Site Plan to read (NOTE: this is slightly
different than what I said at staff review): "All residences located within Talon Estates will be
equipped with fire -sprinkler systems approved in advance by Poudre Fire Authority." I prefer
that we include "approved in advance by PFA."
'Don►g_
Department: Technical Services Issue Contact: Jeff County
Topic: Plat
Number: 239 Created: 8/6/2010
[8/6/10] The Subdivision Plat boundary & legal description close.
O&_
Topic: Site
Number: 240 Created: 8/6/2010
[816/10] Please add "City of Fort Collins" to the property description on the Site Plan.
Do Vim
Topic: Utility Plans
Number: 241 Created: 8/6/2010
[8/6/10] Please correct the description of Benchmark 6-02 on sheet C1.0 of the Utility Plans.
It reads as it is on the east side of the property at 3040 South Taft Hill Road.
Uo,je,
Number: 242 Created: 8/6/2010
[8/6/10] There are line over text & text over text issues on sheets C5.1. C6.0 & C6.2 of the
Utility Plans. to
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 258 Created: 8/12/2010
[8/12/10] Please add a detention pond depth gage and provide the standard detail on the
plans. Po N E
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 251 Created: 8/11 /2010
[8/11/10] Comments from previous review were addressed; therefore, plans appear to be
okay unless the information requested by L & P results in utility conflicts.
O A,
Be sure and return all of your redlined plans when you re -submit.
Page 4
[8/10/10] Detail C - what does the note "6" separation not required where utility easement
exists?" [�o-re- ��ma
Topic: Utility Plans - 3.0
Number: 218 Created: 1 /24/2008
[8/5/10] Please show the temp asphalt patch on this sheet and all others to match what is
shown on sheet 3.0.
[1/24/08] Please label the asphalt patch at the north end of Falcon Drive or add a note to
see C6.6 or add the patch symbol to the legend, whichever one you like best works for me.
IDoNt-,-
Topic: Utility Plans - 5.3
Number: 261 Created: 8/13/2010
[8/13/10] The proposed waterline disappears in the profile between station 2+00 and 1+50.
F-fy-�
Topic: Utility Plans - 6.1
Number: 158 Created: 10/4/2007
(8/5/10] The slope is shown for the east/west flows (thanks), just add the slope for the
north/south flow so that we can verify you are meeting the .5% minimum.
[1/24/08] Please label the cross slope on the crosspans so we can make sure you're hitting
.5% minimum.
[10/4/07] Minimum of .5% cross slope required on all crosspans (typical).
DowE
Number: 235 Created: 1 /25/2008
[8/5110] This has not been changed on the plans. Please remove "Match Existing Grade"
and replace with a note that all driveway approaches must be built in accordance with detail
706 and that the existing grades may need to be reworked to accommodate this.
[1/25/08] See redlines for comments that apply to all P&P sheets. Driveways are labeled
with "match existing grade", however, the HP must be at the PL as we do not want drainage
from the street flowing into the private properties. Perhaps adding an additional note to this
affect plus the fact that drive approaches may need to be reworked to achieve this.
T)
Topic: Utility Plans - 6.3
Number: 164 Created: 10/5/2007
[8/5/10] The slope is shown for the east/west flows (thanks), just add the slope for the
north/south flow so that we can verify you are meeting the .5% minimum.
[1/24/08] Please identify crown transition length for the crosspan, label cross slope of the
crosspan (.5% minimum).
[10/5/07] Previous comments from other P&P sheets apply here.
LD6N£
Topic: Utility Plans - Cover
Number: 246 Created: 8/10/2010
[8/10/10] Change the date under the legal description to the month in which you submit
mylars and the year. No date of the month is required.
—J.l E
Topic: Utility Plans - Details
Number: 243 Created: 8/9/2010
[8/9/10] Please add 701, 1601. Remove 1607a and 1606a and replace with the updated
details 1606, 1606a, 1607. Remove detail 709 and replace with the appropriate stormwater
detail D10,11,12, or 13.
D we
Page 3
Topic: Plat
Number: 257 Created: 8/11/2010
[8/11/10] In NOTE 9 please change the word suppression to sprinkler.
Doarc.
Topic: Site
Number: 249 Created: 8/11/2010
[8/11/10] Why & how have the parkways between back of curb and sidewalk, around and
through the development, been decreased in width? I do not see any changes in right-of-
way width, street width, sidewalk width, or acreages of properties.
Cerra d �[�cj ,n *.�, c.a id>5' ]7¢�/fWrr1 <o 2 `,;5• ' Ljc�E
Number: 253 Created: 8/11/2010
[8/11/10] Under UTILITIES, please correct the spelling for Xcel Energy (not Excel), the
utility providing gas to the development. Do, P1e
Number:254 3 Created: 8/11/2010
[8/11/10] Please change GENERAL NOTE r#'to read: Tract A is a utility, pedestrian
access, and drainage easement; and a wildlife buffer zone. It will be maintained by the HOA.
Do,ue
Number: 255 Created: 8/11/2010
[8/11/10] In GENERAL NOTE 8 please change the word suppression to sprinkler.
CAN >Jc
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 260 Created: 8/13/2010
[8/13/10] The parkway width on the Site Plan does not match the parkway width shown on
the Utility Plans. CA r-ree_;66-1,
Topic: Soils Report
Number: 170 Created: 10/5/2007
[8/5/10] [1/24/08] Thank you for submitting the additional soils investigation report. Based
on the recommendations of the report, please provide evidence from the Colorado
Department of Public Health and Environment that the levels found within the site are
acceptable for the proposed development.
[10/5/07] As a condition of approval, this development was to provide evidence of a soils
report evaluating the presence of soil contaminants on the subject property. This
information was not received within the submitted soils report or by separate document.
Isla I��.,e (�cC, '��d Py Q -�c r'�S�Ns� {xa �d4.�-
Topic: Utility Plans
Number: 259 Created: 8/13/2010
[8/13/10] Please show where the existing gas line is along the east west portion of Falcon
Drive or how it ties into the north south gas line along Falcon. (:,or4cs ran„
Topic: Utility Plans - 1.1
Number: 245 Created: 8/10/2010
[8/10/10] Remove the start date on the construction schedule as we do not know when this
project will actually start.
Topic: Utility Plans - 2.2
Number: 247 Created: 8/10/2010
Page 2
4 :,
Frof
t Collins STAFF PROJECT REVIEW
KEVIN FORBES, P.E. Date: 8/13/2010
STEWART & ASSOCIATES, INC.
103 S. MELDRUM ST.
FORT COLLINS, CO 80521
Staff has reviewed your submittal for TALON ESTATES PDP - TYPE I AND FINAL PLANS,
and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 174 Created: 10/5/2007
[8/11/10] Has this issue been addressed and resolved?
[10/5/07] The hearing officer placed a condition on the approval of the Project Development
Plan (PDP) that states:
"The Applicant shall submit evidence of a soils report in conjunction with the Final Plan
evaluating the presence of soil contaminants on the subject property."
The soils report submitted with the Final Plan does not appear to address this condition of
PDP approval. A revised soils report, clearly addressing the condition, must be submitted for
review. .5a,11 ?e�e"� Has 5<,b,,�,ycd ca,,l re,Vcc&.sc,r., 4,c df Coloradv
Topic: Landscape Plans
Number: 173 Created: 10/5/2007
[8/11/10] What is the answer to this question?
[10/5/07] Hasa streetlight plan been provided by City Light & Power so that the street tree
placement can be verified to meet the separation requirements?
Number: 204 Created: 1 /10/2008
[8/11/10] What is the answer to this question?
[1/10/08] The current revised Landscape Plan has a date of 11/14/07. It is in response to a
Landscape Plan dated 09/04/07 that was with the original Final Plan submittal. Was a red -
lined Landscape Plan (by Current Planning) with the 09/04/07 date included in the packet
sent to the Applicant with the Staff comment letter dated 10/05/07? If it was, why was that
red -lined plan not returned with the yyrrent revisions? A/o
l ire, c rc'la..�c.a� ��- �.,b c� h� d �• Q j>SssGas.L�,,�
Number: 250 Created: 8/11 /2010
[8/11/10] On the Landscape Plan (or Site Plan) please provide a detail for the retaining
walls shown at the southeast corner of the development. Also, please show the retaining
walls on the Site Plan. ( cy n sc� c pcev)
Number: 256 Created: 8/11 /2010
[8/11/10) NOTE 4 states: "All landscaping in the public right-of-way and in the common
open space Tract "A" shall be maintained by the Home Owners Association." The note
should also indicate who will install the landscaping in these areas.