Loading...
HomeMy WebLinkAboutRICE HOMESTEAD ANNEXATION - 47-00 - CORRESPONDENCE - (5)Gfty of F6rt Collins City's adopted Structure Plan. A small portion of the property, at its southeast end, appears to be located in the Open Lands, Parks, Stream Corridors area on the Structure Plan. If annexed the property should come into the City in the Urban Estate District. 3. Currently the only vehicular access is from Richards Lake Road into the west end of the property. 4. The applicant must enter into the Annexation process before any site specific development plan (Subdivision Plat, Project Development Plan, etc.) can be accepted by the City for review. There will be 4 public hearings associated with the Annexation process: 1) Initiating Resolution at City Council; 2) at Planning & Zoning Board for recommendation to Council; 3) First reading at City Council; and, 4) Second Reading at City Council. The earliest the City could accept any application for a site specific development plan for review is after the annexation request goes to Council for Initiating Resolution, which generally occurs about 1 month after the annexation request is submitted to begin the process. The annexation process is approximately 3 months in length. 5. If and when annexed, and when a Project Development Plan (Subdivision Plat) request is submitted, the proposal will be subject to the Permitted Uses, Land Use Standards, and Development Standards set forth in Division 4.2 Urban Estate District of the Land Use Code. 6. A Project Development Plan request will be subject to all applicable standards set forth in Article 3 General Development Standards of the Land Use Code. Page 6 of 6 1 City of ort Co ins 1. ANNEXATION PFA has no comments regarding the annexation. The following two requirements, however, must be met if residential structures are proposed in the future. 2. WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: - Commercial and multi -family dwellings 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter - Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter - Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. 2006 International Fire Code 508.1 and Appendix B 3. ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). If the numerals are mounted on a side of the building other than the side off of which it is addressed, the street name is required to be posted along with the numerals. 006 International Fire Code 505.1 ENGINEERING DEVELOPMENT REVIEW Contact: Susan Joy, 970-221-6581, siovMcpov.com 1. No comments as far as the annexation is concerned, however, there will comments at such time this property actually develops or subdivides. Standard development requirements apply with two that I would like to mention at this time. Each lot needs to meet the definition of a lot and have a 20' paved access. Also, per section 3.3.2(E) of LCUASS, this development must have an improved connection to an approved arterial street. 2. Please speak with Sheri Langenberger regarding street paving requirements and selling sub -divided lots before required improvements are made. (970)221-6573 CURRENT PLANNING Contact: Steve Olt, 970-221-6341, soltCcDfcgov.com 1. The property is eligible for annexation into the City of Fort Collins by virtue of it contiguity to Richards Lake (owned by Water Supply & Storage), which is contiguous to the Hearthfire development to the northeast. Water bodies do not nullify contiguity for the purpose of annexation eligibility. 2. The majority of the property is shown to be in Urban Estate Neighborhood area on the Page 4 of 6 3. Onsite detention is required unless there is an agreement with the owners of Richard6s Lake or Long Pond to accept the entire 100 year developed runoff release into either of their lakes. 4. Water quality treatment is required as described in the Urban Storm Drainage Criteria Manual, Volume 3 L Best Management Practices (BMPs). Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. The Water Supply and Storage Company may require additional water quality treatment to discharge into either of their lakes. 5. The Water Supply and Storage Company will need to approve the construction plans. Their contact information is; Jim McFall, Superintendent, 482-3433, 222-4668 (Cell), 482-7083 (Shop); Eldon Marrs, President, PO Box 1584, Fort Collins CO 80522, 482-3433; Dennis Harmon Gen Mgr, PO Box 1584, Fort Collins CO 80522, 482-3433 , 442-1850(Cell); Dana M. Parker Office Mgr, (970) 482-3433. 6. The city wide Stormwater development fee (PIF) is $6,313.00/acre ($0.1449/sq.ft.) for new impervious area over 350 sq.-ft. and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/builders-fees.php or contact Jean Pakech at 221- 6375 for questions on fees. PARK PLANNING Contact: Craig Foreman, 970-221-6618, cforeman(&Jc4ov.com 1. No comments HISTORICAL PRESERVATION Contact: Karen McWilliams, 970-224-6078, kmcwilliams(&fcgov.com 1. Since buildings were constructed in 1920s and are more than 50 years old, changes or demolition of the existing buildings would go through our demolition/alteration review process. Additionally, new development may need to be reviewed for compliance with Land Use Code Section 3.4.7. 2. Properties that are designated, either as Fort Collins Landmarks or on the National and State Registers, may receive financial incentives. Financial programs include 20% State Tax Credits, $7,500 yearly no -interest loans, $15,000 Historic Structure Assessment grants, State Historic Fund grants of $200,000 and more, and, for income producing properties, an additional 20% Federal Tax Credit. Any work, both interior and exterior, which protects or promotes a building's historic character by meeting the Secretary of the Interior's Standards (http://www.cr.nps.gov/hps/tps/standguide/index.htm) can qualify. For more details on financial incentives, please contact Historic Preservation staff. FIRE AUTHORITY Contact: Carle Dann, 970-219-5337, CDANNfa.aoudre-fire.orn Page 3 of 5 CONCEPTUAL REVIEW STAFF COMMENTS Meeting Date: September 20, 2010 Item: Rice Homestead Annexation Applicant: Vicki Slayton 604 SMITH ST Fort Collins, CO Land Use Data: This is a request to annex 955 Richards Lake Road into the City of Fort Collins. The parcel is contiguous across Richards Lake. The future hope is to subdivide the parcel into three (3) "urban estate" zoned lots with dwellings. The parcel is currently zoned in the county Farm, Ag1, with one single family residence on the lot. Comments: ZONING Contact: Peter Barnes, 970-416-2355, Pbarnes(&fcgov.com 1. The structure plan map indicates that this property will be placed in the UE, Urban Estate , , . zone district. The minimum lot size in this zone is 1/2 acre per dwelling unit. The proposed lots easily comply with this requirement. 2. A plat will be required to be approved for the subdivision descrived in the application. This is processed as a Type 1 Administrative Hearing. WATER -WASTEWATER ENGINEERING Contact: Roger Buffington, 970-221-6854, rbuffington(&fcgov.com 1. Water and wastewater services in this area are provided by the ELCO Water District (493-2044) and the Boxelder Sanitation District (498-0604). STORMWATER ENGINEERING Contact: Glen Schlueter, 970-224-6065, gschlueter(&fcgov.com 1. The annexation of this property does not trigger any Stormwater requirements. However when the property is developed there are general requirements that I will briefly list. 2. A drainage and erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. Page 2 of 6 of Flirt Collins September 20, 2010 Vicki Slayton 604 SMITH ST Fort Collins, CO RE: Rice Homestead Annexation Dear Vicki, Community Development and Neighborhood services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov. com/currentplanning Attached, please see a copy of Staffs comments concerning the request referred to as the Rice Homestead Annexation, which was presented before the Conceptual Review Team on September 20, 2010. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to contact me at 970-221-6341. Sincerely, 1r-f?z9W'0,1M!/ City Planner 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 — (970) 221-6750 - FAX (970) 224-6134