> > >>> Brad Massey <bmassey(cDaller-lingle.com> 09/12/2007 2:27 PM >>>
> > Peter:
> > Thanks for the comments via the fax you just sent.
> > One thing I noticed was that Sheri had a comment
> > that the "revised plat was not submitted and as
> > such not reviewed". That's not true because
> > submitted four copies of the revised plat at the
> > same time I resubmitted the other documents. I
> > have attached a copy of my transmittal. I also
> > gave two copies of the revised plat directly to
> > Steve Olt per his request. If you are unable to
> > locate the copies please let me know asap so I can
> > get new sets down to you right away.
> > Thanks,
> > Brad Massey
CC: Sandy Lindell; Sheri Langenberger
�$teve Olt - Re: Fossil Lake MA Page 1
i-
From:
Steve Olt
To:
Brad Massey
Date:
9/14/2007 1:47:28 PM
Subject:
Re: Fossil Lake MA
Brad,
The Final Plan submittal documentation must address the last set of comments 08/07/2007. As indicated
near the end of that letter, please return any red -lined plans you may still have when you submit Final
Plans.
Steve
>>> Brad Massey <bmassey@aller-lingle.com> 9/14/2007 1:41 PM >>>
Thanks for the explanation. I will get these sets to you early next week. I'm assuming that since no staff
comments/conditions came out of the public hearing then we can just resubmit the revised plat that I gave
you just before the hearing.
Brad
Steve Olt wrote:
> Brad,
> The 4 copies given to Sheri and the 2 copies to me were for preparation for the upcoming administrative
public hearing for the Project Development Plan (PDP) phase of City development review. The second
step in the City's 2-phase review process is Final Compliance Plan submittal. For that submittal, now that
the public hearing has been held, you need to submit 7 subdivision plats, 5 utility plan sets, and 2 drainage
reports, along with the Planning & Zoning application for Final Plan w/subdivision plat; and, the
Transportation Development Review Fee (TDRF) application. The required amounts for both the Planning
& Zoning fee and the TDRF - Final Plans were paid with your PDP submittal. Therefore, no more fees
need to be provided. Also, Final Plan review is administrative and approved by the Director of Engineering
and the Director of Planning, with no public hearing.
> Steve
> >>> Brad Massey <bmassev(&aller-lingle.com> 9/12/2007 4:09 PM >>>
> Thanks for checking into it. Unless I hear otherwise from one of you, I'm assuming those four revised
copies will suffice for Sheri and whoever else needs to review the plat.
> Brad
> Steve Olt wrote:
> > I gave 4 copies of the plat to Sheri and kept 2 copies for the administrative public hearing, which took
place last Thursday, September 6th. The decision on the plat is still pending.
> > Steve
> > >>> Peter Barnes 9/12/2007 3:13 PM >>>
> > Yes, I recall getting your plat copies included in your minor amendment resubmittal. I gave them all to
Steve Olt the same day I received the MA revisions. The minor amendment just involved the architectural
plans, and the plat is not part of that process. You should probably contact Steve Olt if you need
clarification regarding the Type 1 process for the plat. We're basically done with the minor amendment,
just pending the completion of the Type 1 process. Thanks.
> > Peter.