HomeMy WebLinkAboutKING SOOPERS (CEDARWOOD) WTE COLOCATION - BDR - 38-06/B - MAPS/GRAPHICS - ELEVATIONSr.mw
T.O. STEALTH POLE h T-MOBILE ANTENNAS
I I
n NORTH ELEVATION
2 2 saKE Oro : 1•-0'
T.O. VEIZON WIRELESS
ELEY. 42'-0•i
!.SHELTER
GROUND LEVEL
ELEV: 0'- 0'2
nWEST ELEVATION <�-�
U PROPOSED CO -LOCATABLE 30'0 X 56-0'3 HIGH STEALTH POLE PAWNED 'DESERT TAN'.
(DESIGN AND FOUNDATION BY OTHERS).
O PROPOSED VERIZON 11'-8' X 26'-0' EOUIPMENT SHELTER WIM STONE TIME D(TERIOR
FKSH DIESEL DRIVEN/Bfl�i ND BY GENERA WITH NCLUDING AC 210GALLON OE FLOOR PORT IkITH PROPOSED
SNID MOUNTED DIESEL FUEL
TANK RDEIR TO MANUFACNRER'S SPECS AND OETARS
OPROPOSED (6) 4'-0• VERROI ANTENNAS STACIED ON THREE SECTORED SUSAN- (OR
APPRON-ED EQUAL) (2) PER SECTOR (3) SECTORS MOUNTED INSIDE PROPOSED STEALTH
POLE O 1.R, 167. 28Y AZIMUTHS.
O PROPOSED U.C. TELEPHONE ROUTE FROM DUSTING TELEPHONE PEDESTAL TO PROPOSED
TELEPHONE DEMARCATION ENCLOSURE MOUNTED TO UNISTRUT H-FRAME FIELD VERIFY
PRIOR TO CONSTRUCTION.
O PROPOSED U.G. TELEPHONE ROUTE FROM PROPOSED TELEPHONE DEMARCATIDN ENCLOSURE
MOUNTED AT UNISTRUT H-FRAME TO PROPOSED VERZDN SHELTER. FIELD VERIFY PRIOR
TO CONSTRUCTION.
O PROPOSED U.C. ELECTRICAL FEEDER ROUTE FROM COSTING UTUTY COMPANY PAD
MOUNTED TRANSFORMER TO UM TY COMPANY METER MOUNTED TO UNISTRUT H-FRAME
FIELD VERIFY PRIOR TO CONSTRUCTION.
O PROPOSED U.C. ELECTRICAL FEEDER ROUTE FROM MAIN DISCONNECT SMTOH MOUNTED To
UNISTRUT H-FRAME To PROPOSED VEWZON EQUIPMENT SHELTER FIELD VERIFY PRIOR TO
CONSTMICOON.
O PROPOSED U.G. COAX ROBE FROM PROPOSED VERZON EQUIPMENT SHELTER THROUGH
WFAMEAPROOF WAVECUDE FLOOR PORT AT SHELTER FLOOR TO PROPOSED STEALTH POLE
BASE PORT DOGHOUSE (BY OTHERS). ROUTE IN COMMON T-MDBILE COUOCATION TRENCH.
FIELD VERIFY LOCATION PRIOR TO CONSTRUCTION.
O PROPOSED VERTICAL COAX ROUTE STUBBED UP AT DOGHOUSE AT STEALTH BASE PORT.
CDAX TO RUN INSIDE PROPOSED POE TO ANTENNAS. FIELD VERIFY LOCATION PRIOR TO
CONSTRUCTION.
10 PROPOSED DOGHOUSE AT STEALTH POE SASE PORT.
I I PROPOSED CPS AMID" MOUNTED ON PROPOSED PREFABRICATED SHELTER
12 PROPOSED V-O' A 12'-8' A I' CONCRETE STOOP.
13 PROPOSED UNISTRUT H-FRAME UTILITY DISTRIBUTION CENTER
14 PROPOSED MAIN DISCONNECT SWITCH 2O0A IOU, 120/240V FUSIBLE NEW 311 MOUNTED
TO PROPOSED UMSIRUT H-FRAME.
13 PROPOSED UTILITY CO. METER 206A-2P, NEW 3R MOUNTED TO PROPOSED LNISIRIR
H-FRA E
18 PROPOSED TELEPHONE DEMARCATION ENCLOSURE PRONDED BY CONTRACTOR. MOUNTED To
H-FRAME
<IC7> PROPOSED 6'-0' KOH WOOD CEDAR FENCE FINISH SIDE OF FENCE SHALL FACE PUBLIC
RIOT -OF -WAY. PROPOSED FENCED AREA TO INCLUDE 3' OF GRAVEL AND CEOTQTIE
FABRIC TO EXTEND V-O' OUTSIDE OF FENCE UNE.
18 PROPOSED 6'-0' HIGH X 12'-0' WIDE WOOD CEDAR DOUBLE SMOG ACCESS GATES
19 EXISTING T-MOBRE ANTENNAS.
OCOSTING u1INY COMPANY PAD MOUNTED TRANSFORMER
21 EMSTURG TELEPHONE PEDESTAL
O EXISTING T-MO80E 6'-0' HIGH WOOD CEDAR FENCE
O DUSTING ICNG SOOERS BUILDING.
24 DUSTING T-MOBILE EOUIPMENT ON CONCRETE PAD.
26 PROPOSED BOLLARDS AT PROPOSED VEROON, DMNG T-MOBILE LEASE AREAS, AND AT
PROPOSED STEALTH MONOPOLE
28 PROPOSED GENERATOR INTAKE LONER.
�t-
m w pff I
KDC ARCHTTECTi.ENSINEERS, P.C.
7M2 S. TU130N WAY, SUITE IN
CENTENNIAL COLORrADO WI12
PHONE N33W.6999 FAX:303.7M.0236
\00,00�
verG!aUwftlew
Csstrmtlm OPrtpnt
MpW.>e..W M0 4 WRi
1l TYm 6YI
PROJECT NUMBER
NOR
0T.26.08
CLIENT FEVIEW A
RANKING DEP'T FEVISIOS B
06.04.07
CLIENT F€VISI018 C
07.31.07
RANKING DEP'T FIEVISIOS D
08.15.07
CLIENT FEVISIOS E
08.20.07
CLIENT FIEVISICIS F
07.26.06 PRELIMINARY FIEVIE'1
ZONING PEEWIT
APPLICATION
ZONING APPROVALS
COSTRICTION PEFNIT
I ISSUED FOR CCNSTRICTION
HAS BUILTRECOO SET
0 MI YPIryA W plllm mlplq YMnIM
Illtgn my sl b SIFT Imtq, mq p OIItImN
p Nvl tlln pllim pgpll el Ib pmllml.
ALTERNATIVE NUMBER 1
ALPHA DESIGNATION
FTC AGGIE
1015 SOUTH TAFT HILL ROAD
FORT COLLWS, COLORADO 80521
ELEVATIONS
Z-2