HomeMy WebLinkAboutNORTH COLLEGE MARKETPLACE, WETLANDS - PDP - 39-08 - SUBMITTAL DOCUMENTS - ROUND 1 -storage volume and leaving the "dead storage" may be better for the wetland since a lower
outlet could dewater the area lower than historically and affect the wetland vegetation.
Response:A new outlet is being proposed. The pipe will be placed approximately 6 inches
higher than the proposed pond bottom to prevent dewatering of the wetlands.
Stormwater-Water-Wastewater
The existing water and sanitary sewer facilities in the vicinity of the project have been
previously reviewed and will not be repeated here. If there are questions, please call.
Response: -Noted
The PDR conceptual utility plan included in the submittal appears to be generally okay;
however, some adjustments may be needed during PDP based upon water main looping
opportunities and input from PFA on fire hydrant locations.
Response: -Noted
It is noted that the 6-inch sewer is being re -located. It will be important that minimum grade is
maintained for this line. As previously stated, the City is willing to participate to some degree
in the cost of the replacement of this sewer; however, the level of cost sharing has not been
discussed.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal. -Noted
The proposed pad sites along College could obtain water service from the water main in
College or the proposed water main in the N/S drive east of College. Any utility work in
College will require a CDOT utility access permit. Curb stops and meter pits for these pad
sites must be located in landscaped areas as near to the water main as practical.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal.
All existing water and sewer services must be used or abandoned at the main.
Response: To be addressed in subsequent CDP and Phase-2 PDP submittal.
All water and sanitary sewer mains for the project must be located within easements or
R.O.W. Minimum easement widths are 20 feet for water and 30 feet for sewer.
Response: The sanitary and water mains are located within the required easements.
Zoning
The development will have to comply with the standards and guidelines for the North College
Avenue Corridor.
Response: Noted.
Connecting walkways need to be provided per Section 3.2.2(C)(5)
Response: Phase-1 includes a trail connection along the west edge of the existing north
wetland areas to the north. And, pedestrian connections are to be addressed in subsequent
ODP and Phase-2 PDP submittal.
Responses to Preliminary Design Review Comments Page 6 of 6
These requirements may be modified if buildings are equipped with automatic fire sprinkler
systems. 97UFC 901.2.2.2
Response:- To be addressed in subsequent ODP and Phase-2 PDP submittal.
Fire department connections shall be installed remote from the buildings, and located on the
street or fire lane side of buildings, fully visible and recognizable from the street or nearest
point of fire deportment vehicle access or as otherwise approved by the fire code official. If
possible, a fire hydrant shall be located within 100 feet of the FDC. PFA Bureau Policy
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless
hydraulic calculations can support a smaller fire line.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal. -
Permits are required from PFA to install fueling systems. Two sets of plans shall be provided to
PFA for review; these cut sheets shall show the number, size, contents and construction of the
fuel tanks and their assemblies.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal
Stormwater-Water-Wastewater
The first question for Stormwater was with an extra 5 acre-ft of storage will the City view the
onsite pond with regional value? Answer: No, if "regional" means that the City would own
and maintain the pond. If regional means that other properties can drain to it and they would
participate in maintenance then yes. It is not a regional pond that is identified in any City
Stormwater Masterplan.
Response: Noted
The second question is can the existing dealership and restaurant continue to drain to the
street without detention? Yes, the existing sites are grandfathered. If they were demolished
and the area became part of the development, then it should be detained and treated, but
even then the impervious area is grandfathered and will drain to the same pond as it always
has. The existing pond/wetland does have a required release rate identified in the Drainage
Masterplan. As long the flow depths in the street meet criteria there shouldn't be a need to
detain it anywhere other than where it drains to now.
Response: The existing property flows are being picked up by an inlet located just south of the
bio-swale with minor carry-over flows continuing as it currently drains.
The third question was can flows continue to sheet flow onto the site through the main access
drive or are inlets required? It could sheet flow into the site but the design engineer may want
to consider an inlet since waiter flowing into the drive could be a nuisance especially in the
winter time where it could form ice in the driveway. There is an existing pipe running parallel
to College Ave. so it should be fairly easy to add an inlet upstream of the driveway access.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal -
There was some discussion concerning adding a new detention pond outfall instead of
opening up the plugged pipe just east of the site. A new pipe would be fine but it may be less
expensive to use the existing pipe. There would be some "dead storage" in the existing
pond/wetland that is presently drained by the old field drain. As designed now there is extra
to Preliminary Design Review Comments Page
Response: Acknowledged.
There is existing single-phase and three-phase power along the South side of East Willox with
a couple of conduits stubbed into this property.
Response: Acknowledged.
Light & Power will need to install a concrete vault and some switchgear on this site to provide
service for this development. Additional easement may be needed.
Response: Acknowledged.
Please field locate and show all existing electric facilities on the plan set so we can determine
where, if any, utility conflicts will be.
Response: Existing electric utilities are provided on the utility plans.
Fire
Fire access roads (fire lanes) shall be provided for every facility, building or portion of a
building hereafter constructed or moved into or within the PFA's jurisdiction when any portion
of an exterior wall of the first story of the building is located more than 150 feet from fire
apparatus access as measured by an approved route (from a public street) around the exterior
of the building or facility. This fire lane shall:
• Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable
of supporting fire apparatus weights. Compacted road base shall be used only for
temporary fire lanes or at construction sites.
• Have appropriate maintenance agreements that are legally binding and enforceable.
• Be designated on the plat as an Emergency Access Easement.
• Maintain the required minimum width of 20 feet throughout the length of the fire lane.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal.
Afire lane plan shall be submitted for approval prior to installation. If a fire lane is not
provided, all buildings out of access (exceeding the 150-foot requirement) shall be equipped
with an approved automatic fire -sprinkler system. 97UFC 901.2.21; 901.3; 901.4.2;
902.2.1
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal
Minimum turning radii for emergency- response apparatus on any fire apparatus roadway is
25 feet inside, 50 feet outside. UFC 902.2.2.3
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal.
Fire hydrants, where required, must be the type approved by the water district having
jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum
requirements based on type of occupancy. Minimum flow and spacing requirements include:
• Commercial, 1,500 gpm at 20 psi residual pressure, spaced not farther than 300 feet
to the building, on 600-foot centers thereafter.
Response: Fire hydrants are provided at the spacing requirements listed.
Responses to Preliminory Design Review Comments Page 4 of 6
Current Planning's responses to questions provided by the Mulhem Group, Ltd.
Technically, yes, a "phased" development project will occur if all infrastructure (roadways,
utilities, storm drainage) and landscape improvements are not to be done all at once based
on an approved and filed Final Plan. If this is to be the case the Development Agreement will
address the infrastructure phasing and the Site & Landscape Plans must address the landscape
phasing.
Response: Acknowledged.
The type of development review processes, checklists, and submittal requirements will depend
on what the developer wants to have approved at the various levels of review. If the developer
wants Project Development Plan (PDP) level of approval only for the King Soopers store then
an Overall Development Plan (ODP - bubble diagrammatic) for the entire site must be
submitted along with the King Soopers PDP. As stated in Section 2.1.3(B)(2), an ODP shall be
required for any property which is intended to be developed over time in 2 or more PDP
submittals.
Response: An ODP and the Phase-2 PDP is planned to be submitted at a later date.
As part of the Statement of Planning Objectives, the developer/applicant must identify the
applicable City Plan Principles and Policies to be achieved by this development. The Principles
and Policies can be obtained on the City's website at: http://fcqov.com/advanceplanninci/city-
plon.phg
Response: Acknowledged. Since this submittal focuses in on the detention/wetland area the
Phase-1 Statement of Planning Objectives is limited. A more detailed statement will be
available with the ODP and subsequent Phase-2 PDP for the balance of the project site.
Current Planning — Natural Resources
The Ecological Characterization study previously prepared for this site will need to be updated
Response: Updated plan provided by Cedar Creek Associates, Inc.
Wetland mitigation shall occur at a 1 :1 replacement ratio. A wetlands mitigation plan is
required for this project.
Response: A wetland mitigation plan is provided meeting the required replacement ratio.
Engineering
The directing of water from the street system into the site via driveway should look towards
directing water such that it does not cross over a sidewalk, (sidewalk chase).
Response: - To be addressed in subsequent ODP and Phase-2 PDP submittal. Noted
Depending on the relationship between the sidewalk design along Willox and the design of
the detention pond, a handrail may needed to provide barrier protection.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal.
Please see previous comments through previous conceptual reviews.
Response: Acknowledged.
Light & Power
Electric Capacity Fee and Building Site charges will apply to this development. Any relocation
or modification to existing electric facilities will be at the owners' expense.
Responses to Preliminary Design Review Comments Page 3 of 6
The detention pond at the southeast corner of the site must be located in a public easement.
Response: The developer stated that there may be some URA participation in this
development. Phase-1 indicated URA Fort Collins is to own and maintain.
Environmental Planner
An Ecological Characterization Study is required, as set forth in Section 3.4.1(E) of the Land
Use Code. A full study of the site, including a report, must be part of the Project Development
Plan submittal.
Response: A report prepared by Cedar Creek Associates, Inc. has been submitted with the
Phase-1 PDP.
Show existing trees and any necessary or proposed mitigation on the Landscape Plan.
Response: Existing trees and proposed mitigation is shown on the landscape plan for six trees
on the south edge of the existing north wetland. An additional site visit is to be coordinated by
BHA Design with Tim Buchanan to evaluate trees which may be impacted by the proposed
trial connection.
It was discussed on an earlier site visit by Tim and Bruce Hendee that many of the trees on site
are nuisance trees and can be removed.
It is critical for the developer and City staff to maintain continuing discussions in the pre -
submittal process.
Response: Acknowledged. Developer and design team have had continued discussions and
meetings prior to submittal.
Engineering
City staff recommends not including the building "envelopes" on the subdivision plat. Platting
the envelopes could create problems in the future relating to the potential need for replats. It
is recommended that the applicant plat parcels, tracts, or lots that are large enough to
accommodate possible building shifts or overhangs/encroachments.
Response: Acknowledged. Currently the proposed plat does not include building envelopes.
The minimum horizontal separation between the sidewalk and the proposed retaining wall for
the detention pond is 2'.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal.
Andrea of AYRES Associated asked if the retaining wall for the detention pond can be in street
right-of-way (ROW) or easements? Marc replied by saying that it cannot be in the ROW but
could possibly be in the easement behind the ROW if given permission by all affected utilities.
Response: No retaining walls are proposed within street right-of-way or utility easement.
Transportation Planning
The developer asked if the sidewalk between East Willox Lane and the proposed retaining wall
at the detention pond can be attached to the back of curb for the street. Denise replied by
saying that a detached sidewalk, with parkway, is preferred.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal.
Responses to Preliminary Design Review Comments Page 2 of 6
rises to Preliminary Design Review Comments
North College Marketplace — Wetlands (Phase -1)
ITEM: North College Marketplace
MEETING DATE: June 25, 2008
APPLICANT: 1908 North College, LLC
Blaine Rappe and Eric Holsopple
1043 Eagle Dr
Loveland, Colorado 80537
COMMENTS:
Note: Responses provided are applicable to the Wetlands (Phase-1) PDP submittal. All
comments will be addresses in the ODP and Phase-2 PDP submittal.
Advanced Planning
The proposed rezoning currently in process is highlighting goals that reinforce the importance
of that standard in creating as pedestrian -oriented a place as possible.
Response: Phase-1 includes a trail connection along the west edge of the existing north
wetland areas to the north. And, pedestrian connections are to be addressed in subsequent
ODP and Phase-2 PDP submittal.
Water & Wastewater
Water services to the shopping center can come from the City's water mains in either North
College Avenue or East Willox Lane.
Response: Acknowledged.
The existing sanitary sewer main in the area is being relocated.
Response: To be addressed in subsequent ODP and Phase-2 PDP submittal
Light & Power
Some additional utility easements may be needed.
Response: Noted
Existing electric facilities in the area must be shown on the Project Development Plans. The
applicant is responsible for locating these facilities.
Response: Existing utilities are shown on the site and utility plans.
Stormwater
Glen asked where the storm drainage outfoll from the site will occur.
Response: Andrea of AYRES Associates replied by saying that it will be at the southeast corner
of the site.
Andrea of AYRES Associates stated that the storm water will be released into the Blue Spruce
system at the approved master plan level.
Responses to Preliminary Design Review Comments Page 1 of 6