HomeMy WebLinkAboutNORTH COLLEGE MARKETPLACE, WETLANDS - FDP - 39-08/A - CORRESPONDENCE - (5)North College Marketplace Project Punch list items per email dated 4.16.10 from URA Stormwater Items Issue: Solution: 1. The wetland will have 5 to 6 inches of standing water in the pond contractor to lower storm line A out fall to elevation 4971 which . because of the reverse grade in the outfall pipe. will drain south wetlands as originally engineered for. Lowering will occur 4.27.10-4.30.10. 2. There is standing water in more than 15%of the wetland even with item in correct. Mitigation report requires 80%vegetation the pond being pumped. established by the end of year 3. 3. The erosion control fabric on the slopes of the pond and the water project engineer revised construction plan set for alternative quality berm have not been installed as shown on sheet C-141. erosion control method to be implements 4.27.10-4.30.10 4. Scourstop has not been installed at the outlet of all the pipes into 1 remaining scourstop at south end of filtration pond to be the water quality pond. installed by 4.30.10 S. The pans in the water quality pond are holding water. pans were constructed per plans. 6. There is seepage from the irrigation ditch in the northwester corner comment noted - no action required by developer. of the wetland. 7. Manhole A2 in Willox needs to have steps for access. steps to be installed by 4.30.10 8. Orifice plate and trash collector installed at outfall point in south wetlands plate and collector to be installed by 4.30.10 9. Orifice plates installed on all head walls at end of concrete pans in filtrate plates to be installed by 4.30.10 pond Wetlands Items Issue: Solution: 1. Planting of all willow stakes at the bottom of the berm with wetlands boundary wetland. completed by contractor. 2. Relocation of Limit -of -Development fencing (orange construction fence) along area as defined in the final plans. completed by contractor. 3. Cut green outfall drain pipes to match slope from forebay into wetlands. completed by contractor. 4. Remove all survey and grade stakes from the wetlands property completed by contractor. 5 Finish grading and restore the area at the southeast storm drain outlet in the south. completed by contractor. 6. Remove all trash from the wetlands property completed by contractor. 7 Irrigation system has to be running completed by contractor. King Soopers Property (Filtration Area) Items: Issue: Solution: 1. Fore bay: the bottom is scarified completed by contractor 2 The scouring fabric has to be installed completed by contractor 3 Wetlands/uplands plantings installed completed by contractor 4. Wetlands seeding to be completed completed by contractor 5 Irrigation system has to be running completed by contractor 4/27/2010 File:URA Punchlist Matrix for NCMP Page 1 of 1 Steve Olt - North College Marketplace Wetlands Acceptance Punchlist Matrix From: Blaine Rappe <brappe@lovelandcommercial.com> To: <gschlueter@fcgov.com>, <esaunders@fcgov.com> Date: 4/27/2010 1:39 PM Subject: North College Marketplace Wetlands Acceptance Punchlist Matrix CC: <mfreeman@fcgov.com>, Christina Vincent <cvincent@fcgov.com>, <solt@fcgov.com>, Eric Holsapple <eholsapple@lovelandcommercial.com>, Nathan Klein <nklein@lovelandcommercial.com>, <jlaugel@connellresources.com>, John Warren <jwarren@connellresources. com> Glen & Erica, Attached please find the punchlist for the North College Marketplace Wetlands Acceptance as originally drafted by the URA. Per our meeting last Tuesday afternoon I compiled the punchlist into matrix so all parties are aware of the solution and completion date. As you will see final completion date is 4.30.10. Please contact me for any questions, thank you. Blaine Rappe, CCIM & CPM Loveland Commercial, LLC 1043 Eagle Drive Loveland, CO 80537 Phone 970-667-7000 ext. 101 Fax 970-635-2514 Email: brappeOlovelandcommercial.com www.lovelandcommercial.com " file://C:\Documents and Settings\solt\Local Settings\Temp\GW}0000l.HTM 4/27/2010