Loading...
HomeMy WebLinkAboutMEADOWVIEW CAMPUS OF FORT COLLINS - PDP - 2-08 - CORRESPONDENCE - MODIFICATION REQUEST (3)M ��11s/ 306 East Magno0a Saeet Fort COMM CO 80634 2. This is a unique site and the project addresses an existing need in Fort Collins for senior housing and creation of new jobs. The project does not impair the intent of the Land Use Code to alleviate any defined city wide problem. The granting of the modification will not be detrimental to public good (Sec. 2.8.2(H)). 3. It is our intent to avoid impairing the view of as many of our neighbors to the west of the project as possible. Our design leaves a number of view corridors unblocked. Thank you for considering this request for build -to -line modification. Best regards, V'Q � A�f Fred D. Fuller Project Liaison MeadowView of Fort Collins 970-482-6676; 970-482-5570 Fad 970-402-1958 Cea a 11 306 East MSFndb Sbaet Fort C0 1 % CO 60634 May 7, 2008 Stephen Olt City Planner Current Planning Department 281 North College Ave. Fort Collins, CO 80522 Stephen, This letter is a request for a building set back modification for the MeadwView of Fort Collins project. Section 3.5.3(B)(2)(2) of the Land Use Code requires that 30% of the building shall be located no more than 15' from the right of way for Triangle Drive. Our building cannot meet this requirement for several reasons that meet the Build -to -Line exceptions for a set back modification. 1. The topography of the site is steep and difficult. It presents some strict limitations for structure and location of parking. To the west edge of the site is an irrigation ditch. The building must be 50' away from the center of the ditch bank. In addition, the ditch bank serves as a wild life corridor and natural habitat. This side of the project leaves no room for a paved driveway. In order to move the building within 15' of the Triangle Drive easement, we would need to place the parking lot on the north side of the design. We have no access to the west. The existing drainage detention area is on the east side of the site. This detention area must remain since it is the drainage pond for the subdivision to the west of our site. The building is sandwiched between the detention area on the east and the ditch/wild life corridor on the west. These factors combined with the compound slope of the lot make a southwest corner parking lot a necessity. Virtually, these factors mean that the only way to create a parking lot on the north side of the building is via a tunnel under the building. This would create an untenable situation for site safety in addition to prohibitive cost increases. The parking lot forces the building away from the curving line of Triangle Drive necessitating this request for set back modification. Section 2.8.2(H)(2) of the Land Use Code says that a modification should be granted due to the fact that strict application of the set back standard will render the project "practically infeasible". Due to topography and exceptional physical conditions strict application of the set back standard will result in exceptional difficulties for the owner (Sec. 2.8.2(H)(3)). 970-462-6676; 970-462-5570 F= 970-402-1956 Cea 7"3'