HomeMy WebLinkAboutCHICK-FIL-A, MINOR AMENDMENT - MA0900004 - CORRESPONDENCE -Steve Olt - chick filet site Page 1
From:
Helen Migchelbrink
To:
Jeff Scheick
Date:
9/24/2008 5:08:32 PM
Subject:
chick filet site
Jeff:
Sheri and I met on site today to look at the proposed restaurant. I conferred with Joe Olson and Mike
Herzig as well. Joe indicated a quick look at the mobility characteristics before and after a right turn lane
showed negligible improvement. Mike indicated the right turn lane project was never advanced due to
obvious funding constraints with the irrigation ditch. The four lane section of Horsetooth appears to be
adequate as constructed and I cannot foresee a time that reconstruction of this roadway would be
warranted.
I am recommending that we drop our request for the additional 7.5 feet of right of way as well as the
dedication of the 12 feet needed for a turn lane. The redevelopment of this site from its current use to that
of a Chick Filet appears to be reasonable and will not deleteriously impact the current roadway network.
Helen
CC: Joe Olson; Mark Jackson; Mike Herzig; Sheri Langenberger; Steve Olt
'Steve Olt - RE: FW: Ft Collins Marketplac-_ Page 3
1. Confirmation that we will be approved under a Minor Amendment.
Is it a Type I or II review? If it's a Type II review, can that be done
before a zoning officer at an administrative hearing or do we have to go
before P & Z?
2. Will a ROW be required? If so, how much and what triggers the
request? Depending on the ROW decision, does the code require us to
prepare a traffic study?
3. What, if any, extraordinary street and sidewalk improvements
will be required? Of course we will repair any damage caused by our
construction.
4. How to resolve the various setback issues.
5. Chick's main entrance will face south toward the parking lot as
Chick would not be willing to have the entrance conflict with the
drive-thru lane. How do we resolve this comment?
6. Ideas for satisfying this condition given the building
orientation.
7. Do the elevations we shared of Chick's building generally
accomplish this objection subject to specific detail review?
8. Do the elevations we shared of Chick's building generally
accomplish this objection subject to specific detail review?
9. Specific Development Standards we would need to address.
I apologize for not fully expressing why I suggested waiting until the
end of next week for a reply. I thought that would give you and the
staff the time to prepare a more thorough response, as opposed to an
isolated answer on the ROW. Time is crucial, but I also need to
demonstrate we are making progress on all the issues required for
approval, so I set the deadline later with this in mind. BHA can meet
with the staff again before the end of next week to work through details
if that would be helpful. I'm not asking for a final conclusion, just
significant progress and clarity. If this is unrealistic, then I would
like to know the answer on the ROW by the end of this week and when you
could send a more comprehensive reply to the rest of the items in
Steve's letter.
Thank you,
Allen Ginsborg
Managing Director & Principal
NewMark Merrill Mountain States
5700 Hearthstone Circle
Fort Collins, CO 80528
970-377-1135
', Steve Olf - RE: FW: Ft Collins Marketplac, . Page 2
P `
-----Original Message -----
From: Jeff Scheick [mailto:jscheick@fcgov.com]
Sent: Friday, September 26, 2008 10:18 AM
To: Luke McFetridge
Cc: Helen Migchelbrink; Mike Freeman; Steve Olt; Allen Ginsborg
Subject: Re: FW: Ft Collins Marketplace
Thanks Luke and Allen. I have asked Steve and Helen to write a response
on the matters raised below. I believe we will be able to show
"progress" on many of the items below (minor amendment, right of way),
but not sure if we will be able to check off all of the things below.
We will be in touch next week.
>>> "Luke McFetridge" <LMcFetridge@poudre.net> 9/24/2008 4:25 PM >>>
Jeff,
Due to Allen's travel I am sending the below message on his behalf.
Thank you again for taking the time to meet with us yesterday.
Thank you,
Luke McFetridge
Jeff,
I appreciate the time you and the staff took to meet with us yesterday.
I've attached the site plan with the utilities plotted in the easement
on Horsetooth. We've asked TST to double check to see if they have
missed anything and will let you know if they discover anything new.
Let me explain what I was thinking when you asked when I needed a reply
from staff, or really what I would like the reply to contain. I'm
looking for clarity and certainty to the extent open items can be
resolved. Ideally I need to give a letter from the City to Chick to
demonstrate we are making progress. So when I said the end of next
week would be OK, what I am looking for is an updated copy of the letter
Steve sent on 9/10 by then. These are the specifics of what I need to
know sequenced to the paragraph numbers in Steve's letter:
Steve Olt -letter 10-1-08.pdf Page 1
City of
art Collins
October 1, 2008
Mr. Allen Ginsborg
Managing Director and Principal
NewMark Merrill
5700 Hearthstone Circle
Fort Collins, CO 80528
Planning, Development & Transportation
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins. CO 60522.0580
970.221.6606
970.221 M78 - fax
fcgov.com/engineering
Re: Chic-fil-A Right -of -Way Requirements, Horsetooth & College Ave.
Dear Mr. Ginsborg:
The City Engineering Department has evaluated its current standards and future needs for street
improvements, roadway widening and a dedicated right turn eastbound on Horsetooth at the
intersection with College. While additional right-of-way dedication would be needed to construct
ultimate improvements to meet the current Larimer County Urban Area Street Standards and a
dedicated right turn lane may have some benefit at this intersection, City Staff has determined
through site inspection, plan review and preliminary traffic modeling that the cost to construct
this widening and right turn lane improvements would be very high and would not likely yield
significant benefits to the functionality of this intersection. It is not likely that a project to widen
Horsetooth and construct a dedicated right turn lane would be considered at this location in the
foreseeable future.
Based on time findings, the City has determined that this proposed restaurant development will
not be required to dedicate any additional right-of-way on Horsetooth. However, if the site could
be designed such that the City could ultimately obtain the necessary right-of-way and funding
needed to construct a dedicated right turn lane it would be beneficial to the overall traffic flow in
the area. If you have any questions or concerns please call me at 221-6340. I look forward to
working with you in the future.
Sincerely,
&L A-�
Helen Migchelbrink, P.E.
City Engineer
I Steve Olt - RE: FW: Ft Collins Marketplac, Page 3
I apologize for not fully expressing why I suggested waiting until the
end of next week for a reply. I thought that would give you and the
staff the time to prepare a more thorough response, as opposed to an
isolated answer on the ROW. Time is crucial, but I also need to
demonstrate we are making progress on all the issues required for
approval, so I set the deadline later with this in mind. BHA can meet
with the staff again before the end of next week to work through details
if that would be helpful. I'm not asking for a final conclusion, just
significant progress and clarity. If this is unrealistic, then I would
like to know the answer on the ROW by the end of this week and when you
could send a more comprehensive reply to the rest of the items in
Steve's letter.
Thank you,
Allen Ginsborg
Managing Director & Principal
NewMark Merrill Mountain States
5700 Hearthstone Circle
Fort Collins, CO 80528
970-377-1135
www.newmarkmerrill.com <http://www.newmarkmerrill.com/>
CC: Luke McFetridge; Marc Virata; Mark Jackson; Mike Freeman; Randy Maizland; Sheri
Langenberger; Steve Olt
Steve Olt - RE: FW: Ft Collins Marketplac- Page 2
Thank you,
Luke McFetridge
Jeff,
I appreciate the time you and the staff took to meet with us yesterday.
I've attached the site plan with the utilities plotted in the easement
on Horsetooth. We've asked TST to double check to see if they have
missed anything and will let you know if they discover anything new.
Let me explain what I was thinking when you asked when I needed a reply
from staff, or really what I would like the reply to contain. I'm
looking for clarity and certainty to the extent open items can be
resolved. Ideally I need to give a letter from the City to Chick to
demonstrate we are making progress. So when I said the end of next
week would be OK, what I am looking for is an updated copy of the letter
Steve sent on 9/10 by then. These are the specifics of what I need to
know sequenced to the paragraph numbers in Steve's letter:
1. Confirmation that we will be approved under a Minor Amendment.
Is it a Type I or II review? If it's a Type II review, can that be done
before a zoning officer at an administrative hearing or do we have to go
before P & Z?
2. Will a ROW be required? If so, how much and what triggers the
request? Depending on the ROW decision, does the code require us to
prepare a traffic study?
3. What, if any, extraordinary street and sidewalk improvements
will be required? Of course we will repair any damage caused by our
construction.
4. How to resolve the various setback issues.
5. Chick's main entrance will face south toward the parking lot as
Chick would not be willing to have the entrance conflict with the
drive-thru lane. How do we resolve this comment?
6. Ideas for satisfying this condition given the building
orientation.
7. Do the elevations we shared of Chick's building generally
accomplish this objection subject to specific detail review?
8. Do the elevations we shared of Chick's building generally
accomplish this objection subject to specific detail review?
9. Specific Development Standards we would need to address.
,-Steve Olt - RE: FW: Ft Collins Marketplace Page 1
r
From: Helen Migchelbrink
To: Allen Ginsborg; Jeff Scheick
Date: 10/1/2008 4:56:50 PM
Subject: RE: FW: Ft Collins Marketplace
Allen:
Attached please find my letter describing the City's position concerning your need to dedicate right of way
along Horsetooth Road. As I indicated to you last week, our position is that our previous request for right
of way dedication is no longer being required for your proposed redevelopment of the old Nate's site into a
Chick Filet. I spoke with Steve Olt earlier today --he will be sending you a letter tomorrow that covers all of
the information you requested in your email. I thought it prudent that I write you this letter so that you had
formal documentation of our position on the right of way dedication. Please call or email me if I can be of
assistance. Regards,
Helen
>>> "Allen Ginsborg" <aginsborg(aDooudre.net> 10/1/2008 9:48 AM >>>
Jeff,
We had a good call with Chick on Monday and are close to wrapping up
their lease. I told them to expect an updated response to Steve's 9/10
conceptual review letter this week, so let me know if your team is still
on track to send it to me by Friday. The more thorough the letter the
better, even if I have to tell Chick it will be early next week before
we get it.
Thank You,
Allen Ginsborg
Managing Director & Principal
NewMark Merrill Mountain States
5700 Hearthstone Circle
Fort Collins, CO 80528
970-377-1135
www.newmarkmerrill.com
-----Original Message -----
From: Jeff Scheick [ma iIto: ischeick(cDfcoov.coml
Sent: Friday, September 26, 2008 10:18 AM
To: Luke McFetridge
Cc: Helen Migchelbrink; Mike Freeman; Steve Olt; Allen Ginsborg
Subject: Re: FW: Ft Collins Marketplace
Thanks Luke and Allen. I have asked Steve and Helen to write a response
on the matters raised below. I believe we will be able to show
"progress" on many of the items below (minor amendment, right of way),
but not sure if we will be able to check off all of the things below.
We will be in touch next week.
>>> "Luke McFetridge" <LMcFetridge(a�ooudre.net> 9/24/2008 4:25 PM >>>
Jeff,
Due to Allen's travel I am sending the below message on his behalf.
Thank you again for taking the time to meet with us yesterday.