Loading...
HomeMy WebLinkAboutKING SOOPERS FUELING STATION (CEDARWOOD PLAZA) - PDP - 40-07 - CORRESPONDENCE - SITE PLANOlt - KS #9 Fueling - Ft. Collins, CP')007-11-02.pdf 0 Page 1 moo r '4 L -----neon'-------- k I111 fill RD. 2MO 30* J II I M RBFAGIIV GallowayO Txrt nuRD FOW COLLINS. CGLWrm Steve Olt - KS1 12 Xsite-prop-90.pdf Page 1 L -0 I5,affl 17- W cs 6, T, —W-- 0 lilt llr R TTM-W — — — — — — RD. 2W 30* O T a Galloway I H L RD S, M. ±Steve Olf-KS112-mfd response 11-02-0' -)df Page j] Gaaeoway Planning. Architecture. Engineering. November2, 2007 City of Ft. Collins 281 N. College Ave., 1st Flow Ft. Collins, CO 80522 Attention: Steve Ott & Sheri Langenberger Re: King Soopers Fueling Store # 9 -Taft Hill & Elizabeth Dear Steve & Sheri, This letter is in response to the October 9, 2007 comments received regarding the layout of the proposed fueling facility at Taft Hill and Elizabeth Street. There was Concem that the fueling trucks would be wading to complete their entry due to motorists exiting the site or waiting for a pump and that perfect movements would need to happen in order for the site to work. IGng Soopers typically makes fueling deliveries during off-peak hours when there is less of a chance for conflicts with vehicles and pedestrians. The attached exhibit shows the truck movement into the site from Taft Hill Rd and shares the only time the truck would have to wait is if someone is exiting the fueling station on to Taft Hill Rd they could then exit in fnxd of the truck. There would never be a time when the fueling truck would be waiting in the street for someone to finish fueling. There is adequate room on the south side of the site for the truck to pull in and wait. It is common for any type of delivery truck to wait when making a delivery. The truck turning exhibit shows the rear wheels of the truck stay within the driveway flare area and that pedestrians standing on the sidewalk are in no danger of getting hit by the fueling truck. The driveway width on Taft Hill Rd. has been reduced to meet City of Fort Collins commercial driveway standards (detail drawings 706 & 707). Attached is an AutoCAD v 2004 copy of the drawing file for you to do an analysis of the turning template. If you require an earlier version please let me know. An ademate layout is attached with the canopy and cars parked with a 90 degree layout, this layout will block cars fueling from the center island as well as access to the site from the grocery center, with inadequate clearances at the sides for two way traffic. We feel that a meeting to discuss all these comments would be very beneficial to all parties. Please let us know when a good time would be to meet. Sincerely, Galloway Matthew Duhaime P.E., P.LS. Senor Project Engineer mattduhaime@gall owayuS.com cc: Mike Scheckel -IGng Soopers KS112-rrfd response 11-02-07.doc Galloway & Company, Inc. • Phone 303.770.8884 a Fax 303.770.3636 • 5350 OTC Parkway, Greenwood Village, CO 80111 • www.gallowayUS.com Steve Olt - TEXT.htm Page 1 Steve: Attached is our response letter to your comments (KS112-mfd response 11-02-2007.pdf) ,a revised site plan for your review (KS #9 Fueling — Ft. Collins, CO 2007-11-02.PDF), an alternate site plan with the canopy and Kiosk rotated at 90 degrees (KS112 Xsite —prop-90.pdf) and the AutoCAD file as requested for your review. If you have questions please let me know. Galloway fta rg Am;ecuxe fngne** ng MATTHEW F. DUHAIME, PE, PLS, CFPM, LEED AP 5350 DTC Parkway Greenwood Village, CO 80111 303.770.8884 O 303.519.6732 C 303.770.3636 F mattduhaimena aallowayUS.com www.gallowayUS.com This message and any attachments are intended only for the recipient named. If you are not the intended recipient you are notified that any dissemination, disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. Galloway considers any design data to be in final form only when plotted, stamped & signed. Galloway assumes no responsibility for the unauthorized use of this data.