HomeMy WebLinkAboutKING SOOPERS FUELING STATION (CEDARWOOD PLAZA) - FDP - 40-07/A - CORRESPONDENCE - (4)Steve Olt City of Fort Collins - Planning 1 /14/2009 Grading plan 5 of 6 — depth of detention pond revised/added added blue grass to note, curb cuts/openings additional text labeling added Copies of the redlines and revised sets are included with the resubmittal. Please notify me when 1 can submit mylars. Sincerely, Galloway Matthew Duhaime Senior Civil Project Engineer mattduhaime@gallowayUS.com cc: file 2.12.4 KS112-mfd-Final Response 2009-01-13.doc Galloway & Company, Inc. • Phone 303.770.8884 • 5350 DTC Parkway, Greenwood Village, CO 80111 • www.gallowayUS.com Steve Olt City of Fort Collins - Planning 1 /14/2009 Number: 119 (11/26/08) The Cut-off wall being used to keep water from draining/seeping under the street section on Taft Hill should be extended in at right angles on both ends for at least 3 feet. See redlines for clarification. Response: The cut-off wall has been extended X at 90 degrees into the site. Number: 120 (11/26/09) Please specify some method of sealing the joint between the top of the cut -of wall and the curb & cutter section so that water cannot infiltrate through the joint. See the detail on the bottom of sheet 5 for clarification. Response: The proposed waterproof membrane has been added to the wall to seal the joint between the concrete cut-off wall and the bottom of the curb, see the detail on sheet 5. Number: 121 (11/26/08/ See scanability comments on Detail Sheet 6. Additionally, the sidewalk chase drain detail 709 was. revised and updated 2007. Please use the updated detail and also insert City of Fort Collins Stormwater Detail D-10 on the detail sheet. I can provide you with this detail if you do not have access to it. Response: Detail 709 has been revised and Detail D-10 has been added, all of the details have been enlarged to allow scanability. Topic: Technical Services Response to redline markups: Site Plan - bubble not conflicts were addressed Landscape Plan — Text conflicts were addressed and blue grass added in detention pond. Issue Contact: Wes Lamarque Topic: Stormwater Number: 107 (11/21/08) The City would like a more manicured grass in the parkway where the water quality treatment is being proposed. Irrigation would be allowed even though this is a water quality treatment area. Sod cannot be used due to the clay soils that sod is farmed in. However a blue grass, fescue, or similar type grass seed mix can be used. Response: Blue grass seed mix is shown. Number: 108 (11/21/08) Please see other minor comments on the relined plans. Response to redline markups: Galloway & Company, Inc. • Phone 303.770.8884 9 5350 DTC Parkway, Greenwood Village, CO 80111 • www.gallowayUS.com Steve Olt City of Fort Collins - Planning 1 /14/2009 Number: 113 (11/26/08) Please enlarge and use bolder text for the Alta Survey FOR REFERENCE ONLY designation in the bottom right corner of the sheet. Response: The Sheet designation has been increased in size (159/6) and bold type was used. Number: 114 (11/26/08) Please show all proposed asphalt cuts as perpendicular intersection lines. Radius cuts are not likely to happen. Response: All asphalt cuts are shown as perpendicular. Number: 115 (11/26/08) Please remove note 28 from the access ramps shown on the driveways. The ramps will be constructed per the driveway detail 707 and not 1606 or 1607, which are to be used at the street comer only. The driveway ramps should utilize the curb option rather than the flare option on the backside. See redlines for clarification. Show curb rather than flare on the plans. Response: Note 28 has been removed and the flares have been removed from the handicap ramps. Number: 116 (11/26/08) The driveways are called out with 20 foot radius but it is not drawn correctly on the plans. Please show the driveway radius correctly at 20 feet continuous from back of sidewalk to flow line. See Detail 707 and relines for clarification. Response: The distance between the flow line and the property line varies from 10.5' to 15.5' feet it is impossible to have the curb return match detail 707 without moving the interior curbs/walks into the site to meet the 20' radius. The City staff directed the use of 20' radius returns. If the City requires the curb, return to be perpendicular to the property line a radius of less then 20' is required. Because the city comment cannot be complied with, no changes were made. After discussions with Randy he agreed to leave the curb radius at 20'. Number: 117 (11/26/08) Please remove the horizontal groove lines from the H.C. ramps at the intersection corner. Groove lines should not be tooled into the ramp as this is no longer the standard. Only truncated domes are necessary per the LCUASS detail. Response: The groove lines are removed. Number: 118 (11/26/08) Pleas correct all line over text conflicts on the Grading Plan sheet. See relines. These conflicts do not meet scanability requirements of LCUASS Appendix E. Response: The text conflicts have been revised. Galloway & Company, Inc. • Phone 303.770.8884 • 5350 DTC Parkway, Greenwood Village, CO 80111 • www.gallowayUS.com alfl, Planning. Architecture.=ngineenng. January 14, 2009 Steve Olt — Planning Department City of Fort Collins 281 N. College Ave., 1st Floor Ft. Collins, CO 80522 Re: King Soopers #9 Fuel Station Dear Steve, RECEIVED JAN 15 2009 00 Attached are our comments from responses received from the City of Fort Collins my response follows in italics. Issue Contact: Randy Maizland Topic: Engineering Number: 109 (11/26/08) Please submit a signed deed of dedication and legal exhibits for ROW on Taft Hill and Elizabeth as reviewed and approved by the City Attorney regarding deed language. Response: Copies of the signed dedication and legal exhibits for the Right of Way have been delivered to the City Attorney office, please contact the City Attorney for copies, we have not received a copy of the dedication documents. Number: 110 (11/26/08) Please submit an off -site temporary construction and public access easement signed deed of dedication and legal exhibits for the cross lot access being constructed into the King Soopers parking lot area. Response: King Soopers Number: 111 11 /26/08) Please revise title block on the utility Plan set to match the title at the top of the cover sheet (Typ). See relines for clarification. Response: The title block has been revised on all of the sheets. Number: 112 (11/26/08) The project title does not need to be provided at the top of every sheet in the utility Plan set. You may leave it if desired but it it's not preferred. Response: We have elected to leave the title on top of every sheet. It helps us separate the site plan set from the utility set. Galloway & Company, Inc. • Phone 303.770.8884. 5350 DTC Parkway, Greenwood Village, CO 80111 • www.gallowayUS.com