// review meeting:
r13vunJry cloS�s 9oudJ'SurHL As /-e{vY,C, Ake-t load
�February 27, 2008
SC.4Nx;iNl I SSucr 491, L1_4,vos.4A,o#- /T GUOuGo 1-11ezp
/F r74G S N4A 6 �,.,y vNoc rt Au 7-14C i 6 A7- 141AS-
/2Emok/e�.
Note - Please identify Your redlines for future reference
No Problems
® Problems or Concerns (see below, attached, or DMS)
Name (please p nt)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
C,rP]at 'site _Drainage Report _Other
_Utility _Redline Utility _Landscape
Mar.21. 2008 2:16PM XCEL FORT COLLINS
No. 2168 P, 1
,a
CiivoEE� C
Planning and Zoning
PO Roz 580
Fort Collins, CO 80522-0580
Fn c: 970-416-20'0
FINAL PLAN
COMMENT SHEET
0
DATE: February 4, 2008
TO: Xcel Energy
PROJECT PLANNER: Shelby Sommer
#31-06/B LIBERTY FARMS PDP
Please return all comments to the project planner no later than the staff
review meeting:
February 27, 2008
• NO- TISES PIA14TEO WITH IN f' OF 6PJ SLRVIC" DP_ MAI IX.
• NEAREST GAS MRIN Lf LDCATBO AT AIDLTH SIDS OF /NTERJMTIAV
OF VINE AMD TIMBERLINE.
&Nr EXrruitON CP &*j LiMS1 V."OULO BE /N llM&#tObNGE TD rAf Fl<7: POL r,
ON Rlr _dole �J+QSepa nnr'y VOtlr ret for future reference
lV le ill ones
❑ No Problems
2Problems or Concerns (see below, attached, or DMS)
Naive (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
flat V'O�S'ite _Drainage Report _Other
'Utility _Redline Utility ✓f andscape
East Larimer County Water District
February 21, 2008
Shelby Sommer, Planner
City of Fort Collins Planning
PO Box 580
Fort Collins, CO 80522
RE: Liberty Farms PDP
Dear Shelby:
I have reviewed the Liberty Farms PDP. Several sheets are marked up with additions,
mostly labeling. Two locations require additional detailing for easier reference. The
drawings have been transmitted to the engineer.
Please call or write
cc: Trina Colvin, DMW Civil Engineers
232 South Link Lane, P.O. Box 2044 • Fort Collins, Colorado 80522 0 Phone (970) 493-2044 • Fax (970) 493-1801
City of Fort Collins
Planning and Zoning
PO Box 580
Fort Collins, CO 80522-0580
Far: 970-416-2020
FINAL PLAN
COMMENT SHEET
/ 0/0, 1
DATE: February 4, 2008
TO: ELCO
PROJECT PLANNER: Shelby Sommer
RECEIVED
FEB 0 5 2008
ELCO WATER DISTRICT
#31-06/B LIBERTY FARMS PDP
Please return all comments to the project planner no later than the staff
review meeting:
February 27, 2008
Note - Please identify your redlines for future reference
❑ No Problems
❑ Pm�lems or Concerns (see below, attached, or DMS)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
25 February 2008
Mr. Randy Maizland
City of Ft. Collins, Engineering
281 North College
Ft. Collins, Colorado 60521
Re: Liberty Farms Off -Site Sanitary Sewer — Railroad Crossing Permit
Dear Randy,
The above -referenced project representatives have recently contacted me regarding a railroad
crossing permit for the Burlington Northern Sante Fe (BNSF) railroad that the project's off -site sanitary
sewer will need to cross along Vine Drive. You and I spoke on the telephone last Friday, 22 February
2008 regarding what I understand to be the City of Ft. Collins (City) requirement that this permit be in
place before the City would grant the project approval. This letter seeks to document the conclusion of
our discussion being that for this specific situation, the permit to cross the railroad will not be required
at this time. Reasons for that being:
1. License Agreement Would Expire Before Construction: My reading of BNSF's license agreement
requires that the infrastructure (i.e. the sanitary sewer crossing of the railroad) be installed within one
year of when to permit is granted, else the permit is voided. Due to the fact that an off -site sewer of
over 1-mile in length, that has yet to be designed and approved, would have to be in place before this
crossing could be connected to sanitary sewer service, it is doubtful that the crossing would be
constructed before the permit expired. The permit cost is $2500 and this fee would be unnecessarily
spent if this occurred. The District fully anticipates working with the developer and the railroad to
acquire the necessary permits to make this crossing when the timing is appropriate.
2. Insurance Coverage: If the crossing agreement were to be completed today, before the line would
be installed and placed into service, the District would be required (per BNSF's license agreement) to
place this crossing within its liability insurance coverage package. There would be a cost associated
with this for which the District would not be realizing a just method of cost recovery (i.e. no sanitary
sewer taps connected to the line, no payment of sewer fees to the District from the beneficiaries of the
line, from which the District's sewer fees generate revenue).
If there are questions, please contact me at 970-498-0604
Thank you.
"ens,
District Engineer
EC: Don Tiller
S:\DEVELOPMENTtBasinslWest_Basin\Cooper_Slough_lnterceptor Subbasin\Liberty-FarmslDesign
Review12008-2-25-Maizland.doc
3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 • Fax (970) 498-0701 9 Email bsd@verinet.com
• Storm Drain: Show storm drain at east of Cherryhurst Road, to east of sewer
main end. Need to view this to determine/verify that sewer main can be
extended to east in future if needed.
• Manhole MH-14 Invert Call Outs: Need to call out both "Inv In" elevations, see
redlines on drawings.
18 of 37a Eliminate Manhole: See redlines on drawings — attempt to eliminate manhole.
1 34 of 37 I ■ Add District Details: Elder Valve and Cleanout details (emailed to engineer)
Regarding the off -site sanitary sewer, the District plans to continue to work closely with the developer
and their engineer to identify an appropriate route and diameter to accommodate future sewer needs
in the area that will drain by gravity to this off -site sewer.
If there are questions, please contact me at 970-498-0604.
Thank you.
S9ndy
R s, P.E.
District Engineer
EC: Jade Miller, DMV Engineers
Don Tiller
25 February 2008
Ms. Shelby Sommer
City of Ft. Collins, Planning and Zoning
P.O. Box 580
Ft. Collins, Colorado 80522-0580
Re: Liberty Farms Onsite Sanitary Sewer: #31-06/b Liberty Farms PDP
Dear Shelby,
The submittal package for the above referenced project, dated 04 February 2008, was received in the
Boxelder Sanitation District (District) office on 05 February 2008. District staff has completed its review
of the submittal and, has the following comments.
Sheet #
--- ; ;_. - ... _ _ ...-.-.._. Comment:,.---
2 of 37
i Need to"include District general notes (will 6e emailed to engineer;
• Off site sanitary sewer as,.proposed will not be acceptable due. to congestion of
ut6fies in�roadway.(especially Timberline Road) and worker safety hazards that
will be presented to District field staff (annual, -maintenance_Iri,busy roadway„
especially in future
15 and 16 of
0 District has been working with the developer and their engineer to identify an
37
alternate off -site sewer route
• District staff is currently working with the developer and their engineer to plan
for sanitary sewer oversizing that will be required
• Notes: Include Interceptor Sanitary Sewer Notes on each plan and profile sheet
emailed to engineer)
_
■ Railroad Crossing: Casing pipe to be steel instead of DIP .
■ Railroad Crossing Permit: The District understands that the City requires all
l5 or si
develonment£ have easements and permits in place. befora Poornyal is qran}or{
Due to various constraints, the railroad crossing permit is not expected to be
acquired at this time per discussions between the District (Randy Siddens)_and
Randy Maizland. See separate letter, attached.
17 and 18 of
Notes: Include District Sanitary Sewer Notes on each plan and profile sheet
37
(emailed to engineer)
• Sewer services from buildings: Label stationing (STA) along profile of service
connection to sewer main .
• Crossings of other utilities: Label clearance on profile I
17 of 37 i
Drop.of sewer across manholes: Reduce from 0.2 ft to 0.2 ft.
Sewer main slope: Slope at 0.4% unless design flows as calculated by engineer
identified need for sewer to be at steeper slope. This, along with -bullet - item j
above will. allow sewer at end of Cherryhprst Road to bee deeper, and potentially
extend to east for future connection of other projects.- - -
- !
Eliminate on manhole at east end of Cherryhurst Road (see redlines on
.. . ..
i
drawings)
SAD EVE LOP MEWnBasins\West_Basin\Cooper_Slough_Interceptor_Subbasin\Liberty-Farms\Design
Review\2008-2-25-1 st-review-comments.doc
3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 • Fax (970) 498-0701 • Email bsd@verinet.com
Number: 183 Created: 2/26/2008
[2/26/08] On Sht 19 of 37, show/label existing 30-inch City water line in the plan and
profile views. (A copy of the plan sheet for the 30-inch main is inserted in the
redlined utility plans.)
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 155 Created: 2/15/2008
[2/15/08] No comments
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
4w,pq &W�
Shelby Sommer
Associate Planner
Page 7
•
[3/3/08] The turn lane transitions on Cherry Hurst need revising to use curvature
instead of angle points. Minimize the transitions to 75' to 100' to maximize storage.
Use curvature instead of angle points on the Timberline left turn bay also.
Number: 194 Created: 3/3/2008
[3/3/08]-
Department: Transportation Planning Issue Contact: Denise Weston
Topic: Transportation Planning
Number: 182 Created: 2/26/2008
[2/26/08] The proposed street network does comply with the existing Master Street
Plan (12-18-07) but please be aware that the City will soon initiate an update to the
Mountain Vista Sub Area Plan.
Department: Stormwater-Water-Wastewaterlssue Contact: Basil Harridan
Topic: Stormwater
Number: 166 Created: 2/25/2008
1. Please provide a preliminary grading design for the future channel on the east
side of the site showing how that channel would fit within a 40-foot wide
easement, with 20 feet on either side of the property line.
2. Will the construction of the off -site storm sewer be all within the right of way?
At 20 feet deep, construction easements may be needed from adjacent
property owners.
3. Please discuss how in the future the pond can be retro fitted to.discharge into
the proposed drainage channel to the east. It is suggested that either an
easement is acquired to drain the pond to the east, or provide a retention
pond in an interim condition until future downstream improvements are
constructed.
4. At final a ditch crossing agreement will be needed.
5. For erosion control maybe a perimeter temporary ditch on the south end of
the site along the canal might prevent silt from entering the irrigation canal.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: WaterMastewater
Number: 106 Created: 11 /6/2007
[2/26/08] (Repeat comment)
[11/6/07] The City's 24-inch main in Timberline is cathodically protected. Show the
CP test stations on the plans and add notes to protect in place or if re -location is
required, contact City Water Utilities (221-6700).
Page 6
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 184 Created: 2/27/2008
[2127/08] PFA has no comments or concerns at this time.
Department: Traffic Operations Issue Contact: Ward Stanford
Topic: Traffic
Number: 186 Created: 3/3/2008
[3/3/08] Rodel analysis provides that capacity easily meets volume expectations.
Sht 9 of the Utility plans gives more dimensional information of the Rbt than
previous, but still is missing approach geometric data as modeled in Rodel. Please
provide the approach data on the Rbt Detail sheet.
Number: 187 Created: 3/3/2008
[3/3/08] Some of the geometric dimensions on the Rbt Detail plan (sht 9) do not
correspond to the Rodel values. The Rodel analysis values and the plan geometry
should correspond or there should be analysis or discussion as to how the plan
dimensions meet or exceed the capacity provided by the Rodel analysis. Please
model the planned geometry in Rodel, or provide discussion as to how the Rbt on
sht 9 meets or exceeds the Rodel analysis.
Number: 188 Created: 3/3/2008
[3/3/08] Some of the Rbt plan dimensions (sht 9) do not clearly define their start and
stop points and some dimensions are still not provided, such as half -width and flair
length on the approaches, and inscribed diameter of the Rbt (missing the center
dimension to sum with the other provided dimensions to know the diameter). Please
provide that information on sht 9.
Number: 189 Created: 3/3/2008
[3/3/08] Did not receive a landscape plan. Please provide with next submittal.
Number: 190 Created: 3/3/2008
[3/3/08] Need to add bike alternative route sign at the curb cuts that provide for bike
to use the sidewalk.
Number: 191 Created: 3/3/2008
[3/3/08] Please revise the north end of the painted gore area on Timberline at the
Cherry Hurst access to correlate with a vehicle turning path (much as would be done
for a raised median nose).
Number: 192 Created: 3/3/2008
[3/3/08] No fastest path information has been provided. Please provide.
Number: 193
Created: 3/3/2008
Page 5
•
[2/25/08] Based on discussion with the City Pavement Management Director, the
concrete road section proposed on Chenyhurst should extend and connect to the
concrete roundabout. Because it is an arterial roadway, it is not preferred to have
several concrete to asphalt transitions. Asphalt and concrete costs are almost the
same based on new cost data provided to the City.
Number: 176 Created: 2/25/2008
[2/25/08] Please provide a crack control jointing detail for the concrete pavement on
Cherryhurst and for the roundabout.
Number: 177 Created: 2/25/2008
[2/25/08] Timberline Road Design — The interim and ultimate Timberline design
needs to be shown for the entire street cross section along the frontage of the
property with cross sections for both provided every 50 feet. The preliminary off -site
design needs to show centerline and both flowline profiles as well as cross sections.
Please refer to LCUASS 7.4.1(8) for off -site design requirements. There will likely be
medians and turn lanes into the site with the ultimate design. The ultimate cross
sections should show how the crown of the road will be constructed with respect to
the median locations.
Number: 178 Created: 2/25/2008
[2/25/08] The vertical curve shown on sheet 29 does not meet minimum curve
length requirements outlined in LCUASS Figure 7-17 and 7-18. Design speed of 45
mph, algebraic grade difference of 5-6 percent. Please revise the curves and show
the flowline profiles for off -site preliminary design as well per LCUASS 7.4.1(8).
Number: 179 Created: 2/25/2008
[2/25/08] The Cherryhurst — Timberline intersection detail on sheet 32 must show
the crown transition length (min. 30 feet) and elevation points. Please refer to
LCUASS Figure 7-27.
Number: 180 Created: 2/25/2008
[2/25/08] Please be sure to revise the Site and Landscape Plans to be consistent
with the Utility Plans.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 153 Created: 2/5/2008
[2/5/08] Light & Power Engineering will need to know the power requirements for
each building before the electric utility facilities can be designed. The developer will
also need to coordinate with Light & Power Engineering the locations for electric
transformers. The dimensions of, and clearance requirements to the transformers
will vary depending on the building power requirements. Normal electric
development charges will apply.
Page 4
Number: 158 Created: 2/22/2008
[2/22/08] Small line/text conflicts on the site plan, especially where sidewalks are
dimensioned (see redlines). Please try your best to clean these up and make them
as clear as possible so that they will scan well.
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 167 Created: 2/25/2008
[2/25/08] There are many line over text conflicts throughout the plan set that must
be fixed prior to producing mylars. Please see LCUASS Appendix E for scannability
requirements.
Number: 168 Created: 2/25/2008
[2/25/08] Please show and label the approximate limits of street cut on Timberline
on the Overall Utility Plan sheet 4. Provide the standard street cut note.
Number: 169 Created: 2/25/2008
[2/25/08] Please try to locate the City signature block on the lower right comer of all
sheets.
Number: 170 Created: 2/25/2008
[2/25/08] The parkway width dimensions on the Horizontal control plan sheets
should include the curb head. 10 feet on arterials, 6 feet on collectors.
Number: 171 Created: 2/25/2008
[2/25/08] Roundabout Detail — The pedestrian ramps do not connect to the flow
lines. Please show how the ramps will flare out. See redlines sheet 9 for
clarification.
Number: 172 Created: 2/25/2008
[2/25/08] Roundabout Detail — The roundabout cannot use pans to convey water
across the access or exiting approach. Please see LCUASS Appendix I, section
1.1.4 regarding drainage.
Number: 173 Created: 2/25/2008
[2/25/08] LCUASS Appendix I requirements for roundabout details have not been
met. Please provide information regarding truck apron slope, mountable curb type,
colored concrete for apron etc...
Number: 174 Created: 2/25/2008
[2/25/08] The roundabout designing engineer shall make specific recommendations
for sight distances, related to signage, landscape etc...
Number: 175
Created: 2/25/2008
Page 3
•
Number: 162 Created: 2/22/2008
[2/22/08] Trash enclosures need to be designed for walk-in service so that the main
gates do not need to be opened. This may be dimensioned on the enclosure detail,
but it is not clearly labeled. Also, please label swing gate material and color.
Number: 185 Created: 2/29/2008
[2/29/08] Forestry (Tim Buchanan): These notes should be added to the landscape
plan:
"The soil in all landscape areas, including parkways and medians, shall be
thoroughly loosened to a depth of not less than 8 inches and soil amendment
shall be thoroughly incorporated into the soil of all landscape areas to a depth
of at least 6 inches by tilling, disking or other suitable method, at a rate of at
least 3 cubic yards of soil amendment per 1,000 square feet of landscape area.
A permit must be obtained from the City forester before any trees or shrubs as
noted on this plan are planted, pruned or removed on the public right-of-way.
This includes zones between the sidewalk and curb, medians and other city
property. This permit shall approve the location and species to be planted.
Failure to obtain this permit may result in replacing or relocating trees and a
hold on certificate of occupancy.
The developer shall contact the City forester to inspect all street tree plantings
at the completion of each phase of the development. All trees need to have
been installed as shown on the landscape plan. Approval of street tree planting
is required before final approval of each phase. Failure to obtain approval by
the City forester for street trees in a phase shall result in a hold on certificate of
occupancy for future phases of the development."
Topic: Building Elevations
Number: 163 Created: 2/22/2008
[2/22/08] 1 appreciate how the buildings are a variety of colors, but would also like to
see the shingles in different colors for different building types if possible to break up
the monotony.
Topic: Site Plan
Number: 156 Created: 2/22/2008
[2/22/08] Small typo on the Site Plan cover sheet - please change date in Director of
Planning signature block to 2008 or leave as 200_. Otherwise the cover sheet looks
good and is much easier to read than the previous rounds!
Number: 157 Created: 2/22/2008
[2/22/08] One small problem area in the parking area east of Building 2: there are
19 parking stalls without an intervening tree, landscape island/peninsula. A
maximum of 15 spaces are permitted in a row. There is trash enclosure intervening,
but landscaping is also required.
Page 2
9 0.�Pffq, ,,- 0 0
STAFF PROJECT REVIEW
City of Fart Collins
DON TILLER Date: 03/03/2008
2121 Midpoint Dr., Suite 302
FT COLLINS, CO 80525
Staff has reviewed your submittal for LIBERTY FARMS PDP - TYPE II AND FINAL
PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 154 Created: 2/6/2008
[2/6/08] The following departments have no further concerns: Water Conservation,
Park Planning, GIS, Comcast, Poudre School District, Post Office
Number: 164 Created: 2/25/2008
[2/25/08] ELCO Water District (A. Darwin Williams): Several sheets have been
marked up with additions, mostly labeling. Two locations require additional detailing
for easier reference. The drawings have been transmitted to the engineer (DMW).
Number: 165 Created: 2/25/2008
[2/25/08] Building Department (Rick Lee): Please find attached the current codes
and standards with the required pre -submittal code review meeting.
Number: 181 Created: 2/26/2008
[2/26/081 Comments from Boxelder Sanitation District (Randy Siddens) are
attached. A copy of these comments was forwarded by the District to the applicant.
Topic: Landscape Plan
Number: 159 Created: 2/22/2008
[2/22/08] There are some fairly large gaps between the street trees and ornamental
trees proposed near the street lights. Either add another ornamental in these gaps
or replace the ornamentals with regular street trees, at least 40 feet from street
lights.
Number: 160 Created: 2/22/2008
[2/22/08] Why are there no street trees along the western side of Lot 6? If this is an
issue related to the roundabout, let's discuss other solutions.
Number: 161 Created: 2/22/2008
[2/22/08] General Note #6 on landscape plan says that final landscape plan shall
include the total area (in some square feet) for each landscape category. Please
add to plan.
Page 1