Loading...
HomeMy WebLinkAboutLIBERTY FARMS - FDP - 31-06A/B - CORRESPONDENCE - REVISIONSFROM :BOXELDER SAN DIST FAX NO. :9704980701 Sep. 0:3 2008 08:19AM P1 FAX 3201 E. Mulberry *Q, P.O. Box 1518 Fort Collins, CO 80522 970 498-0604 • Fax 970 49M701 e-mail bsd@verinetcom To: City of Fort Collins — Planning From: Fred E. Walker, General Manager•"" Attn: Ms. Shelby Sommer Pagea: 1, Including cover sheet Fax 224-6134 Date: September 3, 2008 Phones 416-2138 Re: Liberty Farms ❑ Urgent ❑ For Action O Please Comment ❑ Please Reply ❑ Please Recycle The District's engineer is still reviewing the adequacy of the proposed design along Timberline. The District expects to have its technical comments soon. Boxelder Sanitation District has the following comment about sewer service to the Liberty Farms development. The District asks that its comments be incorporated into the Development Agreement that the City of Ft. Collins and Liberty Farms agrees to. The proposed sewer line routing along Timberline that will connect Liberty Farms to the District's existing sanitary sewer collection system within the Water Field development is an interim connection. The District Is currently planning the construction of a sanitary sewer interceptor line (North Mulberry Interceptor) that will serve a large basin that will include the Liberty Farms development. Until the North Mulberry Interceptor is installed, the District will allow this interim connection to Its existing collection system through the Water Field development. The signature of Boxelder Sanitation District (District) on the final plat will be contingent upon an Agreement Concerning Sanitary Sewer Service between the District and Liberty Farms being executed prior thereto. &:ADMINrSrRATIONwlasteralT'(�inplates4 dministr--,3tionV'nx\otigr'au.Uuc 9. Service connections to structures require an elder valve (sewer shut-off valve) and a cleanout. Elder valves must be installed upstream of the cleanout and a minimum 3-feet from any wall, overhang or other structure that might limit access to the valve. Elder valves may be purchased from vendors in Fort Collins, Colorado. 10. All construction shall be inspected by District inspector prior to backfill. 11. For off -site sewer line manholes: Manhole rims shall be set flush with the surface when within an all-weather access roadway, rims shall be set 6-inches above grade if they are not within an all-weather access roadway. S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_lnterceptor Subbasin\Liberty-Farms\Design Review\2008-9-4- 2nd-rev iew-co m me nts. d oc Enclosure 4 Notes To: From: Date: Subject: O co File Engineering 05 September 2008 Sanitary Sewer Notes for Plan and Profile Sheets 3201 E. Mulberry Street, Unit Q P.O. Box 1518 Fort Collins, CO 80522 Ph: 970 498- 0604 Fax: 970 498-0701 1. All sanitary sewer line construction shall conform to the latest Boxelder Sanitation District "Standards and Specifications for Sanitary Sewer Pipeline Construction and Improvements." 2. All sewer services shall be minimum 4-inch diameter constructed at a slope of 2% from the building to the sewer main, unless otherwise specified and approved by the District. 3. All 6-inch diameter sewer services shall be constructed at a slope of 1% from the building to the sewer main. 4. When groundwater is encountered clay cut off walls shall be installed on the upstream side of all manholes, in the mid -section of each main line run at intervals not to exceed 300-feet, or as required by the District. See detail sheets for clay cut-off wall detail. 5. Field verify invert elevation of sanitary sewer and basement finished floor elevation for gravity flow prior to constructing foundations. 6. The Contractor shall schedule a pre -construction meeting with Boxelder Sanitation District a minimum of one week before construction to coordinate schedules and clarify any additional District requirements. Contact number is 970-498-0604. 7. Contractor shall notify the District's inspector forty-eight hours prior to start of construction. 8. Contractor shall be responsible for coordinating field locates of all existing utilities prior to any construction. S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_lnterceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2 n d-review-com m ents. doc Enclosure 3 To be on all plan sheets with Boxelder Sanitation District lines/facilities/easements Boxelder Sanitation District Reviewed By: General Manager Date Review does not constitute "approval' of plans. Plan Engineer is responsible for accuracy and completeness of plans. S:\DEVELOPMEN-RBasins\West_Basin\Cooper_Slough_lnterceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2 nd-review-com m ents. doc 13. Concrete: All concrete construction shall be completed utilizing 3,000 psi at twenty-eight (28) days or equal concrete. 14. Pavement or Other Repairs: In event that asphalt or concrete pavement, sidewalks, storm sewers, waterline or any other public or privately owned property is damaged or requires reconstruction due to the work, repairs or replacement will be made in accordance with the requirements of the appropriate governing authority. Private property will be returned to its original condition or as close to original condition as reasonably possible, unless otherwise noted on the drawings. 15. Service Taps on Existing Lines: All taps made on existing lines shall be completed at developer's expense by District personnel or the District's authorized contractor with no exception. 16. Inspection: Construction shall conform to District Standards and Specifications or project specific specifications at all times. The District shall inspect the construction as necessary and shall observe all line testing. The District shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in these Specifications. The District shall also have the authority to assign an inspector to check any and all work, including all materials to be incorporated in the work, excavation, bedding, backfill, testing and all construction methods and practices. The contractor shall contact the District a minimum of 48 hours in advance when they intend to work weekends for scheduling of weekend inspections. 17. Testing: All lines shall be pressure tested and flushed by the Contractor in accordance with District Standards and Specifications and under the District's supervision. Upon passing, copies of all passing test results including soils compaction in the area of sewer main construction shall be provided to the District. 18. Acceptance: Upon completion of all utility construction (sewer and other) and fulfillment of all District requirements, preliminary acceptance of new sewer system improvements will occur in accordance with District's acceptance procedure. 19. Warranty: The Contractor shall warrant the materials, installation, workmanship and surface restoration for a period of two years from date of preliminary acceptance. During this warranty period the Developer shall promptly repair any defects in the work and maintain the work area. At the close of the two-year warranty period the District will make a field inspection. Upon satisfactory correction of any deficiencies noted the District will grant final acceptance of the lines and work. The lines and the appurtenances shall then become the sole property and responsibility of Boxelder Sanitation District. 20. Drawings of Record and Total Costs: Within 90 days of preliminary acceptance of the new facilities, the District shall be provided with acceptable Drawings of Record of the complete system consisting of two sets of fill size reproduced prints, two sets of/2-size reproduced prints, one set of 6 mil double matted reproducible mylars and one complete digital file equivalent (software and version to be confirmed at time of delivery). Written confirmation of the total cost of all sewer system improvements shall also be submitted with the Drawings of Record. S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_Interceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2nd-review-comme nts. d oc 4. Safety: All sewer main installation within the District shall be subject to current (Occupational Safety and Heath Association (OSHA) and the Colorado Safety Association, (CSA) safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 5. Start of Construction: No construction shall begin without prior design review of the District. The District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. 6. Road Excavation Permits: In event that State, County or City road excavation permit(s) are required, the Contractor is responsible for obtaining all road permits which may be required. 7. Other Permits: The Contractor shall be responsible for obtaining all permits required for construction. 8. Revisions: No verbal authorization for field revision shall be given. All requests for field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on the Drawings of Record. 9. Materials: Plastic Pipe —All gravity sanitary sewer piping shall be Polyvinyl Chloride (PVC) unless otherwise noted on the approved drawings. Pipe 15" and smaller shall conform to ASTM D3034, Type PSM, and SDR 35. Pipe 18" and larger shall conform to ASTM F679. All fittings shall be (PVC) unless otherwise noted. 10. Pipe Cover: A minimum cover of 3-1/2 feet of cover shall be maintained throughout the sewer line and service line installation. 11. Bedding: All sewer main installation shall include bedding. Bedding shall be W washed rock uniformly graded and compacted. Refer to force main design for force main bedding requirements. Trench shall be excavated to a depth below established grade equal to Y4 of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30" initial lift above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 12. Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall not be placed in lifts of greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway and residential areas and 90% in all off -site easement areas unless otherwise noted. Compaction testing of bedding and back fill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority or as required in project specific specifications. S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_lnterceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2 nd-review-com m e nts. d oc Enclosure 2 Sgn��9 To: File From: Engineering Date: 05 September 2008 3201 E. Mulberry Street, Unit Q P.O. Box 1518 Fort Collins, CO 80522 Ph: 970 498- 0604 Fax: 970 498-0701 Subject: Boxelder Sanitation District Construction Notes (to be included on the general notes sheet of any set of construction plans) The following information is condensed from the current "Standard Construction Specification for Sewer Mains" as adopted by the Boxelder Sanitation District (District) and is to be considered as such. In the event of any question the full document shall take precedence. Existing Utility Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In the event of damage to any existing utility, the contractor shall immediately notify the owner of the utility involved and unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. The cost of repairs shall be the responsibility of the Contractor. 2. Preconstruction Easement Pictures: Contractor to provide sequential digital pictures spaced at no more than 300 feet detailing conditions of the off -site easement conditions and any structures that could be affected, to the District and the property owner prior to the start of any off -site work. These pictures shall include all existing fence, ditches, structures, buildings, water troughs, trees and all landscaping. Pictures are to be placed at no more than four (4) pictures on a 11x8 sheet of photo paper inserted into transparent sleeves and delivered with the drawings of record in a three (3) ring binder. 3. Protection of Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. Contractor is solely responsible for working within the easements granted for the project. S:\DEVELOPMENT\Basins\West Basin\Cooper_Slough_lnterceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2 nd-review-com m ents. d oc Enclosure 1 Boxelder Sanitation District Easement Use Language for Platted Easements Where Sanitary Sewer Will be Installed - to be Included on all Plats 1. There shall be no erection or construction of any building or other structure, or any permanent obstruction, or decrease or substantial increase in ground level, from the finished elevations on this set of plans, in a manner that will interfere with use of the utility easement or impede access over and across the easement. 2. Landscaping in the area of the easement shall not create impediments to ingress and egress, nor shall landscaping material be installed or any trees or shrubs whose height is greater than 2-feet be planted in the easement area that may impinge on the overall operation and maintenance of the infrastructure placed in the easement. 3. No fence, which may impede access to and across the easement, shall be installed without prior approval from Boxelder Sanitation District. Any such fence, installed with the Boxelder Sanitation District's approval, must have gates to allow access to and across the easement of Boxelder Sanitation District's maintenance vehicles, and must be paid for by the developer or property owner. 4. Boxelder Sanitation District, which owns infrastructure installed in the utility easement, has the right from time to time to enlarge, improve, reconstruct, relocate and replace any underground utility lines, improvements or other appurtenances constructed hereunder with any other number or type of underground utilities and pipelines, or other structures either in the original location or at any alternate location or locations within said utility easement. 5. Boxelder Sanitation District shall have the right to mark the location of its infrastructure by suitable markers set in or on the ground; provided that permanent markers shall be placed in locations which will not interfere with any reasonable use of said utility easement. 6. Boxelder Sanitation District shall have the right to install and maintain a gravel access road within the utility easement for use by District personnel, equipment and vehicles. S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_lnterceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2 n d-review-comme nts. d oc 12+81 needs to be shown more clearly, identified as to be reconstructed, and need to see where access road will be in relation to this ditch to insure the access road and manholes will not interfere with the property owner's use of the ditch/piping. ■ Need to determine means of access road crossing ditch (culvert?) just north of STA 22+01. ■ Future storm sewer needs to be shown on drawing to ensure there is space for it and the sanitary sewer along the east side of the development. ■ Move manhole O7A south 40-feet to allow room for the installation of the future ditch crossing. 18 of 46 ■ Need temporary construction easements in place for future use at the ditch crossing. Also would like to discuss how future construction can occur with the stormwater ponds in place. ■ Show the stormwater ponds in the vicinity of manhole O7A so we can determine access road location, ensure manholes will not be in the pond embankments and ensure the manholes will not be submerged during runoff events. 43 of 46 ■ Add cleanout detail (emailed to engineer) ■ Add cut-off wall detail (emailed to engineer) ■ Use updated District review block (Enclosure 3, also emailed to design engineer). ■ Include sanitary sewer notes for plan and profile sheets on all plan and All Sheets profile dwgs (Enclosure 4, also emailed to engineer) ■ Temporary construction easements need to be shown on all plan and profile drawings. ■ Renumber all manholes as redlined on drawings. If there are questions, please contact me at 970-498-0604. Thank you. Sinc y, Randy Sidden , P.E. District Engineer Enclosures: 1. Boxelder Sanitation District Easement Use Language for Platted Easements Where Sanitary Sewer Will be Installed 2. Boxelder Sanitation District Construction Notes 3. Boxelder Sanitation District Review Block 4. Boxelder Sanitation District Sanitary Sewer Notes for Plan and Profile Sheets EC: Jade Miller, DMV Engineers Don Tiller S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_Interceptor_Subbasin\Liberty-Farms\Design Review\2008-9-4- 2 n d-review-com m ents. d oc s jq'?--� 05 September 2008 Ms. Shelby Sommer City of Ft. Collins, Planning and Zoning P.O. Box 580 Ft. Collins, Colorado 80522-0580 Re: Liberty Farms Final Utility Plan Review Comments Dear Shelby, Boxelder Sanitation District (District) has received plans for the above referenced project. District staff has completed its review of the submittal and has redlined the drawings. Below are comments on the redlines in the plans. Please note that not all redlines are listed below. Sheet # �— Comment ■ Notes regarding surface use of the easements in which the sanitary Plat, 1 of 2 sewer will be installed must be included on the plat. See Enclosure 1 (notes will be emailed to the design engineer). ■ Drainage easement on east side of the property needs to be designated Plat, 2 of 2 as utility and drainage easement (U&DE). ■ Add Boxelder notes. see Enclosure 2 (notes will also be emailed to 2 of 46 design engineer). _ ■ Need another sheet showing the interim offsite sewer to the south and its connection to the existing sanitary sewer. ■ Need a 12-ft wide gravel access road along the interim offsite sewer for 4 of 46 District service vehicle access. ■ Need to show future storm drain on the east side of the site to be sure it and the sanitary sewer have adequate space to be installed. _ �T Pond 12 and East Pond: Need to see where sanitary sewer is in relation to these two stormwater ponds. A gravel access road to the map.holes i will be needed and the manhole(s) cannot be located on the side slopes 16 of 46 of a pond nor can the manholes potentially be submerged during a storm j runoff event. 1 ■ Easement along east side of site: Is the easement wide enough for the sewer and future stormwater line? Or is it just intended for the sewer? Eliminate Manhole: See redlines on drawings. ■ Maximum spacing between manholes should be 400 feet, adjust 17 of 46 I MHs105 and 106, see redlines on dwg. ! Existing irrigation ditch/piping on Holter property from STA 22+01 to SADEVELOPMENT\Basins\West_Basin\Cpuper _Slough _Interceptor _Subbasin\Liberty-Farms\m Review\2008-9-4-2nd-review-comments.doc jHIO 3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 805 Phone (970) 498-0604 • Fax (970) 498-0701 • Email bsd@verinet.com @ M 01 M SEP 0 8 2008 D Number: 160 Created: 2/22/2008 [2/22/08] Why are there no street trees along the western side of Lot 6? If this is an issue related to the roundabout, let's discuss other solutions. Acknowledged Number: 161 Created: 2/22/2008 [2/22/08] General Note #6 on landscape plan says that final landscape plan shall include the total area (in some square feet) for each landscape category. Please add to plan. Acknowledged Number: 162 Created: 2/22/2008 [2/22/08] Trash enclosures need to be designed for walk-in service so that the main gates do not need to be opened. This may be dimensioned on the enclosure detail, but it is not clearly labeled. Also, please label swing gate material and color. Acknowledged Number:185 Creat /29/2 [2/29/08] Forestry (Tim Buchanan): These note ould be added to the dscape plan: "The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than 8 inches and soil amendment shall be thoroughly incorporated intojhe soil of all landscape areas to a depth of at least 6 inches by tilling, disking or other suitable method, at a rate of at least 3 cubic yards of soil amendment per 1,000 square feet of landscape area. A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. The developer shall contact the City forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development." Complete Page 2 Comments on Liberty Farms 9-3-08 Tim Buchanan Landscape notes need to be added to the plan. Change PYUS Ussurian Pear used as a street tree to Chanticleer Pear. English Oak QURO be changed to Skymaster English Oak Quercus robur `Skymaster' !%! FINAL PLAN Cityof_ and Planning REVISION COMMENT Zoning PO Box 580 Fort Collins. CO 80522-0580 SHEET Fax: 970-416-2020 DATE: August 21, 2008 TO: Forestry PROJECT PLANNER: Shelby Sommer # 31-06B LIBERTY FARMS PDP 2nd Round of Review Please return all comments to the project planner no later than the staff review meeting: September 3, 2008 Note - Please identify your redlines for future reference ❑ No Problems Problems or Concerns (see below, attached, or DMS) S'.e ,e k44ae._ L4Q q Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ _Plat _Site _DrainsS rt _Other / _Utility _Redline Utility ClLadscape City of Fort Colli 27. Check stationing/ location of fitting at site entrance. Done 28. Show in the profile the water crossing at the ditch crossing. See redlines. Ditch crossing has been added 29. Tie water line into existing water on west side of street after ditch crossing. Use 8" tee and cap line continuing north. 30. Add steel casing detail provided in redlines. Also include Buried Casing Detail to detail sheet.. Detail has been added Sheet 19 31. Verify service line locations in profile and label them as service lines. Locations have been checked 32. Install Blue Board insulation to service line crossing —4+60 on storm line 5.. Note has been added 33. Add isolated water main detail to detail sheet. Done Sheet 20 34. Verify service line locations in profile and label them as service lines.. Locations have been checked Sheet 31 35. Remove large meter vault detail (top and side view). Replace with Large water service detail- 1 %2" through 2". Done 36. Add buried casing detail. Done Please return redlines with submittal. F:\Drawings\LIB\DOCS\Comment reponce for ELCO Water.wpd 12. Tie valve to fitting at round -about. Acknowledged 13. Leaders need to be checked for where they are pointing.. Acknowledged 14. Add valve to end of water line (before plug) South end of Collamer Rd.. Valve has been added 15. Move water service for bldg 5 to come off of (new) 8" water line that goes on front of the building. See redlines. Service has been moved Sheet 15 16. Change 12" proposed water to 8" (typ). Done 17. Connect water to existing water north of ditch/ canal.. Acknowledged Sheet 16 18. Move water service line for bld 5 as noted in comment 15. Service has been moved 19. Verify service line locations in profile and label them as service lines.. Done Sheet 17 20. Verify service line locations in profile and label them as service lines.. Done 21. Check profile vs plan view stationing. They do not match.. Checked and fixed Sheet 18 22. Change Vine/ Timberline water connections per redlines.. Done 23. Change all references to a proposed 12" water line to 8". References have been changed. 24. Change butterfly vales to gate valves. Valves have been changed. 25. Replace 2" line with proposed 8". Done 26. Change reference of DIP to C900 References have been changed. Comments from ELCO Water Sheet 2 l . Under general notes, note 5. Please change the note to state that the water needs to be to ELCO Water standards. Note has been changed 2. Under general notes, note 39. Please add ELCO to the end of the note. Note has been changed 3. Under Water notes, note 4. Please change the city contact information to ELCO information. Information has been changed 4. Under Water notes please add a note 6 stating " Prior to construction a ditch crossing easement agreement shall be recorded with Larimer County and on file at ELCO offices." Note has been added 5. Under Water notes please add a note 7 stating "16" water pipe shall be ductile iron. All other pipe shall be C900, PVC." Note has been added Sheet 4 6. Change all references to proposed 12" water line to 8" water line. References have been changed 7. Add valves to all fire service lines. Valves have been added 8. Move building 2's water and fire service to attach to and to the tee of the fire hydrant. See redlines. Fire line and service has been moves 9. Chance all reference of proposed DIP to PVC. References have been changed 10. Move Meter and stop to south of storm. Insulate Service line. Meter has been moved. Note has been added. II. Change water line that goes through lots 5-7 from a 6" to a 8" line. Water line has been changed to 8" 1W NW FINAL PLAN °`- REVISION COMMENT Planning and Zoning PO Box;so SHEET Fort Collins. CO 30522-0580 Fur: 970-416-2020 DATE: August 21, 2008 TO: ELCO PROJECT PLANNER: Shelby Sommer # 31-06/13 LIBERTY FARMS PDP 2nd Round of Review Please return all comments to the project planner no later than the staff review meeting: September 3, 2008 Note - Please identify your redlines for future reference No Problems ® Problems or Concerns (see below, attached, or DMS) 0 -NARWIN WILLS Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 08-29-2008 rx� 9 pumping system will be required. The outfall for a pumping system would probably have to be the irrigation canal, which would require there approval. Number: 218 Created: 9/5/2008 [9/5/08] The 36-inch storm sewer that is located behind the sidewalk will be a public storm sewer maintained by the City. Since this storm sewer is located on private property, the City will not be responsible for replacing and landscaping due to any maintenance or replacement activities. The City is only responsible for the maintenance of the pipe and bring the ground surface back to grade as shown on the plans. Also, a 20-foot drainage easement is required with the pipe centered within the easement. Number: 219 Created: 9/5/2008 [9/5/08] The retention pond slopes need to be 4:1, not 3:1. The City has had problems with 3:1 slopes and a variance for this requirement is highly unlikely. Number: 220 Created: 9/5/2008 [9/5/08] Please add a note on the storm sewer profiles that all storm sewers are to be inspected by the City. Number: 221 Created: 9/5/2008 [9/5/08] The detention pond outlet pipe for the ultimate condition needs to be plugged in the interim. This will allow only one pond bottom seeing water, which will be better for maintenance. The spillway will need to carry the 100-year flow if the second retention pond was ever needed. Number: 222 Created: 9/5/2008 [9/5/08] An off -site drainage easement is required for the second retention pond before signing of mylars. Number: 223 Created: 9/5/2008 [9/5/08] The location of the off -site storm sewer is shown to be located on neighboring property. Please remove the pipe on the plans, due to the City not wanting any predetermined location for this storm sewer. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Shelby Sommer City Planner Page 5 [9/3/08] A development agreement information sheet must be submitted before I can begin drafting the DA. Topic: Technical services Number: 211 Created: 9/3/2008 [9/3/08] No problems. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 87 Created: 10/29/2007 [8/22/08] [10/29/07] No comments for the second round of review. Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque Topic: Stormwater Number: 213 Created: 9/5/2008 [9/5/08] The retention ponds are significantly lower than the Larimer-Weld ditch bottom and ground water may be a problem with these ponds. Please submit data showing what the ground water elevation is during the irrigation season. Number: 214 Created: 9/5/2008 [9/5/08] The City has concerns with the slope off the irrigation ditch which will be over 12 feet high from the top of the ditch to the bottom of the pond. This is basically creating a levee. More engineering thought into the feasibility of this design needs to take place. Is this slope stable? Will seepage occur? Benching the slope, cut-off wall, subdrains may be some options to help mitigate concerns. Please label the dimensions of the slope including the top width. The Ditch Company would have to approve this design due to the slope compromising the structural integrity of the canal. The City would also need indemnification. Number: 215 Created: 9/5/2008 [9/5/08] The City does not allow buried rip -rap anymore on side slopes. Rip -rap can be used only at pipe outlets where the slope is relatively flat. The City suggests having the storm sewers that enter the detention pond outlet at the toe -of -slope. Concrete rundowns or grouted rip -rap is another option, although these may be more expensive and not as attractive. Number: 216 Created: 9/5/2008 [9/5/08] The north swale that has a slope of 1 % needs to be 2% or the swale needs to include a pan or an underdrain system. If this creates a problem with slopes next to the can, an alternative or a variance may be granted. Number: 217 Created: 9/5/2008 [9/5/08] The retention ponds need to drain within 72 hours according to state law. Unless a percolation test shows these ponds will infiltrate within this time frame, a Page 4 forthcoming. The CDOT detail might be acceptable for Cherryhurst. Please check with Rick. Insert the CDOT detail into the plan set if you will be using this. Number: 202 Created: 9/3/2008 [9/3/08] Provide a typical detail for the bike access ramps at the R.A. I will check with the City Engineer regarding angle of approach etc. and get back with you. Number: 203 Created: 9/3/2008 [9/3/08] Some of the HC ramps on the plans do not appear to match the LCUASS 1606 standard. Please revise the ramps on the plan and call them out with the 1606 detail just for clarification. Number: 204 Created: 9/3/2008 [9/3/08] There are still a number of line over text conflicts in the plan set. I have circled some of them in the redlines. Please go through the plans one more time and try to fix as many as possible before going to mylar. Number: 205 Created: 9/3/2008 [9/3/08] Submit one deed of dedication and stamped legal & exhibit for the drainage easement needed for the off -site pond. The review fee is $250. Number: 206 Created: 9/3/2008 [9/3/08] Ultimate Timberline Design - Please show all 3 profiles for Timberline independently for the entire frontage of the property. Off -site preliminary design must also show all 3 profiles but you can show the off -site preim. portion as you have with this submittal if you like. We detailed info in the profiles for the medians. Show medians with respect to the crown of the road. Number: 207 Created: 9/3/2008 [9/3/08] Road cross sections are not shown consistently. See sheet 26 and 27 of the redlines. Number: 208 Created: 9/3/2008 [9/3/08] Vertical curve standards are not being met on Collamer north of the R.A. 50 mph design speed, 2-lane arterial, 4 percent grade change. I will check with Sheri to determine if a variance is appropriate for this stretch of roadway over the box culvert. Off -site prelim. Design should be adjusted to meet standards regardless. Number: 209 Created: 9/3/2008 [9/3/08] 1 still need resolution on the clearance between the road design for Collamer and the box culvert. Can the full road section be built as shown and maintain adequate clearance to satisfy the box culvert owner ? Number: 210 Created: 9/3/2008 Page 3 1. Sheet 25 shows a 64' wide interim street cross section on Timberline whereas the plans on previous sheets show a 54' wide cross section. Sheet 33 1. For the westbound left turn lane on Cherryhurst: delete the diagonal taper line and the dotted line across the taper area. Extend the double yellow (on the southernmost yellow line dividing the westbound left turn lane from the eastbound through lane) from the intersection to where the taper area starts (approximately sta 12+94). Number: 212 Created: 9/4/2008 [9/4/08] Tim Buchanan (Forestry): 1. Please change PYUS Ussurian Pear used as a street tree to Chanticleer Pear 2. English Oak QURO be changed to Skymaster english Oak Quercus robur "Skymaster" Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 197 Created: 9/3/2008 [9/3/08] Please add a new note to the Plat regarding resource conserving equipment. I have attached the note to the redlines. Number: 198 Created: 9/3/2008 [9/3/08] The Plat shows a 20 foot drainage easement along the east side of the property. This should be a U.E. for the sewer. The 10 foot off -site portion of this sewer easement will be dedicated to the District so please label it this way on the sewer design plans and make sure all of the dimensioning is consistent and matches the Plat. All easements to utility districts will need to be recorded prior to final plan approval and reception numbers referenced on the plan. Only the drainage easement for the pond will be dedicated to the City. Submit deeds of dedication and stamped legal with exhibit + a $250 review fee. Number: 199 Created: 9/3/2008 [9/3/08] Please use SHARKS TEETH striping at the R.A. approaches at the yield line. Revise the detail accordingly. See LCUASS Figure 8-15 and sheet 7 of the redlines. Number: 200 Created: 9/3/2008 [9/3/08] Please provide details for the 6 foot pan and center island mountable curb proposed for the R.A. See sheet 9 of the redlines for clarification. Number: 201 Created: 9/3/2008 [9/3/08] Rick Richter in the Pavement Management Department will be reviewing the concrete jointing pattern for the R.A. and the Cherryhurst street section (no jointing pattern provided for Cherryhurst?). Comments from Rick will be Page 2 r: City of Fort Collins STAFF PROJECT REVIEW DON TILLER 2121 Midpoint Dr., Suite 302 FT COLLINS, CO 80525 Date: 09/04/2008 Staff has reviewed your submittal for LIBERTY FARMS PDP - TYPE II AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Shelby Sommer Topic: General Number: 195 Created: 8/28/2008 [8/28/08] Great job addressing my last round of comments ... I'm ready for mylars! Number: 196 Created: 9/3/2008 [9/3/08] Joe Olson (Traffic Operations): Sheet 9 1. Remove the "YIELD" pavement marking word symbols shown on each approach to the roundabout. Sheet 23 and 24 1. The interim cross section for Timberline Road includes a 12' wide northbound bike lane. It is likely that this will end up being used as a defacto right turn lane by motorists. A more effective cross section would include a 12.5' northbound right turn lane (measured from the flow line), a 5' bike lane, an 11' northbound through lane, an 11' southbound left turn lane (shadowed by an 11' painted median on the south side of the intersection), an 11' southbound through lane and a 5' southbound bike lane/shoulder. A short northbound right turn bay taper should be included as part of this cross section and the bike lane should be dotted (2' line + 2' space) across the taper area. 2. Marking should be as per the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). The MUTCD no longer includes diamond pavement markings for bike lanes. Those should be removed from the plans. 3. The hatching pattern should be removed from the painted medians. 4. Remove the dotted line across the southbound left turn bay entering taper. 5. Remove the crosswalk and STOP bar shown across Cherryhurst. Sheet 25 Page 1