HomeMy WebLinkAboutCOLLINWOOD NORTH, MAJOR AMEND. - 24-07 - CORRESPONDENCE -Steve Olt - Re: Collinwood North Page 1
From: Steve Olt
To: Erika Keeton; Marc Virata
Date: 4/23/2008 5:06:02 PM
Subject: Re: Collinwood North
Marc and Erika,
The whereabouts of the Collinwood North, Major Amendment is that I have the file in my office. The
Planning & Zoning Board approved the Major Amendment on September 20, 2007, and I have seen
nothing since. Technically there is no Final Plan submittal, review, and approval (from a Planning
standpoint) for Major Amendments and, therefore, this item would be subject to the requirements set forth
in Section 2.2.11(D)(3) Term of Vested Right in the Land Use Code. This section states:
Within a maximum of 3 years following the approval of a final plan or other site specific development
plan, the applicant must undertake, install and complete all engineering improvements (water, sewer,
streets, curb, gutter, street lights, fire hydrants and storm drainage) in accordance with city codes, rules
and regulations. The period of time shall constitute the "term of the vested property right". The foregoing
term of the vested property right shall not exceed 3 years unless: (a) an extension is granted pursuant to
paragraph (4) of this subsection.
Based on this requirement, the Collinwood North, Major Amendment plans will expire on September 20,
2010 unless:
1) An extension granted pursuant to Section 2.2.11(D)(4) of the Land Use Code; or
2) A set of Final Plans is submitted to the City, reviewed and approved prior to September 20, 2010. At
that time the applicant would have 3 years to satisfy the requirements to establish a "vested right" for the
development plan, per Section 2.2.11(D)(3) of the Land Use Code.
Steve
>>> Marc Virata 4/23/2008 3:31 PM >>>
Erika,
I'm recalling that the project did get an approval at the Planning and Zoning Board several months ago,
probably last fall. I have not seen it resubmitted since, so I don't know if the project is on hold, or still
viable. They do have at least a couple of years left to obtain final approval. I've copied Steve Olt to see if
he might have any insight on the whereabouts of the project.
Thanks,
Marc
>>> Erika Keeton 4/23/2008 1:14 PM >>>
Marc, we're getting ready to do street maintenance on Lemay, and I'm wondering if there is any progress
we should know about on the development at Rule? We'll be doing concrete and paving on Lemay.