Additional courtesy copy list
cc: P.A. Investments, LLP
Don Ennis; Ennis and Associates
Matt Delich; Delich Associates
Roger Buffington; City of Fort Collins Water / Wastewater
Basil Hamdan; City of Fort Collins Stormwater Utility
John Moen; Larimer County Canal No. 2 Irrigating Company
Gene E. Fischer; Fischer & Fischer, LLP
Attachments
R letter from Fischer and Fischer, LLP dated December 27, 2007
R Intermill final plat closure summary
Page 24
Z:\Clients\W-Clients,-willco Development\l592-07-07 Lot 1 Goodwili .ndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 10 Created: 12 / 13/ 2007
[12/ 13/07] A color key was provided on the elevations, but the shading
looks pretty much the same for most of the colors on the key as well as the
elevation drawings themselves. Please note the colors on the elevations with
the corresponding color code.
R The color key has been added to the building elevations.
Number: 11 Created: 12/ 13/2007
[12/ 13/07] Please remove topography lines from the Landscape Plan.
R Contour lines have been removed from the Landscape Plan.
After discussion at staff review on December 19th it was determined that
the plans with this development proposal are in a condition to be able
to be scheduled for a Planning & Zoning Board public hearing.
Therefore, the item has been placed on the January 17, 2008 P&Z
Board agenda. However, several departments need to see some revised
plans prior to the hearing. Please contact City staff directly for information
on what they need and by when to enable the item to stay on the agenda
(see comment #81, page 4, of this comment letter). Be sure and return all
red -lined plans when you re -submit documentation.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Marc Virata, City Engineering
Dana Leavitt, City Environmental Planner
Spirit Hospitality LLC
Shear Engineering Corp.
The Frederickson Group LLC
Intermill Land surveying, Inc.
Planning & Zoning file #37-07
Page 23
Z:\Clients\W-Clients; willco Development\1592-07-07 Lot 1 Goodwill industries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 68 Created: 12/ 19/2007
[12/ 19/07] See red -lined plans for other comments.
R Redline comments have been addressed. Redlined plans are being returned with
this resubmittal.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 3 Created: 12/ 13/2007
[12/ 13/07] Please remove the landscaping and grade lines from the Site
Plan. A separate Landscape Plan should be provided.
R Landscaping and contours have been removed from the Site Plan. A separate
Landscape Plan has been provided.
Number: 4 Created: 12/ 13/2007
X12/ 13/07] There needs to be at least one Van Accessible handicap space
_which needs to be an overall width of 16 feet and signed as "Van
Accessible". Please note it on the Site Plan.
R The van space is shown on the site plan and dimensioned.
Number: 5 Created: 12 / 13 / 2007
[12/ 13/07] I don't see any bicycle parking noted for Buildings 1, 2 or 4.
Please note bicycle parking and locate close to main entrances of buildings.
R Building 1 & 2 share a bicycle parking space. A parking space has been added for
the hotel.
Number: 6 Created: 12/ 13/2007
[12/ 13/07] There are no ramps shown next to the handicap parking spaces
- please show ramps on the Site Plan.
R Corrected.
Number: 7 Created: 12/ 13/2007
[12/ 13/07] Please show buildingenvelopes, footprints and setbacks on the
Site Plan. `�• , v�
R Corrected.
Number: 8 Created: 12/ 13/2007
[12/ 13/07] Please show ramps at crosswalks.
R Corrected.
Number: 9 Created: 12/ 13/2007
[12/13/071 The height of building 4 - the hotel - is not noted on the
Building Data table. Please add that.
R Corrected.
Page 22
Z:\Clients\W-Clients �villco Development\1592-07-07 Lot l Goodwih industries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
All storm sewers construction shall have water tight joints in compliance
with ASTM C-443 standards.
R Acknowledged. We have added Supplemental Note 13 on the Cover Sheet of the
Final Utility Plans that reads as follows:
13. All storm sewer pipes shall be Class III reinforced concrete pipe (RCP) with R4
joints meeting the requirements of ASTM Standard Specification C443, latest
version.
Please provide a detail for the proposed water quality plate showing number
of holes, size, elevations, etc... and for the grate (openings, type of materials,
etc... )
R Water Quality Plate is now fully detailed.
Please provide a construction level detail of the pond outlet structure. The
provided detail lacks reinforcement information and dimensions.
R City of Fort Collins Stormwater Utility standard detail D-46 was included on the
detail sheet with the original submittal. That detail represents the specific
reinforcing for the outlet structure. We removed the other outlet structure detail
and maintained Standard detail D-46.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 64 Created: 12 / 19 / 2007
[12/ 19/07] Sheet 2 refers to DIP for water main and Sheet 3 indicates PVC.
If the intent is to use PVC, include Standard Details 25 and 30 on the detail
sheets.
R Our intention is to use PVC. Standard Details 25 and 30 have been added to the
detail sheet for water and sewer.
Number: 65 Created: 12/ 19/2007
[12/19/07] Revise fire hydrant, fire line and water service layouts as noted
on the red -lined Utility Plans.
R Revisions have been completed.
Number: 66 Created: 12/ 19/2007
[12/ 19/07] Extend sanitary sewer west of drive entrance as shown to get
service more perpendicular to main and get service out from beneath thrust
block on 45-degree bend.
R Revisions have been completed.
Number: 67 Created: 12/ 19/2007
[ 12 / 19 / 07] Add water main lowerings table with detailed information with
lengths, elevations, etc.
R Acknowledged. Details 4-A and 4-13 have been added to the plans.
Page 21
Z:\Clients\W-Clients\vvillcoDevelopment\1592-07-07 Lot 1 Goodwili industries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Topic: Site and Landscape Plans
Number: 70 Created: 12 / 20/ 2007
(12/20/07] Please clearly label proposed retaining walls on both the Site
and Landscape Plans. It would help if storm lines shown on the Landscape
Plan are faded back and please make sure that the lines are consistent
between Site and Landscape Plans, and Utility Plans.
R Retaining walls have been clearly labeled on both the Site and the Landscape
plans. The utilities have been toned back on the Landscape Plan. All utilities are
now consistent between all plans.
Topic: Storm line
Number: 20 Created: 12/ 18/2007
[12/ 18/07] The plans call for a 3'x6' box culvert to provide needed
detention. It is suggested that the 0.05 Acre-feet of detention be provided by
seeking a variance to the ponding depth in the parking lot if possible. This
variance would be approved as long as ponding does not exceed 18 inches
at any point. If not please consider the use of underground detention
systems in the parking area that will have better access for maintenance
purposes.
R Thank you for the parking lot depth allowance. We were able to provide the
volumes required and have eliminated the box culvert. We have added a variance
request section to the Drainage Report and we have noted this variance request on
Sheet 2 of the Final Utility Plans (Larimer County Urban Area Street Standards
Notes).
Topic: Utility Plans
Number: 22 Created: 12/ 18/2007
[12/ 18/07] Please call out the type and size of all existing and proposed
storm drainage facilities on the master Utility Plan (Sheet 3).
Please show 100 year HGL on all storm profiles.
R Acknowledged.
Please add notes specifying that:
Maintenance of storm sewers outside the right of way shall be the
responsibility of the owner.
R Acknowledged. Supplemental Note 7 on the Cover Sheet of the Final Utility Plans
reads as follows:
7. The City of Fort Collins shall not be responsible for the maintenance of storm
drainage facilities located on private property. The Association will be
responsible for the maintenance of all onsile and offsite drainage facilities
associated with this project that are outside the public right of way. This
includes all tracts and private drives.
Page 20
Z:\Clients\W-Clients,vJillco Development\1592-07-07 Lot 1 Goodwin industries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Topic: Grading
Number: 19 Created: 12/ 18/2007
[12/ 18/07] Please provide a tier stepped wall on the north and west side of
the detention pond. This will help for maintenance access and for visual
esthetics. Clearly designate pond overflow elevation and compare to
proposed building minimum opening elevations.
R A maintenance access has been added. Due to volume requirements, a tiered
stepped wall has not been provided for the entire perimeter. Please note that the
Goodwill detention pond retaining wall was not tiered and maintenance access
was not provided.
The retaining wall shown along the north property line is right on the
property line. A construction easement may be needed from the Parkway
Townhomes HOA to build this wall.
Please clarify the grading at the west end of the south entrance, what
elevation will the storm line be at? If possible provide an inlet at that
location rather then just a flared end section.
R The retaining wall along the north boundary has been removed. Therefore a
construction easement is not being provided. A fence will be installed along the
north boundary at the request of the Parkway Townhomes P.U.D. home owners.
Please refer to Revised Site Plan and fence details provided.
Topic: Hearing items
Number: 71 Created: 12 / 20 / 2007
[12/20/07] Items needed prior to hearing (by January 3, 2008):
* Letter of intent from the ditch company for approval of grading along
ditch right of way.
R Plans were provided to Fischer and Fischer, LLP on December 20, 2007. Fischer
and Fischer, LLP represents the Larimer County Canal No. 2 Irrigating
Company. Attached is a letter from Fischer and Fischer, LLP dated December 27,
2007. The letter generally indicates that there are no issues of concern.
* Letter of intent from the Parkway Townhomes HOA for construction of
north retaining wall.
R There will not be a retaining wall along the north boundary. Therefore, no letter
of intent is provided on this matter.
* Revised pond grading providing maintenance access and softening the
overall look of the pond with some landscaping.
R A maintenance access has been added. Due to volume requirements, a tiered
stepped wall has not been provided for the entire perimeter. Please note that the
Goodwill detention pond retaining wall was not tiered and maintenance access
was not provided. Landscaping has been added. Refer to revised Landscape Plan.
Page 19
Z:\Clients\W-Clients,.Jillco Development\1592-07-07 Lot l Goodwii, .ndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Department: Transportation Planning Issue Contact: Denise Weston
Topic: Transportation Planning
Number: 73 Created: 12 / 21 / 2007
[12/21/071 Note sidewalk widths on Site Plan. Please consider a smoother
transition between existing sidewalk and new sidewalk in the southwest
section of the development.
R Acknowledged.
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Ditch company approval
Number: 69 Created: 12 / 20/ 2007
[12/20/071 A letter of intent agreeing in principle to the proposed
improvements is required from the ditch company prior to hearing. At fmal
full ditch company approval will be required.
R Plans were provided to Fischer and Fischer, LLP on December 20, 2007. Fischer
and Fischer, LLP represents the Larimer County Canal No. 2 Irrigating
Company. Attached is a letter from Fischer and Fischer, LLP dated December 27,
2007. The letter generally indicates that there are no issues of concern.
R There is an approval block for the Larimer County Canal No. 2 Irrigating
Company on the Cover Sheet of the Final Utility Plans. There is also a signature
block for the Larimer County Canal No. 2 Irrigating Company on the Final Plat.
Topic: Drainage Plan
Number: 21 Created: 12/ 18/2007
[12/ 18/07] Please provide a pond summary table.
R A pond summary table is now provided on the Master Drainage Plan.
Topic: Erosion Control Plan
Number: 72 Created: 12 / 20 / 2007
[12/20/07] Please provide a silt fence along ditch to help protect ditch from
sediments during construction activities.
R Silt fence has been added to the west boundary. The actual ditch sits higher than
the development. Therefore, no additional erosion protection will be provided
along the west boundary. The erosion control estimate has been adjusted
accordingly.
Page 18
Z:\Clients\W-Clientsxvvil1co Development\1592-07-07 Lot 1 Goodwil,.ndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
These requirements may be modified if buildings are equipped with
automatic fire sprinkler systems.
97UFC 901.2.2.2
R Acknowledged.
Number: 14 Created: 12 / 18/ 2007
[12/ 18/07] FIRE LINE REQUIREMENT: Buildings that are required to be
fire sprinklered shall have a minimum 6-inch fire line unless hydraulic
calculations can support a smaller fire line. NOTE: The fire lane shown
servicing Lot 3 is not labeled on the Master Utility Plan, Sheet 3.
R Acknowledged.
Number: 15 Created: 12/ 18/2007
[12/18/07] BUILDING AREA: The proposed building exceeds 5,000 square
feet for type V construction and shall be fire contained or fire sprinklered.
(H4 > 3,000 SF = AS) 97UBC Table9-B (City of Fort Collins Amendment)
R Acknowledged.
Number: 16 Created: 12/ 18/2007
[12/ 18/07] KNOX BOX REQUIRED: Poudre Fire Authority requires a °Knox
Box" to be mounted on the front of every new building equipped with a
required fire sprinkler system or fire alarm system. 97UFC 902.4; PFA
BUREAU POLICY 88-20
R Acknowledged.
Number: 17 Created: 12/ 18/2007
[12/18/07] ADDRESS NUMERALS: (NOTE: The lots shall be addressed off
Pavilion Place.) Address numerals shall be visible from the street fronting
the property, and posted with a minimum of 6 inch numerals on a
contrasting background. (Bronze numerals on brown brick are not
acceptable) . 97UFC901.4.4
R Acknowledged.
Number: 18 Created: 12/ 18/2007
[12/18/07] FIRE LANE SIGNS: Please contact me regarding a fire -lane sign
template, because one of the signs shown on the plans is no longer what we
are using.
R Carrie Dann has been contacted. We will be happy to revise plans once we have
received the information.
Page 17
Z:\Clients\W-Clients\.y illco Development\1592-07-07 Lot 1 Goodwili ,ndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Topic:. Utilities
Number: 1 Created: 12/6/2007
[12/6/07] The developer will need to coordinate the power requirements for
each building, locations for electric transformers, and the electric
development charges with Light & Power Engineering (221-6700). The
available locations for electric transformers appear to be quite limited, so
prompt contact with Light & Power is encouraged.
R Acknowledged.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 12 Created: 12/ 18/2007
[12/18/07] REQUIRED ACCESS: We prefer not to have a blanket
Emergency Access Easement (EAE). We can discuss the EAE over Tract A of
the plat, but we normally prefer to designate only the drive aisles as an
EAE. A fire lane shall be visible by painting and signage, and maintained
unobstructed at all times. A fire lane plan shall be submitted for approval
prior to installation. In addition to the design criteria already contained in
relevant standards and policies, any new fire lane must meet the following
general requirements:
❑ Be designed as a flat, hard, all-weather driving surface (asphalt or
concrete) capable of supporting fire apparatus weights. Compacted road
base shall be used only for temporary fire lanes or at construction sites.
❑ Have appropriate maintenance agreements that are legally binding and
enforceable.
❑ Be designated on the plat as an Emergency Access Easement.
❑ Maintain the required minimum width of 20 feet throughout the length
of the fire lane.
97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1
R Acknowledged.
Number: 13 Created: 12/ 18/2007
[12/18/07] WATER SUPPLY: (NOTE: Location for the two new hydrants
looks excellent.)
Fire hydrants, where required, must be the type approved by the water
district having jurisdiction and the Fire Department. Hydrant spacing and
water flow must meet minimum requirements based on type of occupancy.
Minimum flow and spacing requirements include: Commercial, 1,500 gpm
at 20 psi residual pressure, spaced not further than 300 feet to the building,
on 600-foot centers thereafter; residential within Urban Growth Area, 1,000
gpm at 20 psi residual pressure, spaced not further than 400 feet to the
building, on 800-foot centers thereafter; residential outside Urban Growth
Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet
to the building, on 800-foot centers thereafter.
Page 16
Z:\ClientsM-Clients,.villco Development\1592-07-07 Lot 1 GoodwiL Li�dustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 50 Created: 12/ 18/2007
[12/18/07] Larimer County Canal No.2 Ditch Company appears to need to
be a signatory to the plat with existing easements apparently onsite.
R A signature block for the Larimer County Canal No. 2 Irrigating Company has
been added to the Final Plat.
Number: 51 Created: 12/ 18/2007
[12/ 18/07] Technical Services has the following comments:
1. Boundary doesn't close.
2. Title and subdivision name in statement of ownership do not match.
3. PDP is a process and should not be in the name of the plat.
4. Who owns and maintains Tract A?
5. Text over line/scanning issues. See red -lines.
R 1. The boundary of this plat follows the record boundary for Lot 1 as shown on
the plat of Goodwill Industries Of Denver. It appears that the curve (as platted)
along J.F.K. Parkway is non -tangent. Radial bearing added to plat to help clarify.
The boundary shown does close (see enclosed closure report provided by Intermill
Land Surveying, Inc.).
R 2. Plat title & subdivision name revised.
R 3. Plat name revised.
R 4. Tract A note modified to indicate ownership & maintenance responsibilities.
R 5. Plat revised for clarity (red line plans provided to Intermill Land Surveying,
Inc. did not identify any text over lines, a few instances did exist & have been
corrected).
Department: Light & Power Issue Contact: Doug Martine
Topic: Landscape plan
Number: 2 Created: 12 / 6/ 2007
[12/6/07] There is an existing streetlight on Pavilion Lane., near building
#3, and another on JFK Pkwy., at Pavilion Lane. The developer needs to
survey the location of these lights, show them on the Landscape Plan. Street
tree locations then need to be adjusted to provide a minimum of 40 ft.
clearance between the lights and the trees (15 ft. if the tree is an ornamental
type).
R Existing street lights are now noted on the Site Plan, the Landscape Plan and the
Final Utility Plans. Existing street lights were originally identified on the Alta
Survey provided by Nolte Associates. The Landscape Plan has been revised to
maintain a minimum of forty feet (40') between the existing street lights and
proposed street trees.
Page 15
Z:\Clients\W-Clients\,, dlco Development\1592-07-07 Lot 1 Goodwill ..,dustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 76 Created: 12 / 21 / 2007
[12/21/07] In checking with Engineering Inspection on two issues brought
up at staff review regarding the construction of the extension of Pavilion
Lane, the following was noted:
- On the driveway not being constructed for the ditch company access,
this is being looked at further to recount past history between the inspector
and the contractor. There is reason to believe that the ditch company was
consulted and had no objection to the lack of a driveway, though if this is
not the case, the inspector will have the contractor for Goodwill perform this
work.
R Acknowledged.
- On the termination of the access ramp, the design and construction
was agreed to by the inspector and the contractor, not knowing whether the
extension of the sidewalk would take place at any point. The development
should reconstruct the access ramp as needed to continue it to the east.
R Acknowledged.
Topic: Plat
Number: 48 Created: 12/ 18/2007
[12/18/071 The existing 20' slope easement proposed to be vacated with
this plat is of potential concern at the ditch crossing. Not knowing the
grading in this area I'd prefer that this portion of the slope easement remain
(and doesn't appear to adversely affect the development) around the culvert
structure.
R Acknowledged. This portion of the slope easement will remain. The plat has been
revised to remove reference to vacating this easement.
Number: 49 Created: 12 / 18/ 2007
[12/ 18/07] Tract A is indicated as being dedicated as various easements for
the benefit of Lots 1 through 4. If this is intended then to not be dedicated
to the City, then the Certificate of Dedication language should specifically
state the exemption of Tract A as being dedicated to the City to avoid
confusion. This would be of concern though as the emergency access,
drainage, and utility easement uses should be dedicated to the City for the
public use and not solely to Lots 1 through 4. Overall, I'd prefer that Tract
A note be amended to read similar to as follows: "With this Plat Tract A is
hereby dedicated to the City as an emergency access, drainage and utility
easement and also hereby dedicates a shared access easement for the
benefit of Lots 1 through 4. Maintenance and ownership of Tract A shall be
the responsibility of Lots 1 through 4."
R Acknowledged. Revised note has been added to plat.
Page 14
Z:\Clients\W-Clients\.. illco Development\1592-07-07 Lot 1 Goodwill „idustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 40 Created: 12/ 18/2007
[12/18/07] The handicap parking stall itself shown on the site plan does
not appear to be sufficient in width (12' instead of 13), while the
construction plan drawings show this parking stall to be a standard stall at
Win width. The horizontal control information does not appear to match.
R Acknowledged. All plans have been revised.
Number: 41 Created: 12/ 18/2007
[12/18/07] In general, the on -site design information appears slightly
different between the civil and planning documents. Internal curbing
around parking stalls, sidewalk widths, and parking stall widths differ
between the documents. Please coordinate.
R Acknowledged. All plans have been coordinated.
Number: 42 Created: 12/ 18/2007
[12/ 18/07] A letter of intent from the Larimer Canal No. 2 Ditch Company
appears to be needed prior to a hearing for the project.
R Plans were provided to Fischer and Fischer, LLP on December 20, 2007. Fischer
and Fischer, LLP represents the Larimer County Canal No. 2 Irrigating
Company. Attached is a letter from Fischer and Fischer, LLP dated December 27,
2007. The letter generally indicates that there are no issues of concern.
Number: 43 Created: 12/ 18/2007
[12/18/07] The Site Plan appears to show excess (and at times conflicting)
information with other documents. The grading contours can be removed
and the landscape information can be removed, which conflicts with the
landscape information shown on the Landscape Plan.
R Acknowledged.
Number: 75 Created: 12 / 20 / 2007
[12/20/07] The comments from Engineering that should be resolved before
a hearing on the project are the following: 37, 38, 39, 40, 41, 42, 48, 49, 50
& 74.
R Acknowledged.
Page 13
Z:\C1ients\W-Clients\"1llco Development\1592-07-07 Lot I Goodwill idustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 47 Created: 12/ 18/2007
[12/18/07] Why is there grading information not shown north of the
culvert at the southwest corner of the site? (see ID #48)
R Revised.
Number: 74 Created: 12/20/2007
112/20/071 Stormwater brought up the retaining wall shown along the
north boundary of the site and its location adjacent to the property line. It
would appear to be difficult to have this wall constructed without
permission from the property owner to the north. A letter of intent should
be provided from the owner to the north or the design should be revised (or
demonstrated) not to encroach offsite.
R The retaining wall along the north boundary has been removed. Therefore a
construction casement is not being provided. A fence will be installed along the
north boundary at the request of the Parkway Townhomes P.U.D. home owners.
Please refer to Revised Site Plan and fence details provided.
Topic: General
Number: 37 Created: 12/ 18/ 2007
[12/ 18/07] Please remove PDP from all the document titles. The naming of
the project as "Pavilion Lane" would be awkward with sharing the same title
as the street. Pavilion Place (as apparently titled in our comment sheets) or
some other title would be preferred.
R The project name has been changed to "The Plaza at Pavilion Lane". All
documents have been revised.
Number: 38 Created: 12/ 18/2007
[12/18/07] Per the Development Review Engineering Manager's review of
the Transportation Development Review Fee submittal, an additional
$7,957.50 in fees is required.
R Acknowledged.
Number: 39 Created: 12/ 18/2007
[12/18/07] Figure 19-6 of LCUASS specifies parking stall setback
requirements from public streets. The commercial local street classification
of Pavilion Lane combined with the 1580 daily trips specifies a parking stall
setback of 50' when 30' is provided. The handicap parking stall should
ideally be moved to the adjacent stall with this parking stall removed. (See
next comment regarding the design of the stall.)
R Acknowledged. All plans have been revised.
Page 12
Z:\Clients\W-Clients\., illco Development\1592-07-07 Lot 1 Goodwill Lndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Department: Current Planning Issue Contact: Steve Olt
Topic: Transportation Planning
Number: 77 Created: 12 / 21 / 2007
[12/21/071 Denise Weston of the Transportation Planning Department
offered the following comments:
a. Please denote all sidewalk widths on the development plans.
R Shown.
b. Please make smoother "curved" transition of the public sidewalk at the
southwest corner of the site.
R The Site Plan has been adjusted to reflect the smoother walk alignment noted with
the Final Utility Plans as originally submitted.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plans
Number: 44 Created: 12/ 18/2007
[12/18/07] The construction drawings do not need to have Landscape Plan
information shown.
R Landscape plan information has been removed from the construction drawings.
Number: 45 Created: 12/ 18/2007
[12/18/07] On Sheet 3 for Note 1 add "Limits of street repair are
approximate. Final limits to be determined in the field by the City
Engineering Inspector. All repairs are to be in accordance with City
Standards.
R This note was already included as a supplemental general note on sheet 1 (Cover
Sheet) of the Final Utility Plans. This note has also been added to Master Utility
Plan Construction Note 1 on Sheet 3 as requested.
Number: 46 Created: 12/ 18/2007
[12/18/07] On the plan view of the construction drawings please show the
indication of truncated dome detectable warnings on either side of the
driveway out to Pavilion Lane just to sure it isn't assumed that scoring lines
are needed (realizing that the truncated dome warnings are accurately
reflected on the detail sheets).
R A Supplemental General Note was added to Sheet 1 (Cover Sheet) that reads as
follows:
All new handicap ramps shall be constructed according to City standards and include
CDOT standard truncated dome bricks (to be colored river red) according to sheet 1
of 4 of Al-608-1 of CDOT M standards.
Page 11
Z:\Clients\W-Clientsrr✓illco Development\1592-07-07 Lot 1 GoodwiL ndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 55 Created: 12/ 19/2007
[12/ 19/07] Trash enclosure on the south side of the property and on the
Landscape Plan do not match. Resolve conflict. Consider moving this
enclosure to the north side of the parking lot as a means of reducing the
visual impacts from Pavilion Lane.
R The landscape conflict has been resolved. The enclosure has been left on the south
side of the parking lot because it would interfere with the site pedestrian pattern
on the north. The exterior of the enclosure that faces the public street is faced with
a stone material that matches with the buildings that gives the impression of an
amenitv.
Number: 56 Created: 12/ 19/2007
[12/19/07] Remove landscape plants from Site Plan. Only show on the
Landscape Plan.
R Landscaping has been removed from the Site Plan.
Number: 84 Created: 12 / 21 / 2007
[ 12 / 21 / 07] Add natural area buffer line to the plan. Show and label the
top of embankment of the Larimer County Canal Ditch #2 on the plan. This
line was identified in the field on a site visit between Don Ennis and Dana
Leavitt. If the buffer line extends into the property, align with the edge of
pavement on the parking lot and extend out to the maximum of 50' north
and south of the parking lot.
R Previous comments gave this width as 30', which is shown on the plan.
Number: 85 Created: 12 / 21 / 2007
[12/21/07] The trash enclosure in the northwest corner of the site
currently lies within the natural area buffer. If the enclosure lies within the
ultimate buffer zone, it shall be relocated outside of the buffer area.
R The northwest trash enclosure does not encroach into the natural area buffer line.
Number: 86 Created: 12 / 21 / 2007
[12/21/07] The trash enclosure located adjacent to Pavilion Lane may be
more appropriately located on the north side of the parking lot. This would
put the enclosure an additional 40' north of the roadway.
R The landscape conflict has been resolved. The enclosure has been left on the south
side of the parking lot because it would interfere with the site pedestrian pattern
on the north. The exterior of the enclosure that faces the public street is faced with
a stone material that matches with the buildings that gives the impression of an
amenity.
Page 10
Z:\Clients\W-Clientsr.villco Development\1592-07-07 Lot 1 Goodwii, ,ndustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 27 Created: 12/ 18/2007
Al2/ 18/07] Show the setback distance for the parking areas from the west,
south, and north property lines on the Site Plan.
R Added for each area.
Number: 28 Created: 12 / 18 / 2007
✓/[12/18/07] All sidewalk widths, internal to the site and along the streets,
must be shown on the Site Plan.
R Added.
�Number: 35 Created: 12/ 18/2007
2/18/07] For the 3 pad sites, show the building setbacks from the
adjacent street rights -of -way.
R Building setbacks from street are noted.
Number: 36 Created: 12/ 18/2007
[12/18/07] Are the Typical (parking) Stalls dimensions the same
throughout the project?
R The varying sizes are denoted.
,Number: 79 Created: 12 / 21 / 2007
[12/21/07] In the BUILDING DATA table, there should be a height for
Building 4, the hotel.
R The hotel's height has been added.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Site Plan
Number: 53 Created: 12/ 19/2007
[12/19/07] Add the natural area buffer line. Measure from top of
embankment to edge of parking drive within property. Show the top of
embankment of the Site Plan. Refer to the redline plan for complete location
of buffer line.
R The natural buffer area is shown on the Site Plan and measured per our
discussion with Dana Leavitt on the site.
Number: 54 Created: 12/ 19/2007
[12/ 19/07] The trash enclosure in the northwest corner of the property is
located within the buffer area. Locate this trash enclosure outside of the
buffer area.
R The northwest trash enclosure does not encroach into the natural area buffer line.
Page 9
Z:\Clients\W-Clients\.. illco Development\1592-07-07 Lot I Goodwih .adustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Topic: Lighting Plan
Number: 58 Created: 12 / 19 / 2007
✓[12/ 19/07] Include a schedule of fixtures on Lighting Plan.
R Added.
Number: 83 Created: 12 / 21 / 2007
[ 12 / 21 / 07] Add schedule of fixtures to plan. Will require all lights adjacent
to the natural area buffer be equipped with exterior house side shields.
R Added.
Topic: Plat
Number: 52 Created: 12/ 19/2007
[12/ 19/07] Show buffer line on west property line. Add note to plat "Refer
to Section 3.4.1(E)(2) for allowable uses within a natural area buffer."
R Buffer Zone added to Southwest corner of subject property. Note added to plat.
Number: 82 Created: 12 / 21 / 2007
[ 12 / 21 / 07] Add the buffer zone line to the plat based upon final location
derived from Site Plan. Label buffer zone as a natural area buffer. Add note
to Plat: "Refer to Section 3.4.1 (E) (2) of the City of Fort Collins Land Use
Code for allowable uses within a natural area buffer zone.
R Buffer Zone added to Southwest corner of subject property. Note added to plat.
Department: Current Planning Issue Contact: Steve Olt
Topic: Site Plan
Number: 23 Created: 12/ 18/2007
s2/ 18/07] Please remove the landscaping from the Site Plan. There is a
separate Landscape Plan for that information. Also, the "conceptual"
andscaping on the Site Plan is not consistent with the actual Landscape
Plan. The drawing as submitted is cluttered and difficult to read.
R Acknowledged. Landscaping has been removed from the Site Plan.
Number: 24 Created: 12/ 18/2007
'[12/18/07] Building 2 and the Hotel should have bicycle racks in
convenient locations next or near to them.
R Building 1 and 2 share a bicycle rack. Bicycle racks have been added to the hotel.
umber: 25 Created: 12/ 18/2007
V [12/ 18/07] The "Sight" Triangles are misspelled on the Site Plan.
R Acknowledged & Corrected.
I
mber: 26 Created: 12/ 18/2007
11 2/18/07] The street widths and right-of-way widths for both JFK
Parkway and Pavilion Lane should be shown on the Site Plan.
R Street widths and right-of-way widths have been added to the Site Plan.
Page 8
Z:\Clients\W-Clients\.. dlco Development\1592-07-07 Lot 1 Goodwilt...dustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Department: Current Planning Issue Contact: Steve Olt
Topic: Landscape Plan
Number: 29 Created: 12/ 18/2007
[12/18/071 Laurie D'Audney, the City's Water Conservation Specialist,
,/indicated that she is forwarding a Water Conservation Standards for
Landscapes COMMENT SHEET and the City of Fort Collins Water
Conservation Standards for LANDSCAPING and IRRIGATIONS General
information to the Applicant. These items are attached to this comment
letter.
R The landscape plans incorporate the Water Conversation Standards.
Number: 32 Created: 12/ 18/2007
J12/ 18/071 Please revise the 3 building pad site notes to say: FUTURE
V LANDSCAPING TO BE PROVIDED BY DEVELOPER OF PAD SITE, TYPICAL,
THROUGH THE CITY'S MINOR AMENDMENT REVIEW PROCESS.
R This note has been added as directed.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Landscape plan
Number: 59 Created: 12 / 19 / 2007
[12/ 19/071 Show buffer line on Landscape Plan. Coordinate with Site Plan.
.'Add a ground cover level of plants within the buffer area between the
✓ parking lot and the property line. Additional plants are needed between the
edge of the ditch and Lot 3. Use all native plants within the buffer zone.
R The natural buffer area is shown on the Landscape Plan and the landscape area
adjacent to the ditch has added plants.
Number: 60 Created: 12/ 19/2007
[12/19/071 Use organic material within the buffer zone instead of cobble
mulch.
R The ten foot (10') buffer area is on a considerable slope. Stormwater has indicated
that organic material would not be preferable due to washing and potential
clogging of stormwater facilities. As we understand it, this item will be further
discussed among staff.
Number: 88 Created: 12 / 21 / 2007
[12/21/07] Add buffer line as derived from Site Plan.
R The natural buffer area is shown on the Landscape Plan.
Number: 89 Created: 12 / 21 / 2007
[12/21/071 Additional plant material is needed in the plant beds within and
adjacent to the buffer area. All plants are to be native species conducive to
improving wildlife habitat. Refer to the red -lines for location of additional
planting requirements.
R Acknowledged. Additional plant material has been added.
Page 7
Z:\Clients\W-Clients\.aillco Development\1592-07-07 Lot 1 Goodwilt.adustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
* Reduced copies, one (1) each to 8.5" x 11", of the Site, Landscape, and
Building Elevations Plans by Wednesday, January 2nd. Prefer to have them
sent electronically to rmichelsffcgov.com.
R Acknowledged.
* One (1) each of rendered (colored) Site and/or Landscape Plan, and
Building Elevations by Wednesday, January 9th. Prefer to have them sent
electronically to rmichelofcgov.com.
R Acknowledged.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 90 Created: 12 / 21 / 2007
[12/21/071 I will need to see revised plans no later than January 4th to
keep the project on the P&Z Board agenda. The following plans are required
for review:
- Plat
- Site Plan
- Landscape Plan
- Grading Plan
- Horizontal Control Plan
- Utility Plan
R Acknowledged. Revised plans have been provided.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Grading
Number: 57 Created: 12/ 19/2007
[12/ 19/07] Show the top of embankment and buffer line on Grading Plan.
Coordinate with Site Plan.
R The top of the embankment as located in the field with Mr. Leavitt, is now labeled
on the grading plan. The buffer line is also shown.
Topic: Utility Plans
Number: 87 Created: 12 / 21 / 2007
[12/21/071 Show natural area buffer on all plans as derived from the Site
Plan.
R The natural buffer area is shown on the Site Plan.
Page 6
ZAClients\W-Clients, ,, illco Development\1592-07-07 Lot 1 GoodwiL .,idustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Lieht &, Power/Alan Rutz
a. He has not further comments prior to public hearing.
R Thank you.
Number: 80 Created: 12 / 21 / 2007
[12/21/071 Apparently there is a proposed retaining wall shown on the
construction drawings at the northeast corner of the site that is not shown
on the Site & Landscape Plans. Please show this wall on all plans. How is it
going to be built?
R The retaining wall along the north boundary has been removed. Therefore a
construction easement is not being provided. A fence will be installed along the
north boundary at the request of the Parkway Townhomes P.U.D. home owners.
Please refer to Revised Site Plan and fence details provided. The fence is also
shown on the Master Improvements Plan in the Final Utility Plans.
Number: 81 Created: 12 / 21 / 2007
[12/21/07] After discussion at staff review on December 19th it was
determined that the plans with this development proposal are in a
condition to be able to be scheduled for a Planning Ss Zoning Board
public hearing. Therefore, the item has been placed on the January 17,
2008 P&Z Board agenda. However, several departments need to see some
revised plans prior to the hearing. Please contact the following staff directly
for information on what they need and by when to enable the item to stay
on the agenda:
* Marc Virata/Engineering ... 221-6605
* Basil Hamdan/Stormwater ... 224-6035
* Roger Buffington/Water & Wastewater ... 221-6854
* Dana Leavitt/Environmental Planner ... 224-6143
Current Planning (Steve) needs the following information:
R Acknowledged.
* Eight (8) full-size plans each of revised Site, Landscape, Building
Elevations, and Site Lighting Plans, addressing the comments in this letter,
by Friday, January 4th.
R Acknowledged.
Page 5
Z:\Clients\W-Clients\..illco Development\1592-07-07 Lot 1 GoodwiL...dustries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
d. The handicapped parking space and the next conventional space just to
the northwest of the entry into the site may have to be eliminated because
they do not meet the 50' setback distance requirement from the street
flowline. The setback distance is for safety reasons.
R Acknowledged. All plans have been revised.
e. The Larimer County Canal No. 2 ditch company must be notified, with
plans provided to them. City staff needs some form of response from the
ditch company prior to the P8sZ public hearing. The ditch company will have
to sign the Final construction documents.
R Plans were provided to Fischer and Fischer, LLP on December 20, 2007. Fischer
and Fischer, LLP represents the Larimer County Canal No. 2 Irrigating
Company. Attached is a letter from Fischer and Fischer, LLP dated December 27,
2007. The letter generally indicates that there are no issues of concern.
R There is an approval block for the Larimer County Canal No. 2 Irrigating
Company on the Cover Sheet of the Final Utility Plans. There is also a signature
block for the Larimer County Canal No. 2 Irrigating Company on the Final Plat.
f. There are numerous inconsistencies between plans. The construction
drawings must be coordinated, made consistent, with the Site Plan.
R Acknowledged. Plans have been coordinated.
g. Please take the Landscape Plan out of the construction drawing set.
R The Landscape Plan has been removed from the construction drawing set.
Water & Wastewater/Roger Buffington
a. Poudre Fire Authority and Water & Wastewater need to talk about the
proposed fire hydrant locations.
R We had met personally with Carie Dann with the Poudre Fire Authority prior to
placing fire hydrants. We understand that Roger Buffington is interested in
coordinating fire hydrant locations further with the Poudre Fire Authority.
b. The department's comments are relatively minor.
R Thank you.
Transportation Planning/Denise Weston
a. Please smooth out the sidewalk transition at the southwest corner of
the site.
R The Site Plan has been adjusted to reflect the smoother walk alignment noted with
the Final Utility Plans as originally submitted.
b. All sidewalk widths must be shown on the development plans.
R Sidewalk widths are noted on the Master Improvements Plan of the Final Utility
Plans.
Page 4
Z:\Clients\W-Clients\—tllco Development\1592-07-07 Lot 1 Goodwili—Austries of Denver Sub
FC\Documents\Correspondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
b. The proposed fence as shown along the west property line is not
consistent with the purpose of the wildlife corridor. If a fence is to be
installed in this location it should be something like an open, 3-rail fence.
One is not required.
R A fence will not be provided along the west property line and wildlife corridor.
Plans have been revised.
c. The proposed landscaping along the west property line is insufficient to
mitigate the allowable reduced buffer distance. Also, native plants must be
used in this area.
R Acknowledged.
d. A schedule of lighting fixture types is needed on the Site Lighting Plan,
or another plan added to include this information. Technically, a
Photometric Plan showing spot lighting levels is normally provided.
R Acknowledged.
e. There appears to be a potential safety issue with the detention pond -
public sidewalk relationship at the southeast corner of the site, adjacent to
the 2 streets.
R Handrails will be provided for safety purposes similar to those provided with the
Goodwill detention pond immediately south of this site. Handrails have been noted
on the Final Utility Plans. Handrail details will be provided.
R Please note that Goodwill did not provide handrails for safety adjacent to John F.
Kennedy Boulevard.
Engineering/Marc Virata
a. Please remove the reference to PDP from the plans. PDP really refers to
a particular phase in the City's development review process.
R PDP has been removed from all plans and the final plat.
b. Pavilion Lane, being the adjacent street, may be confusing as the
project name. Possibly "The Plaza at Pavilion Lane", or something like that,
would be a better name.
R The project name has been changed to "The Plaza at Pavilion Lane". All
documents have been revised.
c. Additional Transportation Development Review Fees are due. They must
be paid to the Development Review Center prior to this project going to a
Planning & Zoning Board public hearing, such as with the next informal
submittal.
R Acknowledged.
Page 3
Z:\Clients\W-Clients\.. dlco Development\1592-07-07 Lot I Goodwih .Austries of Denver Sub
FC\Documents\Coaespondence\Responses\01-03-2008 response to 12-21-2007 Pavilion Lane PDP Comments.doc
Number: 31 Created: 12/ 18/2007
[12/ 18/07] Bonnie Ham of the U.S. Postal Service indicated that the
Developer is responsible for providing mailbox(es) for businesses. The
preferred location is on Pavilion Lane close to the entrance to the site. Please
contact Bonnie at 214-3668 (cell).
R We have contacted Bonnie Ham of the U.P.S. and discussed a location for the
mailboxes. She is going to give us a relative mail volume to determine the best
mailbox configuration.
Number: 33 Created: 12/ 18/2007
✓[121181071 A detail is needed for the Trash Enclosures. Materials and
colors must be consistent with the buildings.
R See Building Elevation Sheet 2.
Number: 34 Created: 12/ 18/2007
✓[12/ 18/07] A detail showing the style, height, material(s), and general
color(s) for the proposed fences on the west and north property lines is
needed. anl�
R A detail is shown on LS-2 of the Landscape submittal.
R A fence will not be provided along the west property line and wildlife corridor.
Plans have been revised.
Number: 78 Created: 12 / 21 / 2007
[12/21/07] The following comments were offered by City staff at the staff
review meeting on December 19, 2007:
Stormwater/Basil Hamdan
a. Generally, this is a very good set of development plans. They are
substantially complete.
R Thank you.
Environmental Planner/Dana Leavitt
a. The required buffer line for the Larimer County Canal No. 2 ditch along
the west side of the property must be clearly shown on all plans. The buffer
line must be a minimum of 30' from the "top of bank", which is reduced
from the normally required 50'.
R Acknowledged.
Page 2
Citv of Fort Collins
(Min
STAFF PROJECT REVIEW
Ennis Associates
c/o Don Ennis
13994 Turnberry Court
Broomfield, CO 80023
303-465-2983
Date: 12 / 21 / 2007
Staff has reviewed your submittal for PAVILION LANE PDP - TYPE 2, and
we offer the following comments:
January 4, 2008 written response to comments
See end of this response for attachments
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Number: 61 Created: 12 / 19 / 2007
v412/ 19/07] There is a legend with letter -designated colors for the buildings
on the plans. However, none of the elevations clearly differentiate what area
is what.
R The letter designations have been added to the individual elevations.
Number: 62 Created: 12/ 19/2007
[12/ 19/07] Identify the various materials on the building plans.
R The exterior of the building is shown as colored EFIS or masonry by poche
designation. u � uGi W� e2rn?
Number: 63 Created: 12/ 19/2007
2/ 19/07] Several building bays on the north, south, and east elevations
exceed 30' in length and the plans do not clearly depict if these bays satisfy
the standards set forth in Section 3.5.3(D)(2) of the Land Use Code.
R The room layout in the hotel has been modified to provide building offsets for the
referenced section.
Topic: General
Number: 30 Created: 12/ 18/2007
[12/18/071 Rick Lee of the Building Department indicated that he is
forwarding a copy of the Codes and Standards that his department will
enforce. It is attached to this comment letter. Also, please note that a Pre -
submittal Code Review Meeting is required and should be scheduled with
him.
R Acknowledged.
Page I